Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD96-01628
StatusFinaled
Name BOISE VALLEY CHRISTIAN
Site Address 4215 W IRVING ST
Project NameCHURCH
Customer Number 
ePlanReviewNo
Description
THE WORK FOR THIS PROJECT SHALL CONSIST OF THE CONSTRUCTION OF A 5386 SQ FT. TYPE V-1HR CHURCH ADDITION WITH BASEMENT AND EIFS EXTERIOR FINISH; WORK INCLUDES INTERIOR AND EXTERIOR BUILDING REMODELING; VARIOUS SITE IMPROVEMENTS, AND NEW PARKING LOT AS PER ENGINEER APPROVED PLANS. ALL WORK IS PER APPROVED PLANS AND ATTACHMENTS, 1994 UBC, PC#314-96, CU#33-95 WITH REVISION CU#33-95V. FIRE SPRINKLERS ARE BEING INSTALLED THROUGHOUT AND WILL BE USED FOR ONE HOUR SUBSTITUTION PER UBC SEC 508.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/15/2002  
Permanent Occupancy 1/16/19981/16/1998 DONE
Details
INSP - Final1/15/19981/16/19981/16/1998APASS
Details
01/16/98 338 - ###-#### DELORES FNL -OK FINAL signed the occ req perm col
Permanent occupancy  1/16/1998 PASS
Perm. Occ. Cert. #7107 issued 1-16-98 to Boise Valley Christian Church (addn.)
INSP-Final Inspection1/14/19981/15/19981/15/1998APASS
DetailsJoe Tawney
01/15/98 406 - ###-#### Linda ###-#### Dolores REINSP OK FOR PERM OCC
INSP-Final Inspection12/18/199712/18/199712/19/1997PFAIL
DetailsJoe Tawney
12/18/97 406 - REINSP FOR FINAL FAIL SUPR SIGNAL EMERG LIGHTS PAINT CUR
INSP - Temporary occupancy12/5/199712/5/199712/8/1997PPART
Details
12/05/97 338 - CHURCH ok for temp occ entire building perm to be ready o (wednsday
Routing for occupancy11/25/1997 11/19/1997 PASS
Approved by: Scott M. Brown (CU-33-95/V).
Print Occupancy Form  11/19/1997
Temporary occupancy  11/19/1997 PASS
Temp. Occ. Cert. #3506 issued 11-19-97 to Boise Valley Christian Communion Church for the main level only.
INSP - Final11/14/199711/17/199711/17/1997APART
Details
partial\\temp occ for the upper level only per Joe T. the fire guy
INSP - Final11/14/199711/14/199711/14/1997PPART
Details
MADE OK FOR THE UPPER LEVEL ONLY PER JOE TAWNEY REQ
INSP-Final Inspection11/14/199711/14/199711/14/1997PPART
DetailsJoe Tawney
11/14/97 406 - partial OK FOR TEMP OCC OF 2ND FLOOR ONLY
INSP-Final Inspection11/12/199711/13/199711/13/1997PFAIL
DetailsJoe Tawney
11/13/97 406 - TEMP OCC. EARLY PM REINSP FOR FINAL 2ND FLR FAIL ALARM SYST & EMERG LIGHTING
INSP - Temporary occupancy11/12/199711/13/199711/12/1997PPASS
Details
made ok signed the occ req card
INSP-Sprinkler Rough-in/Hydro11/10/199711/12/199711/12/1997APART
DetailsJoe Tawney
11/12/97 406 - OK ON HYDRO TESTS FOR WET AND DRY SYSTEMS
INSP-Final Inspection11/10/199711/12/199711/12/1997AFAIL
DetailsJoe Tawney
11/12/97 406 - FINAL ON UPPER FLOOR FAIL ALARM SYSTEMS AND S/F DAMPERS &
INSP - Temporary occupancy11/10/199711/12/199711/12/1997PCANC
Details
cancelled by the ctr.
