Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD96-01484
StatusFinaled
Name MORRISON KNUDSEN CORP
Site Address 400 S BROADWAY AVE
Project NameMK-PLAZA I
Customer Number 
ePlanReviewNo
Description
(MORRISON KNUDSEN CORPORATION) This building is partially fire sprinkled. To remodel the basement (29,200 square feet) and all 6 stories (130,150 square feet) of an existing building. Work is to include stair enclosure corridors on the first floor, interior walls, doors, suspended ceilings, wall coverings, and mill work all per approved drawings and plan check notes on file. Selective demolition of interior nonstructural walls is included in this permit. This permit does NOT cover the compliance upgrade to the atrium. The fire sprinkler system in the basement shall comply with NFPA 13 as regulated by the Fire Department. PC-290-96 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes3/12/1999 3/12/1999
Permanent occupancy  10/16/1998 PASS
Perm. Occ. Cert. #7460 issued 10-16-98 to Morrison-Knudsen.
Permanent Occupancy 8/25/19988/25/1998 DONE
Details
Temporary occupancy  5/15/1997 PASS
Temp. Occ. Cert. #3408 issued 5-15-97 to Morrison Kundsen Co.
INSP - Final5/14/19975/14/19975/14/1997PPART
DetailsJim Storey
05/14/97 301 - TENP OCC. OK CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Final5/12/19975/13/19975/13/1997ANR
DetailsJim Storey
05/13/97 301 - OTH-OTHER AGENCIES NOT APPROVED
INSP-Final Inspection5/13/19975/13/19975/13/1997PPART
Details
mk plaza 1 floors basement through 6th basement missing doors in corridor, some on other floors but corridor is not rated above basement, still need smoke evac sys
INSP - Framing/Rough-in2/5/19972/5/19972/5/1997PNR
DetailsJim Storey
02/05/97 301 - CALL JOHN MATHEWS - ###-#### SO HE CAN MEET YOU. NWP -GENERAL INSPECTION - NO WORK IN PROGRESS conf.
INSP-Conference1/14/19971/14/19971/14/1997APASS
Details
met at site to review elevator and stairway signage w/ Bill Cramer ###-####
INSP - Wall cover12/31/199612/31/199612/31/1996PPASS
DetailsWes Worcester
INSP - Carpentry12/27/199612/27/199612/27/1996 NR
DetailsCarl Dependahl
/ / 340 - EXIT PASSAGE ,342 AREA NR...NEED PLAN
INSP - Framing/Rough-in12/24/199612/27/199612/27/1996ACANC
DetailsAlan Hauser
12/27/96 350 - contact john mathews cel ###-#### wes had called it carpe framing inspection. TO BE DONE BY #340
INSP - Carpentry12/27/199612/27/199612/27/1996 PART
DetailsCarl Dependahl
/ / 340 - LID ASSEMBLY AT ENCLOSURE EXT. OK TO ROCK UNDERSIDE.
INSP - Foundation12/19/199612/19/199612/19/1996PPASS
DetailsWes Worcester
rebar ok
INSP - Masonry12/19/199612/19/199612/19/1996APASS
DetailsWes Worcester
INSP - Conference12/17/199612/18/199612/18/1996PPASS
DetailsWes Worcester
CALL JOHN 1:30 PM.
INSP - Masonry12/18/199612/18/199612/18/1996PPASS
DetailsWes Worcester
no. wall ok
INSP - Foundation12/18/199612/18/199612/18/1996PPASS
DetailsWes Worcester
epoxy set rebar ok
INSP - Conference12/17/199612/17/199612/17/1996PPART
DetailsWes Worcester
talked to John Matthews about scheduling insp
INSP - Conference12/16/199612/17/199612/17/1996ANH
DetailsWes Worcester
HE WILL CALL YOU TO SCHEDULE A TIME WITH YOU no infp at numbers given....talked to Tom and he was to relay..
INSP - Conference12/16/199612/16/199612/16/1996PPASS
Details
12/16/96 333 - wall ok
INSP - Conference12/9/199612/9/199612/9/1996PPASS
DetailsWes Worcester
making another copy so we can put one in plan vault, draft stopping above 2 hr tunnel with mineral wool
INSP - Conference11/26/199611/27/199611/27/1996PPASS
DetailsWes Worcester
6TH FLOOR
testing condition printout  11/14/1996
INSP - Conference11/12/199611/13/199611/13/1996APASS
DetailsWes Worcester
11 A.M.
Plan Reviewer's activity  11/6/1996 PASS
Resubmittal was received November 4, 1996 and was reviewed and approved on November 6, 1996. See condition #57.
INSP - Carpentry10/29/199610/29/199610/29/1996 FAIL
DetailsWes Worcester
/ / 342 - c/n for i hr walls and ceiling construction
INSP - Conference10/25/199610/25/199610/29/1996PFAIL
DetailsWes Worcester
10/29/96 342 - JOHN MATHEWS CELL ####-#### 1:30 APPOINTMENT
90 day tracking............. 6/10/19969/8/1996
Issue PAID IN FULL permit  8/5/1996
Plan Received by (CJW)7/10/1996 8/2/1996 PASS
DetailsCarl Westfall
08/02/96 13:31:58 CJW - this action updated by action script from <<>> in Case No. BLD96-1484
Permit taken to Permit Desk  8/2/1996 PASS
ISSUE OCCUPANCY FORM  8/2/1996
Plan Reviewer's Copy of Permit  8/2/1996
Plan Reviewer's Copy of Permit  8/2/1996
Inspection Record Card- Bld  8/2/1996
Routing - BUILDING7/19/1996 8/2/1996 PASS
Meeting  8/1/1996 PASS
Had a meeting with Tom Andrews, Dick Robertson, Rick Carr, Dan Pritchard, Tim Hogland, Carl Westfall and Don Keirn where the Atrium upgrade proposal was accepted as well as the existing corridor construction.
Plan resubmittals received8/2/1996 7/26/1996 PASS
Routing - FIRE7/16/1996 7/19/1996 PASS
Routing - BUILDING7/10/1996 7/16/1996 FAIL
Need response from Architect.
Plan resubmittals requested7/12/1996 7/16/1996
Sent report to the Architect. Waiting for his response.
Telephone call7/18/1996 7/16/1996
Talked to Tom Andrews. He requested a modification to items 4, 11, and 12. I told him I would modify these items and mail him a new copy.
Meeting  7/15/1996
Meeting with Tom Andrews and company to discuss the atrium upgrade and other issues.
Telephone call7/12/1996 7/11/1996
Talked to Dan Prichard. Meeting scheduled for Monday July 15 @ 2:00 PM.
Plan Reviewer's activity  6/21/1996
Per T. Hogland's request plans were sent to Carl Mileff & Associates in Fresno, California for a plan review analysis on this date. On file is a copy of a letter of transmittal which accompanied plans stating what other documentation was shipped.
Plan routing begun/TENANTS  6/12/1996
This plan to be reviewed by Plan Check and Fire Department only.
Application received  6/10/1996
Plans taken to Plan Check  6/10/1996 PEND
Plans ACCEPTED BY PLAN CHECK  6/10/1996
GAY'S RECEIPT FOR PARTIAL PAY  6/10/1996
Unassigned to Plan Reviewer6/10/1996  
Routing - BUILDING7/19/1996   PEND