Permit Information
Permit NumberBLD96-01321
StatusExpired
Name MOUNTAIN STATES TUMOR INSTITUT
Site Address 100 E IDAHO ST
Project NameST LUKES-MSTI
Customer Number 
ePlanReviewNo
Description
To complete the finish for the new areas of the basement and first floor of this office building as Phase 1, to relocate personnel from existing areas of basement and 1st floor,when approved for occupancy by involved agencies. into new areas and begin Phase 2, the demolition of existing areas & remodel thereof and Phase 3, approval and occupancy of entire areas of 1st and Basement. Basement & first floor areas shall have access to two complying exits at all times during project. All per approved plans, specs & required correction notes attached to approved plans on file. Work to be compatible for Type 1-FR Construction (noncombustible fire-resistive). Separate elec, plumb, & mech permits required. NOTE: This building is fully fire sprinklered. PC261-96/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/14/20002/14/20002/14/2000 DONE
(F) Reprint permit  1/27/2000 DONE
(F) Reprint permit  5/28/1999
INSP - Final3/25/19993/26/19993/26/1999APASS
Details
L.C. #16385 issued 3-26-99 - 338
INSP-Final Inspection3/24/19993/25/19993/25/1999APASS
DetailsRick Jackson
RON ###-#### occ approved
INSP-Final Inspection3/24/19993/24/19993/24/1999PCANC
DetailsRick Jackson
###-#### RON//FINAL FIRE rescheduled for 3/25
Temporary occupancy  1/27/1999 PASS
Temp. Occ. Cert. #3779 issued 1-27-99 to Mtn. States Tumor Institute - Phase I only.
Temporary occupancy  1/27/1999 PASS
Temp. Occ. Cert. #3780 issued 1-27-99 to Mtn. States Tumor Institute - Phase II.
Temporary occupancy  1/27/1999 PASS
Temp. Occ. Cert. #3781 issued 1-27-99 to MSTI, Phase III.
INSP-Final Inspection10/29/199810/30/199811/2/1998PPART
DetailsRick Jackson
ron cell ###-#### fn insp
INSP - Final10/29/199810/30/199810/30/1998APASS
Details
10/30/98 333 - ok to sign for perm
INSP - Final10/21/199810/22/199810/23/1998PFAIL
Details
10/22/98 333 - RON ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Final Inspection10/21/199810/22/199810/22/1998PFAIL
DetailsRick Jackson
RON ###-#### door hold-opens didn't release on alarm; sprinkler issues
INSP-Conference10/12/199810/12/199810/12/1998PPART
DetailsRick Jackson
fire pump room requires sprinklering and remove combustibles from above gridded ceiling
INSP-Sprinkler Rough-in/Hydro10/9/199810/9/199810/9/1998AFAIL
DetailsRick Jackson
combustibles above in corridors; head needed in bathroom; sway bracing needed; smoke detector too close to diffuser;
INSP - Wall cover10/8/199810/9/199810/9/1998AFAIL
DetailsJim Storey
10/09/98 301 - RON ###-#### CEILING COVER CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Final Inspection10/8/199810/9/199810/9/1998AFAIL
DetailsJim Storey
10/09/98 301 - RON ###-#### TRY TO BE THERE WITH STRUCTURAL INSPECTOR CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Sprinkler Rough-in/Hydro10/9/199810/9/199810/9/1998AFAIL
DetailsRick Jackson
sway bracing not done; combustibles above drop ceiling; needs head in bathroom by dressing rooms; smoke detector within 3 feet of diffuser
INSP - Framing/Rough-in6/29/19986/29/19986/29/1998PPASS
Details
06/29/98 333 - FRAM-OK FRAMING
INSP - Framing/Rough-in3/17/19983/18/19983/18/1998APART
Details
03/18/98 333 - framing ok BASEMENT CT SIMILATOR ROOM--RON ###-####
INSP - Final2/27/19983/2/19983/2/1998PPART
Details
03/02/98 333 - card signed for tempRON ###-####--MSTI
INSP-Final Inspection2/26/19982/27/19982/27/1998APASS
DetailsRick Jackson
PLEASE MEET RON AT 10:00--###-####--MSTI alarms, mag-hold opens, dampers all operational
INSP-Sprinkler Rough-in/Hydro2/26/19982/26/19982/26/1998APASS
DetailsRick Jackson
hydro completed/rough-in okay
INSP-Sprinkler Rough-in/Hydro2/13/19982/13/19982/13/1998AFAIL
DetailsRick Jackson
additional hangers needed in south/west end. comm. lines strapped to sprinkler piping.
INSP-Final Inspection2/12/19982/13/19982/13/1998APASS
DetailsRick Jackson
RON ###-####-###-####-KIM WILL BE GOING OUT ALSO-FIRE DAMPERS smoke/fire dampers operated correctly.
