INSP - Site Preparation | 1/15/1997 | 1/15/1997 | 1/15/1997 | | FAIL |
Wes Worcester
|
|
|
home has been occupied....no letter from public works. Home has not been finaled......
|
INSP - Framing/Rough-in | 9/5/1996 | 9/6/1996 | 9/6/1996 | P | PASS |
Wes Worcester
|
|
|
FRAME REINSPECT
|
INSP - Carpentry | 9/4/1996 | 9/4/1996 | 9/4/1996 | P | FAIL |
Wes Worcester
|
|
|
not nailed as per engineering...depicted and outlined on engineering
|
INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 | P | FAIL |
Wes Worcester
|
|
|
not done as to truss eng and nail straps at 4'splices
|
INSP - Framing/Rough-in | 9/3/1996 | 9/4/1996 | 9/4/1996 | P | NR |
Wes Worcester
|
|
|
SHE MADE APPOINTMENT WITH WES AT 11:30 AM AND INSISTS SHE'S IN WES' AREA. PLEASE CALL WES FIRST.
|
INSP - Framing/Rough-in | 8/29/1996 | 8/30/1996 | 8/30/1996 | P | PASS |
Wes Worcester
|
|
|
FRAME REINSPECTION.
|
INSP - Framing/Rough-in | 8/27/1996 | 8/28/1996 | 8/28/1996 | P | FAIL |
Wes Worcester
|
|
|
truss eng, top plate splices, plans on site
|
INSP - Footings | 7/16/1996 | 7/17/1996 | 7/17/1996 | A | NR |
Wes Worcester
|
|
|
first thing in am.
|
INSP - Footings | 7/17/1996 | 7/17/1996 | 7/17/1996 | A | PART |
Wes Worcester
|
|
|
|
INSP - Conference | 7/17/1996 | 7/17/1996 | 7/17/1996 | A | PART |
Wes Worcester
|
|
|
Talked to general contractor and she wanted me to leave staff meeting. I mentioned that to date they have not been ready on previous 2 inspections and rebar not right
|
INSP - Site Preparation | 7/17/1996 | 7/17/1996 | 7/17/1996 | A | NR |
Wes Worcester
|
|
|
still trying to clean out loose soil and get 3" cover!
|
INSP - Conference | 7/17/1996 | 7/17/1996 | 7/17/1996 | A | PART |
Wes Worcester
|
|
|
talked to concrete sub again about cover and bundled bar and not being ready. I went around and corrected cover and spacing of bar for the last time....
|
INSP - Footings | 7/16/1996 | 7/16/1996 | 7/16/1996 | P | CANC |
Wes Worcester
|
|
|
changed to 7/17/96-am
|
INSP - Foundation | 7/12/1996 | 7/15/1996 | 7/15/1996 | A | PASS |
Jim Sly
|
|
|
RETAINING WALL. OK.
|
INSP - Footings | 7/11/1996 | 7/12/1996 | 7/11/1996 | A | CANC |
|
|
|
07/12/96 338 - to 342
|
Issue PAID IN FULL permit | | | 7/10/1996 | | PAID |
|
|
|
|
Issue PAID IN FULL permit | | | 7/10/1996 | | PAID |
|
|
|
|
Permit taken to Permit Desk | | | 7/9/1996 | | PASS |
|
|
|
ISSUE AS NOTED
|
Plan Reviewer's activity | | | 7/9/1996 | | PASS |
|
|
|
REVIEW PLANS, MARK-UP, PREPARE CORRECTION LIST, INPUT TO PERMIT PLAN, ASSEMBLE PLANS, ISSUE
|
Inspection Record Card- Bld | | | 7/9/1996 | | |
|
|
|
|
ISSUE OCCUPANCY FORM | | | 7/9/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/1996 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/9/1996 | | PASS |
|
|
|
ISSUE
|
Routing - PLANNING | 7/1/1996 | | 7/8/1996 | | PASS |
|
|
|
Approved by RAC.
|
Plans taken to Plan Check | | | 7/8/1996 | | PEND |
|
|
|
|
Application received | | | 7/1/1996 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/28/1996 | | 6/28/1996 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/2/1996 | | 6/3/1996 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Unassigned to Plan Reviewer | | | | | |
|
|
|
|
Routing - FRONT DESK | 7/8/1996 | | | | PEND |
|
|
|
|