Permit Information
Permit NumberBLD96-01237
StatusFinaled
Name ST ALPHONSUS NEPHROLOGY CENTER
Site Address 5610 W GAGE ST
Project NameST AL'S
Customer Number 
ePlanReviewNo
Description
SAINT ALPHONSUS NEPHROLOGY CENTER OF BOISE - TO CONSTRUCT A ONE STORY 13,662 S.F. MEDICAL TREATMENT BUILDING. CONSTRUCTION WILL BE STEEL FRAME WITH CONCRETE SLAB AND EIFS EXTERIOR. PERMIT ALSO COVERS ALL SITE WORK, PAVING, LANDSCAPING AND A TRASH ENCLOSURE. A 2 HR. AREA SEPARATION WALL IS TO BE INSTALLED PER APPROVED PLANS TO REDUCE OCCUPANT LOADS FOR NON-RATED EXIT CORRIDORS. FIRE SPRINKLERS ARE USD FOR THE NON-RATED CORRIDORS AT THIS TIME. ALL WORK IS PER DR#121-95, APPROVED PLANS AND ATTACHMENTS AND 1994 UBC. ALL OCCUPANTS AS PURPOSED ARE AMBULATORY.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/25/19973/25/1997 DONE
Details
Permanent occupancy  3/25/1997 PASS
Perm. Occ. Cert. #6814 issued 3-25-97 to St. Al's Nephrology Center.
INSP - Final3/24/19973/24/19973/24/1997 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
INSP - Final2/27/19972/28/19972/28/1997PPASS
Details
02/28/97 338 -
Routing for occupancy2/27/19972/27/19972/27/1997 PASS
Art Yingling insp. - meets compliance w/DR-121-95 - Signed Final.
INSP-Conference2/27/19972/27/19972/27/1997 PASS
DetailsJoe Tawney
/ / 406 - CONF SPKLR PROBLEM RESOLVED
INSP - Final2/26/19972/27/19972/27/1997PPART
DetailsJoe Tawney
02/27/97 406 - FINAL OK FOR TEMP OCC ALARM SUBMITTAL NOT APPROVED TAG E STRIPE OR SIGN FIRE DEPT ACCESS REWIRE 1 EMERG LIGHT
INSP - Final2/13/19972/14/19972/14/1997PPART
DetailsJoe Tawney
JOHN EATES ###-#### OK ON HYDRO TEST AND ROUGH IN
INSP - Ceiling grid2/6/19972/7/19972/6/1997APASS
Details
02/07/97 338 - made ok just finishing up the slack wires
CHANGE STATUS TO (D)  2/4/1997 PASS
INSP - Letter of compliance1/27/19971/27/19971/27/1997 PASS
DetailsJim Storey
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13226
INSP - Final1/27/19971/27/19971/27/1997 PASS
DetailsJim Storey
/ / 301 - FNL -OK FINAL
INSP - Letter of compliance1/27/19971/27/19971/27/1997 PASS
DetailsJim Storey
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13226
INSP - Carpentry1/27/19971/27/19971/26/1997PPASS
Details
01/27/97 338 - MADE OK
INSP - Framing/Rough-in11/27/199612/2/199612/2/1996AFAIL
Details
12/01/96 338 - c/n issued OTH-OTHER AGENCIES NOT APPROVED corridor walll penetrations elec 24" ect
INSP - Framing/Rough-in11/18/199611/18/199611/19/1996PPASS
Details
11/18/96 338 - EXTERIOR WALLS
INSP - Framing/Rough-in8/27/19968/28/19968/28/1996ACANC
Details
08/28/96 338 - this should be a found insp
INSP - Foundation8/28/19968/28/19968/28/1996 PASS
Details
/ / 338 - r-bar placed
INSP - Footings8/21/19968/21/19968/21/1996PPART
Details
REBAR partial footing pads ok
90 day tracking............. 5/16/19968/14/1996 PEND
(F) Reprint permit  8/14/1996
Inspection Record Card- Bld  8/13/1996
Print Occupancy Form  8/13/1996
Issue PAID IN FULL permit  8/13/1996
Plan Received by (M_O)5/31/1996 8/12/1996 PASS
Plans received for review
Permit taken to Permit Desk  8/12/1996 PASS
Plan Reviewer's Copy of Permit  8/12/1996 PASS
Routing - PLUMBING8/5/1996 8/6/1996 PASS
Routing - PLUMBING7/18/1996 7/27/1996 FAIL
Routing Off Site - STRUCTURAL7/19/1996 7/26/1996 PASS
RESUBS TO JONES 7/19/96
Meeting  6/11/1996 PEND
Had meeting with Ralph Kreizenbeck to discuss requirements for area walls and other possible options for the exit corridor on the medical building.
Routing - FIRE6/6/1996 6/10/1996 PASS
PACKAGE #1
INSP - Miscellaneous  6/6/1996 PEND
plan review comments sent and faxed to architect and copied to Kreizenbeck
Meeting  6/4/1996 PEND
MET WITH RALPH KREIZENBECK REGARDING CORRIDOR DESIGN ON THE PROPOSED PROJECT
Routing Off Site - STRUCTURAL5/20/1996 6/3/1996 FAIL
PACKAGE #3 SENT TO JONES ENGINEERING 5-20-96 VIA PDQ PACKAGE GIVEN TO MIKE OTTO. 6/3/96 TOTAL OF 16 ITEMS TO BE CORRECTED PER K. JONES STRUCTURAL ENGINEER.
Unassigned to Plan Reviewer5/16/1996 5/31/1996 PEND
05/31/96 16:36:20 M_O - this action updated by action script from <<>> in Case No. BLD96-1237
Routing - PLANNING5/23/1996 5/28/1996 PASS
X-ref: DR-121-95. Approved by TKW.
Routing - ELECTRICAL5/22/1996 5/23/1996 PASS
PACKAGE 1 SENT TO ELECTRICAL.
Routing - MECHANICAL5/21/1996 5/22/1996 PASS
Package 1 sent to Mechanical
Routing Off Site - A.C.H.D5/20/1996 5/22/1996 PASS
PACKAGE #4 SENT TO ACHD. CONTACTED RALPH KREIZENBECK AT ###-#### FOR PICKUP. RETURNED APPROVED WITH FEES PAID 5/22/96 DAR. STORED BEHIND BOB'S DESK.
Routing - PUBLIC WORKS5/20/1996 5/22/1996 PASS
PACKAGE #2 SENT TO P.W. FIRST 5-20-96
Routing - PLUMBING5/20/1996 5/20/1996 FAIL
PACKAGE #1 SENT TO PLUMB. FIRST 5-20-96
Plan routing begun/NEW & ADDTN  5/20/1996 PASS
GAY'S RECEIPT FOR PARTIAL PAY  5/16/1996
Received Certificate of Value  5/16/1996 PASS
Application received  5/16/1996
Plans taken to Plan Check  5/16/1996 PEND
Routing - BUILDING6/10/1996   PEND
Routing - BUILDING6/3/1996   PEND
Routing - BUILDING5/29/1996   PEND
PACKAGE #2 STORED BEHIND BOB'S DESK.
Routing - BUILDING8/6/1996   PEND
PACKAGE #1
Routing - BUILDING5/23/1996   PEND
PACKAGE #1 STORED BEHIND BOB'S DESK 5/23/96
Routing - BUILDING7/24/1996   PEND