INSP - Framing/Rough-in2/12/19982/13/19982/13/1998APART
Details
02/13/98 333 - RON ###-####-CEILING GRID RICK WILL BE SCHEDULED TO GO OUT ALSO YOU MIGHT WANT TO GET WITH HIM. ceilings ok to cover dampers ok
INSP - Framing/Rough-in2/2/19982/3/19982/3/1998PPASS
Details
02/03/98 333 - SCLG-OK SUSPENDED CEILING
Inspection Record Card- Bld  1/30/1998
Print Occupancy Form  1/30/1998
INSP - Framing/Rough-in1/14/19981/14/19981/14/1998 PASS
Details
/ / 333 - phase 2frame ok 1st floor
INSP - Framing/Rough-in10/15/199710/16/199710/16/1997PPART
DetailsJim Storey
10/16/97 301 - 4 hr gyp atchment ok work in progess.
INSP - Carpentry10/16/199710/16/199710/16/1997APART
DetailsCarl Dependahl
GYP AT 4HR WALL...GOT FASTENER SCHED. FOR 4-LAYER GYP...301 WILL INSP AT PM.
INSP - Framing/Rough-in10/14/199710/15/199710/15/1997APART
DetailsCarl Dependahl
four hour wall exterior...333 AREA. NW CORNER 1ST FL EXT WALL. NEED TO SEE ATTACHMENT OF MULTI-LAYER GYPSUM.
INSP - Carpentry10/15/199710/15/199710/15/1997PNR
DetailsCarl Dependahl
333 AREA NW CORNER 1ST FL MSTI; CHK GYP LAYERS AT 4 HR WALL SECTION...nr, need recall insp.
INSP-Final Inspection8/7/19978/7/19978/7/1997PPASS
Details
1PM, RON all phase 1 items complete
INSP - Occupancy Sign-off7/30/19977/31/19977/31/1997APART
Details
07/31/97 333 - first phase ok for temp
INSP-Final Inspection7/30/19977/31/19977/31/1997AFAIL
Details
ELEV RECAL DOES NOT WORK
INSP - Temporary occupancy7/22/19977/23/19977/23/1997AFAIL
Details
07/23/97 333 - cn not made
INSP-Final Inspection7/23/19977/23/19977/23/1997PPART
Details
C.N ISSUED WITH ITEMS TO BE RESOLVED, OK FOR EMPLOYEES ONLY
INSP-Final Inspection7/21/19977/22/19977/23/1997PFAIL
Details
REINSPECT, ALARM TWESTING, C/N ISSUED
INSP-Final Inspection7/18/19977/21/19977/21/1997ANR
Details
NOT READY YET
INSP - Temporary occupancy7/17/19977/18/19977/18/1997PFAIL
Details
07/17/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Final Inspection7/16/19977/18/19977/18/1997AFAIL
Details
ALARM TESTING, SPRINKLER TESTING, EXITING alarms not complete, list of other items left
INSP-Sprinkler Rough-in/Hydro7/16/19977/16/19977/16/1997APASS
Details
FINISH FLRS B&1, SHELL ONLY 2-P, NEED FDC FOR STANDPIPE FOR FINAL, ALL HYDRO TESTED
INSP-Sprinkler Rough-in/Hydro6/16/19976/16/19976/16/1997PPART
Details
electrical room, marv wants heads moved ok to relo to center under beam
INSP-Sprinkler Rough-in/Hydro5/30/19975/30/19975/30/1997APART
Details
ALLOWED EXTENSIONS TO NW TOWER HOSE CONN AT 2.5 INCH, CHECKED FOR SPACING/ OBSTRUCTIONS. PROBLEMS WITH DECORATIVE SOFFITS NOTED. WILL RECHECK AT HYDRO.
INSP-Conference5/6/19975/8/19975/8/1997APASS
Details
9 am mtg w/ simplex at eidam assoc, 815 park, st 230 on alarm plans G Eidam to revise floor plans, simplex to follow with ness revs to schematic
INSP-Sprinkler Rough-in/Hydro5/7/19975/7/19975/7/1997PPART
Details
basement hydro ( not tied to riser), told stan ok to tie cross connection in on 2nd flr of stairwell ( base of standpipe)
INSP-Sprinkler Rough-in/Hydro4/30/19974/30/19974/30/1997PPART
Details
clarified correction notice on alarm system w/ st lukes staff ( ron & D Maloney), walked through sprinkler issues w/ shilo & st lukes, will resubmit proposed changes to fdc/piv locations. Want to appeal sprinkling under drive under canopy. want to route dry standpipe on 2nd floor.
INSP-Conference4/11/19974/10/19974/10/1997PPART
Details
PICKED UP PLANS AND REVIEWED, STILL MISSING FLOOR PLANS AND PRODUCT DATA SHEETS TO COMPLETE REVIEW
INSP-Conference4/10/19974/10/19974/10/1997ANR
Details
meeting at simplex office to review alarm plan correction list - T. Kyle PLANS NOT READY AT SCHEDULED TIME OF 11 AM,
INSP-Conference3/27/19973/31/19973/31/1997PPASS
Details
alarm plan review, return to ron w/ correction list, 2 pgs, resubmittal required
INSP-Conference3/27/19973/26/19973/26/1997PPART
Details
meeting w/ maurer, ron, and maloney on exiting issues and phased const.
