Permanent Occupancy | | 2/28/1997 | 2/28/1997 | | DONE |
|
|
|
|
INSP - Final | 2/28/1997 | 2/28/1997 | 2/28/1997 | A | PASS |
|
|
|
final occupancy appproved
|
Permanent occupancy | | | 2/28/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #6797 issued 2-28-97 to Extended Stay America.
|
INSP - Final | 2/11/1997 | 2/12/1997 | 2/11/1997 | A | PART |
Jim Storey
|
|
|
02/11/97 301 - FINAL FOR C/O. FNL -OK FINAL pending code enforcement sign off.
|
INSP - Final | 2/6/1997 | 2/6/1997 | 2/7/1997 | P | PART |
Jim Storey
|
|
|
02/07/97 301 - part
|
INSP - Final | 1/29/1997 | 1/29/1997 | 1/29/1997 | P | PART |
Jim Storey
|
|
|
01/29/97 301 - TCO -TEMP C OF O ISSUED ADA HEIGHTS C/N 90 DAY OCC.
|
Temporary occupancy | | | 1/29/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3355 issued 1-29-97 to Extended Stay American, Inc.
|
INSP - Final | 1/27/1997 | 1/28/1997 | 1/28/1997 | A | PART |
Jim Storey
|
|
|
01/28/97 301 - MET W/STEVE W/ACME HE WILL FAX THE FIRE ASSMBLY TO ME FOR
|
INSP - Temporary occupancy | 1/22/1997 | 1/23/1997 | 1/23/1997 | | PASS |
|
|
|
Art Yingling insp. for Temp. Occ. - Bond $852.00/complete landscape around dumpster area/H/C Sign/shield lighting
|
INSP - Final | 1/22/1997 | 1/23/1997 | 1/23/1997 | P | NR |
Jim Storey
|
|
|
01/23/97 301 - FINAL FOR C/O. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 1/21/1997 | 1/22/1997 | 1/22/1997 | P | NR |
Jim Storey
|
|
|
01/22/97 301 -
|
INSP - Final | 1/17/1997 | 1/21/1997 | 1/21/1997 | A | FAIL |
|
|
|
c/n issued.....temp on hold for corridor penetration problems at electrical closets.
|
INSP - Final | 1/21/1997 | 1/21/1997 | 1/21/1997 | P | FAIL |
|
|
|
reinspection for corridor and air pressure alarms. both not complete, dropped off code reference 1/22 regarding air pressure monitoring requirements
|
INSP - Final | 1/17/1997 | 1/21/1997 | 1/21/1997 | A | FAIL |
Jim Storey
|
|
|
01/21/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Conference | 1/16/1997 | 1/17/1997 | 1/17/1997 | A | NR |
Jim Storey
|
|
|
01/17/97 301 - SEE NATHAN - HE NEEDS ADVICE ON FINAL INSPECTION - WOULD IF POSSIBLE
|
INSP - Final | 1/15/1997 | 1/15/1997 | 1/15/1997 | P | FAIL |
|
|
|
alarm system tested, c/n issued for problems. Sprinklers off, not able to test tampers, other lif safety issues delayed until alarms complete at contractors request
|
INSP - Final | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | FAIL |
|
|
|
tested sprinkler flow alarms and dry system time test. all passed.......alarms not complete, tampers not connected, will call when ready
|
INSP - Ceiling grid | 12/20/1996 | 12/23/1996 | 12/23/1996 | P | PASS |
Jim Storey
|
|
|
12/23/96 301 - SUSPENDED CEILING - 1ST FLOOR SCLG-OK SUSPENDED CEILING
|
INSP - Framing/Rough-in | 12/6/1996 | 12/9/1996 | 12/9/1996 | A | PASS |
Jim Storey
|
|
|
12/09/96 301 - FRAM-OK FRAMING fire wall ok back of entry
|
INSP-Supply line flush | 12/2/1996 | 12/3/1996 | 12/3/1996 | A | CANC |
|
|
|
12/03/96 405 - 10 AM, LAST SEGMENT OF SPRINKLER INSPECTIONS duplicate entry
|
INSP-Supply line flush | 12/2/1996 | 12/3/1996 | 12/3/1996 | A | PASS |
|
|
|
12/03/96 405 - TOD WOODS - ###-#### flush witnessed
|
INSP-Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PASS |
|
|
|
MET WITH CONTRACTOR AND DESIGNATED LOCATION OF STRIPING FOR FIRE LANE AND kNOX BOX LOCATION
|
INSP-Sprinkler Rough-in/Hydro | 11/26/1996 | 11/26/1996 | 11/26/1996 | P | PART |
|
|
|
TODD WOOD -(SHOP) ###-#### HE WOULD LIKE THIS EARLY P.M. hydro wet, dry, fdc....need ug flush
|
INSP - Wall cover | 11/25/1996 | 11/25/1996 | 11/25/1996 | P | FAIL |
Jim Storey
|
|
|
11/25/96 301 - LOBBY AREA - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED n/r with rated const. at sout lobby entry.