INSP - Temporary occupancy11/10/199711/10/199711/10/1997PCANC
DetailsTom Arcoraci
INSP-Final Inspection11/7/199711/10/199711/10/1997ANR
DetailsJoe Tawney
11/10/97 406 - 1 ST FLOOR FINAL ON 1ST FLOOR NOT READY
INSP - Temporary occupancy11/7/199711/7/199711/7/1997PCANC
Details
AS LATE AS POSSIBLE/ FOR TOP FLOOR per contractor, he called kim
INSP - Framing/Rough-in10/21/199710/21/199710/21/1997PPASS
Details
MADE OKiling
INSP - Framing/Rough-in10/10/199710/10/199710/10/1997PNR
Details
10/10/97 338 - out of time
INSP - Framing/Rough-in8/29/19978/29/19978/29/1997PPART
Details
08/29/97 338 - RE-INSPECTION OK TO FILL CONCEALED AREAS WITH INSULATION SPRINKLE
INSP - Framing/Rough-in8/28/19978/28/19978/28/1997PNH
Details
/ / 338 - NO ONE ON SITE DONE BY 301
INSP-Conference8/26/19978/27/19978/27/1997PPASS
DetailsJoe Tawney
08/27/97 406 - CONF ON SPKLR COVERAGE & HANDRAILS IN BAPTISMAL FONT
INSP - Framing/Rough-in8/14/19978/15/19978/15/1997APART
Details
08/15/97 338 - FIRE WALL CEILING ok first layer
INSP-Sprinkler Rough-in/Hydro8/13/19978/14/19978/15/1997ACANC
DetailsJoe Tawney
08/14/97 406 - first layer of fire ceiling INSPECTION SHOULD BE FOR STRUCTURAL
INSP - Resubmittals8/5/19978/5/19978/5/1997 PASS
Details
/ / 338 - approved doon ceiling assy
INSP - Conference8/4/19978/5/19978/5/1997APASS
Details
08/05/97 338 - fire caulking and ceiling system
INSP - Foundation7/30/19977/31/19977/31/1997APASS
Details
07/31/97 338 - foundation wall inspectionmade ok with sp insp approval
INSP - Foundation7/29/19977/29/19977/29/1997PPASS
Details
07/29/97 338 - made ok with sp insp
INSP - Framing/Rough-in7/24/19977/25/19977/25/1997APASS
Details
07/25/97 338 - the pulpit and platform area conf with sub ctr about req the insp.
INSP - Conference7/25/19977/25/19977/25/1997 PASS
Details
/ / 338 - podium questions made them fill solid with insulation or spr
INSP - Footings7/23/19977/24/19977/24/1997PPASS
Details
07/24/97 338 - CONCRETE COL. ì
INSP - Foundation7/22/19977/22/19977/22/1997PPART
DetailsTom Arcoraci
07/22/97 408 - special inspector on site report pending
INSP - Framing/Rough-in7/18/19977/18/19977/17/1997PPART
Details
07/18/97 338 -
INSP-Sprinkler Rough-in/Hydro7/16/19977/17/19977/17/1997APART
DetailsJoe Tawney
07/16/97 406 - UNDERGROUND FLUSH OK SPKLR ROUGH IN OK TO COVER EXCEPT IN JOIST AREAS.
INSP - Wall cover7/11/19977/14/19977/14/1997APASS
Details
07/14/97 338 - concrete walls this is to pour and backfill retaining wal ramps and stairs
INSP - Foundation7/9/19977/9/19977/9/1997PPASS
Details
07/10/97 338 - FOUNDATION WALL RE-FORCEMENT MASN-REBAR OK
INSP - Footings7/8/19977/8/19977/8/1997PPASS
Details
07/08/97 338 - FTG -OK FOOTING MASN-REBAR OK
INSP-Sprinkler Rough-in/Hydro6/23/19976/24/19976/24/1997APART
DetailsJoe Tawney
CARMEN POLING - ###-#### ROUGH IN ON WET SYSTEM OK TO COVER
INSP - Foundation6/11/19976/12/19976/12/1997APASS
Details
06/12/97 338 - FND. WALL made ok with sp insp approval
INSP - Foundation6/4/19976/5/19976/5/1997APASS
Details
06/05/97 338 - made ok with sp insp approval
INSP - Conference6/4/19976/5/19976/5/1997PNR
Details
06/05/97 338 - no call from super to set appmt time will reschedule for
INSP-Conference6/4/19976/5/19976/5/1997APASS
DetailsJoe Tawney
06/05/97 406 - DISCUSSED EXIT SIGN LOCATION AND TOLD CONTRACTOR THAT ALA MAKE SUBMITTAL ON SYSTEM
INSP - Framing/ Rough-in6/3/19976/3/19976/3/1997 PASS
Details
/ / 338 - floor framing
INSP - Framing/Rough-in6/3/19976/3/19976/3/1997PCANC
Details
06/03/97 338 - postponed til 06-04-97
INSP - Conference6/3/19976/3/19976/3/1997 PASS
Details
/ / 338 - conf with plan review on the ele vator shaft
INSP - Conference5/16/19975/16/19975/16/1997 PASS
Details
/ / 338 - met with arch on the fire rated construction etc
INSP - Framing/Rough-in5/15/19975/16/19975/16/1997ANR
Details
05/16/97 338 - misc rated wall questions only
INSP - Footings5/16/19975/16/19975/16/1997PPASS
Details
05/16/97 338 - made ok r-bar placed sp insp made ok
INSP - Conference5/15/19975/15/19975/15/1997 PASS
Details
/ / 338 - with Wayne thallus on rated doors said planreview ok,d dors jambs per1949 code ???