INSP - Wall cover3/25/19973/26/19973/25/1997APASS
Details
03/26/97 333 - INTERIOR WALLS FRAM-OK FRAMING
INSP - Wall cover2/25/19972/26/19972/25/1997APASS
Details
02/26/97 333 - EXTERIOR WALLS PENTHOUSE LEVEL ok
INSP - Wall cover2/13/19972/14/19972/14/1997APART
Details
02/14/97 333 - partial frame
Issue PAID IN FULL permit  11/6/1996
Telephone call  11/5/1996
LEFT MESSAGE FOR JEFF HULL
PLANS/APPL TAKEN TO FRONT DESK  11/4/1996 PASS
Passed with conditions of plan review compliance and letter on file from Jeff Hull of SLRMC.
Print Pending Permit.LaserJet4  11/4/1996 PASS
Routing - PLAN CHECK9/19/1996 11/4/1996 PASS
Have received submittals for plan review concerns and am processing plans for a permit.
Inspection Record Card- Bld  11/4/1996
Print Occupancy Form  11/4/1996
Plan Received by (DRS)7/15/1996 11/4/1996 PASS
DetailsDan Stuart
11/04/96 16:02:36 DRS - this action updated by action script from <<>> in Case No. BLD96-1321
Telephone call  11/1/1996
Told Russ Phillips that I needed a letter from Jeff Hull, St. Lukes RMC stating that as the Architect of Record he would make sure that requirements of the plan review would be completed even if they had to change somthing they had already completed. A copy of the letter is included on the plans.
Telephone call  10/30/1996
Russ Phillips called and asked if it would be possible to issue the permit prior to reveiving full size sheets for the corrections as originally agreed. Olsen & Assoc. will send someone down to install the 8-1/2 x 11 sheets into both sets of plans if we can issue. I told Russ to send them over & I would review the plans for ability to follow after the small sheets had benn inserted by their employee. An employee spent two days 10/24/96 & 10/25/96 installing copies.
Plan Reviewer's activity  10/30/1996
Started to review the plan with inserts installed. I found that some of the copies were not legible and were on the wrong sheets. I have removed several of the inserts and red lined the plans to help clarify areas needing corrected. 11/04/96 - completed the rework of plans for permit processing. I have attached copies of my plan review comments & architect rsponse to both sets of plans.
Plan resubmittals received  10/18/1996
RECEIVED RESPONSE THAT ANSWERED CONCERNS. SENT FAX AND HARD COPY TO RUSS PHILLIPS AT OLSEN & ASSOC. STATING THAT AS SOON AS FULL SIZE DRAWINGS ARE RECEIVED FOR PLANS AS ORIGINALLY AGREED I WOULD INSTALL THEM IN THE PLANS AND PREPARE FOR PERMIT ISSUANCE.
Meeting  10/11/1996
Met with Russ Phillips to review areas still in question. Russ will resubmitt ASAP.
Meeting  10/2/1996
Meeting at my office with Russ Phillips, Architect, to review comments from preliminary plan review still needing clarification as noted on 09/30/96 letter to Mr. Phillips.
Plan resubmittals requested  9/30/1996
RESUBMITTALS OF 9/11/96 INCOMPLETE. REQUESTED MORE CLARIFICATION.
Plan Reviewer's activity  9/23/1996
Started to review the resubmittals for the MSTI project.
Plan resubmittals received  9/11/1996
Recieved plan resubmittals for MSTI basement & 1st floor project. 8-1/2 x 11 inch sheets sent for review. When details are approved as correct Russ Phillips will then have the details put on the full sized plans and resubmitt a clean set for approval.
Routing - FIRE8/2/1996 8/9/1996 PASS
Routing - BUILDING7/15/1996 8/2/1996
Began plan review. Prepared preliminary plan check comments and faxed and mailed hard copy to Russ Phillips of Olsen & Assoc. Routing plans to Fire Dept. for review.
Plan resubmittals requested  8/1/1996
Faxed copy of preliminary review to Russ Phillips and mailed copy.
Meeting  8/1/1996
Meeting with Russ Phillips & associate to review plan review comments prior to issuing written review and forwarding plans to the fire dept. for review.
Plan Reviewer's Copy of Permit  8/1/1996 PASS
Unassigned to Plan Reviewer5/23/1996 7/15/1996 PASS
07/15/96 13:02:51 DRS - this action updated by action script from <<>> in Case No. BLD96-1321
Routing - MECHANICAL6/11/1996 6/13/1996 PASS
Routing - PLUMBING6/5/1996 6/10/1996 PASS
Routing - PUBLIC WORKS5/29/1996 6/4/1996 PASS
Plan routing begun/TENANTS  5/29/1996
Route to Public Works, Plumbing and Mechanical then back to Plan Check. After Plan Check route to Fire Department.
Plans ACCEPTED BY PLAN CHECK  5/23/1996
Application received  5/23/1996
GAY'S RECEIPT FOR PARTIAL PAY  5/23/1996
Routing - BUILDING6/13/1996   PEND
Routing - BUILDING8/8/1996   PEND