|
INSP - Wall cover | 11/21/1996 | 11/22/1996 | 11/22/1996 | P | NR |
Jim Storey
|
|
|
11/22/96 301 - PARTIAL - LOBBY AREA n/r
|
INSP - Fire Dept. Request | 11/15/1996 | 11/15/1996 | 11/15/1996 | | PASS |
|
|
|
/ / 405 - recheck corridor supports and south wing attic piping ok to cover, one addl support req'd, will check from catwalk
|
INSP-Sprinkler Rough-in/Hydro | 11/14/1996 | 11/15/1996 | 11/15/1996 | A | NR |
|
|
|
11/14/96 405 - not ready, return pm
|
INSP - Framing/Rough-in | 11/13/1996 | 11/14/1996 | 11/14/1996 | P | PART |
|
|
|
11/14/96 333 - FRAM-OK FRAMING south wing upper
|
INSP - Energy code compliance | 11/12/1996 | 11/12/1996 | 11/12/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - north wing 2nd floor, south wing 1st floor INSL-OK INSULATION-ENERGY CODE FRAM-OK FRAMING
|
INSP - Energy code compliance | 11/12/1996 | 11/12/1996 | 11/12/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - north wing 2nd floor, south wing 1st floor INSL-OK INSULATION-ENERGY CODE FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 11/8/1996 | 11/12/1996 | 11/12/1996 | P | PASS |
Jim Storey
|
|
|
11/12/96 301 - 1ST FLOOR south wing ok for cover FRAM-OK FRAMING INSL-OK INSULATION-ENERGY CODE
|
INSP - Framing/Rough-in | 11/8/1996 | 11/8/1996 | 11/8/1996 | | PART |
Jim Storey
|
|
|
11/08/96 301 - INSL-OK INSULATION-ENERGY CODE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED FOR PIPE PENATRATIONS. OK TO ALL BUT THOSE P
|
INSP-Sprinkler Rough-in/Hydro | 11/7/1996 | 11/8/1996 | 11/8/1996 | A | PART |
|
|
|
2ND FLOOR AND ATTIC OF FIRST WING attic not complete, need more supports in corridor, do not cover corridor
|
INSP - Framing/Rough-in | 11/7/1996 | 11/8/1996 | 11/8/1996 | P | PART |
Jim Storey
|
|
|
11/08/96 301 - INSL-OK INSULATION-ENERGY CODE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED FOR PIPE PENATRATIONS. OK TO ALL BUT THOSE P
|
INSP - Framing/Rough-in | 11/6/1996 | 11/7/1996 | 11/7/1996 | P | FAIL |
Jim Storey
|
|
|
11/07/96 301 - 2 ND FLOOR OF NORTH WING. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 11/5/1996 | 11/6/1996 | 11/6/1996 | A | CANC |
Jim Storey
|
|
|
11/05/96 301 - CANCLED BY CONTRACTOR VIA PHONE. 1ST FLOOR
|
INSP - Framing/Rough-in | 10/28/1996 | 10/28/1996 | 10/28/1996 | P | PART |
Jim Storey
|
|
|
10/28/96 301 - BOTTOM FLOOR - NORTH WING. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OK TO START INSULATION
|
INSP - Carpentry | 10/17/1996 | 10/17/1996 | 10/17/1996 | | PART |
Jim Storey
|
|
|
/ / 301 - FIRST FLOOR CEILLING N/SOUTH CORRORDOR OK TO ROCK.
|
INSP - Framing/Rough-in | 10/17/1996 | 10/17/1996 | 10/17/1996 | P | PASS |
Jim Storey
|
|
|
10/17/96 301 - ROOF NAILING NORTHWING OK
|
INSP - Roof | 10/16/1996 | 10/16/1996 | 10/16/1996 | P | PASS |
Jim Storey
|
|
|
10/16/96 301 - ROOF SHEATHING NAILLING NORTH WING OK
|
INSP - Wall cover | 10/14/1996 | 10/15/1996 | 10/15/1996 | A | PART |
Jim Storey
|
|
|
10/15/96 301 - NORTH CORRIDOR CEILLING OK FOR COVER ONLY THE CEILLING DR AND CAN BE VERRIFIED FROM THE ROOM SIDE.