INSP - Carpentry5/14/19975/15/19975/15/1997APASS
Details
05/15/97 338 - misc framing questions
INSP - Foundation5/14/19975/14/19975/13/1997PFAIL
Details
05/14/97 338 - r-bar placed sp insp on site pouring grout sand/cement m required
INSP - Conference4/18/19974/18/19974/18/1997PPASS
Details
04/18/97 338 -
INSP - Foundation4/17/19974/17/19974/17/1997PPASS
Details
04/17/97 338 - REBAR FOR RETAINING WALL FDN -OK FOUNDATION
INSP - Footings4/14/19974/14/19974/14/1997PPASS
Details
04/14/97 338 - REBAR FOR A RAMP MADE OK
INSP - Flatwork3/20/19973/20/19973/19/1997PPASS
Details
03/20/97 338 - SLAB -- WIRE MESH insp not required
INSP - Footings3/17/19973/18/19973/17/1997APASS
Details
03/18/97 338 - MADE OK WITH SP INSP APPROVAL
INSP - Footings3/13/19973/14/19973/12/1997ANR
Details
03/14/97 338 - LATE A.M.
INSP - Foundation3/6/19973/7/19973/5/1997APASS
Details
03/07/97 338 - arch will confirm the verbal corrections ok t5o pour with
INSP - Footings2/24/19972/25/19972/25/1997APASS
Details
02/25/97 338 - r-bar placed FTG -OK FOOTING
INSP - Footings2/24/19972/24/19972/24/1997PNR
Details
02/24/97 338 -
Print Occupancy Form  2/4/1997
(F) Reprint permit  2/4/1997
INSP - Foundation1/30/19971/30/19971/29/1997PPASS
Details
01/30/97 338 - to recieve letter from the arch on plaacement of reinforc penetrations
INSP - Foundation1/21/19971/21/19971/20/1997PPASS
Details
01/21/97 338 - ARCH INSP MADE OK
INSP - Footings1/15/19971/15/19971/15/1997PPASS
Details
01/15/97 338 - EARLY PM made ook weather pro and r-bar placxede also ins
INSP - Foundation1/13/19971/14/19971/14/1997APASS
Details
01/14/97 338 - WEARHR PRO AND R-BAR ARE IN PLACE
INSP - Footings1/10/19971/13/19971/13/1997ANR
Details
01/13/97 338 - footing rebar NOT READY
INSP - Footings1/13/19971/13/19971/13/1997 PASS
Details
/ / 338 - FTG -OK FOOTING
INSP - Foundation1/8/19971/9/19971/9/1997ANR
Details
01/08/97 338 - not ready cancell till tomorrow by the contractor he must
90 day tracking............. 6/21/19969/19/1996
Issue PAID IN FULL permit  8/28/1996
Inspection Record Card- Bld  8/21/1996
Print Occupancy Form  8/21/1996
Plan Received by (M_O)7/15/1996 8/20/1996 PASS
Plan resubmittals received  8/20/1996 PEND
Plan Reviewer's Copy of Permit  8/20/1996
Permit taken to Permit Desk  8/20/1996 PASS
Routing - PUBLIC WORKS8/19/1996 8/20/1996 PASA
Routing - FIRE7/26/1996 7/30/1996 PASS
Plan resubmittals requested  7/26/1996 PEND
corrections sent and faxed to Leatham and Krohn Architects.d
Meeting  7/19/1996 PEND
Had meeting with architect regarding handicapped accessibility.
Unassigned to Plan Reviewer6/21/1996 7/15/1996 PEND
Routing - PLUMBING7/11/1996 7/13/1996 PASS
Routing - ELECTRICAL7/12/1996 7/12/1996 PASS
FIELD VERIFY
Routing - MECHANICAL7/9/1996 7/10/1996 PASS
Routing - PLANNING7/5/1996 7/9/1996 PASS
X-ref: CU-33-95/V. Approved by SR.
Routing Off Site - A.C.H.D7/1/1996 7/3/1996 PASS
CONTACTED WAYNE THOWLESS AT ###-#### FOR ACHD PICKUP. 07-03-96 FEES PAID OF $470.00
Routing - PUBLIC WORKS6/25/1996 6/28/1996 FAIL
REQUIRES DRAINAGE PLAN
Plan routing begun/NEW & ADDTN  6/25/1996 PASS
GAY'S RECEIPT FOR PARTIAL PAY  6/21/1996
Plans taken to Plan Check  6/21/1996
Application received  6/21/1996
Received Certificate of Value  6/21/1996 PASS
Routing - BUILDING7/12/1996   PEND
Routing - BUILDING7/31/1996   PEND
Routing - BUILDING8/20/1996   PEND