Permit NumberBLD96-01410
StatusFinaled
Name TCI COMMUNICATIONS
Site Address 5800 N MEEKER AVE
Project NameTCI PHASE 5
Customer Number 
ePlanReviewNo
Description
(TCI COMMUNICATIONS) (PHASE 5 - TENANT IMPROVEMENT FINISH/OUTFITTING) Fire sprinklers used for unlimited are of the building. To complete the finish of all tenant areas for a new 151,365 square foot 2 story building. Work is to include door hardware, wall finishes, floor finishes, ceiling finishes, and millwork all per approved drawings and plan check notes on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-279-96 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other9/13/20009/13/20009/13/2000 PASS
Dave Hattrick and I reviewd cable guardrails at this site. 3"oc on guard intermediates on stair and 4"oc on balcony. Three eights cable with tension devices installed on each cable
Permanent occupancy  4/4/1997 PASS
Perm. Occ. Cert. #6827 issued 4-4-97 to TCI Communications; also includes permit #BLD96-1074.
INSP - Final3/31/19974/2/19974/2/1997APASS
DetailsCarl Dependahl
04/02/97 340 - FINAL FOR C/O. OK, CARD TO CONT.
INSP - Conference3/10/19973/10/19973/10/1997 PASS
DetailsCarl Dependahl
/ / 340 - NEED ALL OKS FOR FINAL C/O
INSP - Carpentry2/24/19972/24/19972/24/1997 PASS
DetailsCarl Dependahl
/ / 340 - EGRESS CONTROLLS AT PERSONNEL APPEAR TO MEET CITY STDS
INSP - Conference1/30/19971/30/19971/30/1997 PASS
DetailsCarl Dependahl
/ / 340 - NEE OTHER SIGS FOR C/O
INSP - Final12/3/199612/4/199612/5/1996PPASS
DetailsJoe Tawney
12/04/96 406 - FINAL FOR C/O. OK FOR PERM OCC AND ASSEMBLY PERMIT
INSP - Carpentry11/26/199611/26/199611/26/1996 PASS
DetailsCarl Dependahl
/ / 340 - W/MEL S. CHK ATRIUM & THEATER FOR FINISH REQ'S, KEEP C/N
INSP - Conference11/22/199611/22/199611/22/1996PPASS
DetailsCarl Dependahl
11/22/96 340 - PROGRESS FOR FINAL AT THEATRE & ATRIUM
INSP - Carpentry11/19/199611/19/199611/19/1996 PASS
DetailsCarl Dependahl
/ / 340 - CHK PROGRESS FOR ATRIUM, REC'D ARCH'S RESPONSE TO C/N. SMOKE
INSP - Carpentry11/7/199611/7/199611/7/1996 PASS
DetailsCarl Dependahl
/ / 340 - OBSERVED EMER GENERATOR AND ALARM TESTING W/ JOE TAWNEY
INSP - Set-back11/6/199611/6/199611/6/1996 PASS
DetailsCarl Dependahl
/ / 340 - FINISH REQ'S FOR OCCUPANCY; CONSULT W/ G.S.
INSP - Temporary occupancy  11/6/1996 PASS
Temp. Occ. Cert. #3308 issued 11-6-96 to TCI Communications.
INSP - Temporary occupancy11/5/199611/5/199611/5/1996 PASS
DetailsCarl Dependahl
/ / 340 - VANILLA FINISH W/ BLD96-1074; PARTIAL, ATRIUM, THEATER, & KI NOR APPROVED FOR OCCUPANCY, C/N ISSUED. OK FOR T/O PER G.S. CARD TO CONT
INSP - Final11/4/199611/4/199611/4/1996 FAIL
DetailsCarl Dependahl
/ / 340 - VANILLA FINISH W/ BLD96-1074; C/N. SEE NOTE W/ THAT INSP. 11
INSP - Conference10/31/199610/31/199610/31/1996 PASS
DetailsCarl Dependahl
/ / 340 - W/BOB G RE FINAL AT TCI
INSP - Conference10/24/199610/24/199610/24/1996 PASS
DetailsCarl Dependahl
/ / 340 - DISCUSSED FINISH REQ'S W/ LAVAR, ASS'T SUPT.