|
INSP-Sprinkler Rough-in/Hydro | 10/14/1996 | 10/14/1996 | 10/14/1996 | P | PART |
|
|
|
10/14/96 405 - rough in for cover, first floor only
|
- INSP SPRINKLER ROUGH-IN/HYDR | 10/1/1996 | 10/1/1996 | 10/1/1996 | | PASS |
|
|
|
/ / 405 - ug hydro.....not yet flushed
|
INSP - Conference | 9/6/1996 | 9/6/1996 | 9/6/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - cost conf.
|
INSP - Footings | 9/3/1996 | 9/4/1996 | 9/4/1996 | P | PART |
Jim Storey
|
|
|
/ / 301 - POURING AT 10 A.M. covered by special insp. dust control req CI-LETTER OF COMPLIANCE ISSUED 11578
|
INSP - Footings | 8/29/1996 | 8/29/1996 | 8/29/1996 | P | PART |
Jim Storey
|
|
|
08/29/96 301 - covered by si pending report
|
(F) Reprint permit | | | 8/28/1996 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/27/1996 | | |
|
|
|
|
Print Occupancy Form | | | 8/26/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/26/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/26/1996 | | |
|
|
|
|
Print Occupancy Form | | | 8/26/1996 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/1996 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/23/1996 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 8/23/1996 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/23/1996 | | PEND |
|
|
|
|
Routing - MECHANICAL | 8/21/1996 | | 8/23/1996 | | PASS |
|
|
|
|
Routing - MECHANICAL | 8/7/1996 | | 8/9/1996 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 8/6/1996 | | FAIL |
|
|
|
SECOND CORRECTION NOTICE SENT
|
90 day tracking............. | | 4/26/1996 | 7/25/1996 | | |
|
|
|
|
Plan Received by (M_P) | 5/29/1996 | | 7/5/1996 | | PASS |
Mike Phillips
|
|
|
07/05/96 09:06:00 KMM - this action updated by action script from <<>> in Case No. BLD96-1762
|
Routing - FIRE | 6/26/1996 | | 6/27/1996 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 6/4/1996 | | 6/24/1996 | | FAIL |
|
|
|
CALLED DAVE RICHARDS TO PICK UP PLANS AND TAKE TO ACHD. 6/3/96 DAR ACHD FEES NOT PAID.
|
Unassigned to Plan Reviewer | | | 6/3/1996 | | PASS |
|
|
|
06/03/96 15:44:05 M_P - this action updated by action script from <<>> in Case No. BLD96-1004
|
Plan Reviewer's activity | | | 6/3/1996 | | FAIL |
|
|
|
SENT CORRECTIONS
|
Plan Reviewer's Copy of Permit | | | 6/3/1996 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 5/23/1996 | | 5/28/1996 | | PASS |
|
|
|
|
Routing - ELECTRICAL | 5/22/1996 | | 5/23/1996 | | PASS |
|
|
|
|
Routing - MECHANICAL | 5/20/1996 | | 5/22/1996 | | PASS |
|
|
|
|
Routing - PLUMBING | 5/13/1996 | | 5/17/1996 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/6/1996 | | 5/13/1996 | | FAIL |
|
|
|
|
Routing - PLANNING | 4/30/1996 | | 5/6/1996 | | PASS |
|
|
|
X-ref: DR-31-96. Approved by MS.
|
Plan routing begun/NEW & ADDTN | | | 4/30/1996 | | PASS |
|
|
|
|
Plans taken to Plan Check | | | 4/26/1996 | | |
|
|
|
|
Application received | | | 4/26/1996 | | |
|
|
|
|
GAY'S RECEIPT FOR PARTIAL PAY | | | 4/26/1996 | | |
|
|
|
|
Routing - BUILDING | 5/28/1996 | | | | PEND |
|
|
|
|
Routing - BUILDING | 6/27/1996 | | | | PEND |
|
|
|
|
Routing - BUILDING | 6/26/1996 | | | | PEND |
|
|
|
|
Routing Off Site - A.C.H.D | 8/23/1996 | | | | PASS |
|
|
|
received achd receipt 07/01/96
|
Routing - BUILDING | 8/9/1996 | | | | PEND |
|
|
|
|
Routing - BUILDING | 8/9/1996 | | | | PEND |
|
|
|
|