INSP - Conference9/30/19969/30/19969/30/1996 PASS
DetailsCarl Dependahl
/ / 340 - CHK PLAN FOR FINISH
INSP - Conference9/24/19969/24/19969/24/1996 PART
DetailsCarl Dependahl
/ / 340 - DISCUSSED SIGNAGE AND FINISH WORK; SOME WIP...ACCESS FLOOR S
INSP - Conference9/18/19969/18/19969/18/1996 PASS
DetailsCarl Dependahl
/ / 340 - W/ STEVE DUREN PROJECT MGR. FOR CONST. ASSOC. RE: PLAN RESUB POSSIBLE CORRIDOR MODIFICATION DUE TO C/N.
INSP - Conference9/17/19969/17/19969/17/1996 PASS
DetailsCarl Dependahl
/ / 340 - SEE NOTE W/ BLD96-1074 THIS DATE
INSP - Carpentry9/13/19969/13/19969/13/1996 FAIL
DetailsCarl Dependahl
/ / 340 - CHK'D BEAMS AT SHAFTS & CORR...NEED FIRESTOPPING & ENCLOSURE 7 & 10 FOR 1HR
INSP - Conference9/12/19969/12/19969/12/1996 PASS
DetailsCarl Dependahl
/ / 340 - DISCUSSED CORR PENETRATIONS & SHAFTS W/ CARL W...KEEP C/N
INSP - Framing/Rough-in9/11/19969/11/19969/11/1996 FAIL
DetailsCarl Dependahl
/ / 340 - CN, NEED ARCH'S DETAIL RE SHAFTS & CORR'S
INSP - Conference9/5/19969/5/19969/5/1996 PASS
DetailsCarl Dependahl
/ / 340 - SPOKE W/ 3M TECH. ENG...WILL FAX FURTHER DATA FOR FIREMASTER
INSP - Conference9/4/19969/4/19969/4/1996 PASS
DetailsCarl Dependahl
/ / 340 - W/ BLD96-1074
INSP - Conference9/4/19969/4/19969/4/1996 PASS
DetailsCarl Dependahl
/ / 340 - W/ BLD96-1074
INSP - Conference9/3/19969/3/19969/3/1996 PASS
DetailsCarl Dependahl
/ / 340 - W/ BOB G...RE: DUCT INSUL SYSTEMS: PABCO & FIREMASTER (resub substitution)
90 day tracking............. 6/4/19969/2/1996
INSP - Conference8/29/19968/29/19968/29/1996 PASS
DetailsCarl Dependahl
/ / 340 - rec'd resub. for doors and deletion of sidelights at corr's. at comp room, ok to reverse as occ load< 25
Issue PAID IN FULL permit  7/22/1996
ISSUE OCCUPANCY FORM  7/10/1996
Inspection Record Card- Bld  7/10/1996
Permit taken to Permit Desk  7/9/1996 PASS
Routing - FIRE7/9/1996 7/9/1996 PASS
Plan Received by (CJW)6/24/1996 7/9/1996 PASS
DetailsCarl Westfall
07/09/96 16:46:42 CJW - this action updated by action script from <<>> in Case No. BLD96-1410
Plan Reviewer's Copy of Permit  7/8/1996
Routing - BUILDING6/14/1996 7/8/1996 PASS
The drawings were approved on July 8, 1996. Sheets that did not pertain to package #5 were discarded. These included Electrical, Mechanical, Plumbing, Structural, Civil, Landscape, Acoustical, and Security. These drawings were included in previously approved packages and had no relevance to this package.
Plan Reviewer's Copy of Permit  7/8/1996
Telephone call7/8/1996 7/8/1996
Called Kurt Teske and discussed locking hardware.
Routing - PUBLIC WORKS6/13/1996 6/20/1996 PASS
Routing Off Site - C.D.H6/6/1996 6/13/1996 PASS
Plan routing begun/TENANTS  6/5/1996
Route plans to Central District Health and Public Works then back to Plan Check. After Plan Check route to Mechanical and Fire Department.
Plans taken to Plan Check  6/4/1996
GAY'S RECEIPT FOR PARTIAL PAY  6/4/1996
Plans ACCEPTED BY PLAN CHECK  6/4/1996
Plans logged in to the Plan Check Department.
Application received  6/4/1996
Routing - BUILDING7/9/1996   PEND
Unassigned to Plan Reviewer6/4/1996