Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD96-01963
StatusFinaled
Name ST ALPHONSUS DIVERSIFIED CARE
Site Address 12273 W MCMILLAN RD
Project NameST AL'S
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW, FULLY FIRE SPRINKLERED, 6940 SQ. FT. SINGLE STORY WITH A 1500 SQ. FT. BASEMENT (8440 TOTAL) MINOR EMERGENCY FACILITY. CONSTRUCTION WILL BE TYPE V-N , WOOD FRAME WITH EIFS AND BRICK VEENER EXTERIOR FINISH. OTHER WORK INCLUDES ALL SITE IMPROVEMENTS, LANDSCAPING AND TRASH ENCLOSURE PER APPROVED PLANS, PC#386-96, 1994 UBC, CU-23-95.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/3/2001  
Permanent occupancy  5/8/1997 PASS
Perm. Occ. Cert. #6852 issued 5-8-97 to St. Alphonsus Diversified Care.
INSP - Final5/2/19975/5/19975/5/1997APASS
DetailsJim Sly
05/02/97 316 - OK
INSP - Final5/2/19975/2/19975/2/1997PNH
DetailsJim Sly
05/02/97 316 - Reinspect No one or occup card on site.....
Routing for occupancy4/29/19974/29/19974/29/1997 PASS
Art Yingling inspected for final - complies w/ CU-23-95
INSP - Final3/31/19974/1/19974/1/1997PCANC
DetailsJim Sly
04/01/97 316 - Builder Cancelled
INSP - Final3/31/19973/31/19973/31/1997 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
Temporary occupancy  1/29/1997 PASS
Temp. Occ. Cert. #3354 issued 1-29-97 to St. Al's Diversified Care.
INSP - Final1/27/19971/28/19971/28/1997PPART
DetailsJim Sly
01/28/97 316 - C/N...Repair draftstop, fireblk, weatherstrip crawlspace Temp. Occ.
INSP - Final1/27/19971/28/19971/28/1997APART
DetailsJoe Tawney
OK FOR TEMP OCC EMERG LIGHTS IN BOTH STAIRWELLS RELOCATE FIRE HYD TO ENTRANCE ON MCMILLAN 911 SIGN ON BELL STRIPE AND SIGN CURBS TO MAINTAIN FIRE LANES
INSP-Sprinkler Rough-in/Hydro1/24/19971/27/19971/27/1997APASS
Details
BOB - ###-#### ug hydro, fdc hydro, wet & dry pipe sys hydro. Looks like dry pipe is less than 500 gal so no trip test required. no accelerator either.
INSP-Supply line flush1/21/19971/21/19971/21/1997 PASS
OK ON UNDERGROUND SUPPLY LINE FLUSH
INSP - Ceiling grid1/16/19971/17/19971/17/1997APASS
DetailsJim Sly
01/16/97 316 - OK
INSP-Sprinkler Rough-in/Hydro1/16/19971/16/19971/16/1997 PASS
OK TO COVER ALL SPKLR PIPING
INSP - Temporary occupancy1/13/19971/13/19971/13/1997 PASS
Art Y. insp. for temp. occ - Bonded for Undrgrd Sprklr/landscaping/tsh encl @ $24,596.00
INSP-Sprinkler Rough-in/Hydro12/30/199612/30/199612/30/1996 PASS
DetailsJoe Tawney
/ / 406 - OK TO COVER DRY SYSTEM IN OVERHEAD ROOF AREA
INSP-Sprinkler Rough-in/Hydro12/24/199612/26/199612/26/1996AFAIL
DetailsJoe Tawney
12/26/96 406 - ROUGH IN INSP OF ATTIC DRY SYSTEM FAILED RELOCATE ONE HEAD ADD HEADS AT FIRE STOP UNCOVER OR ADD HEADS AT ROOF HIPS ON EAST & WEST SIDES OF BLDG
INSP-Sprinkler Rough-in/Hydro12/23/199612/24/199612/24/1996ACANC
Details
12/24/96 40Y - INSP CANCELLED TO BE RESCHED FOR 11/26/96
INSP - Framing/Rough-in12/23/199612/23/199612/23/1996 PART
DetailsJim Sly
/ / 316 - Inspection of all chases for fireblock.
INSP - Framing/Rough-in12/19/199612/20/199612/20/1996APART
DetailsJim Sly
12/19/96 316 - Inspection of exterior walls and partition walls for cove inspection of chase fireblocking and drafstop...Part.
INSP - Framing/Rough-in12/17/199612/17/199612/17/1996PNR
DetailsJim Sly
12/17/96 316 - C/N Misc fireblock, truss, and trade rough in insp....
INSP - Conference12/13/199612/13/199612/13/1996 PART
DetailsJim Sly
/ / 316 - Review truss engineering.
INSP - Carpentry12/9/199612/10/199612/10/1996APART
DetailsJim Sly
12/09/96 316 - WALL COVER IN BASEMENT...OK to insulate.
INSP - Conference12/9/199612/9/199612/9/1996 PART
DetailsJim Sly
/ / 316 - Partial frame insp for basment....walk thru main floor.
INSP - Wall cover12/2/199612/2/199612/2/1996 PASS
DetailsJim Sly
/ / 316 - Roof Nailing ...Sheathing OK.
INSP - Footings10/23/199610/24/199610/24/1996APASS
DetailsJim Sly
10/23/96 316 - Interior Footings...OK.
90 day tracking............. 7/25/199610/23/1996
INSP - Footings10/18/199610/21/199610/21/1996APASS
DetailsJim Sly
10/18/96 316 - Footings OK pending special insp OK.
INSP - Foundation10/9/199610/10/199610/10/1996APASS
DetailsJim Sly
10/09/96 316 - BASEMENT Foundation OK pending special inspection OK.
INSP - Footings10/8/199610/8/199610/8/1996 PASS
DetailsJim Sly
/ / 316 - OK...Pending special inspection OK.
INSP - Footings10/7/199610/7/199610/7/1996PPASS
DetailsJim Sly
Footings OK pending approval Special Inspection.
INSP - Site Preparation10/3/199610/3/199610/3/1996PPASS
DetailsJim Sly
10/03/96 316 - OK pending special inspector soil reports.
(F) Reprint permit  10/1/1996
Issue PAID IN FULL permit  9/30/1996
Print Occupancy Form  9/27/1996
Inspection Record Card- Bld  9/27/1996
Received Certificate of Value  9/27/1996 PASS
RECEIVED FINAL CERTIFICATE OF VALUE FORM RUSSELL CORP. 9-27-96-MO.
Print Pending Permit.LaserJet4  9/27/1996
PLANS/APPL TAKEN TO FRONT DESK  9/27/1996 PASS
PLANS GIVEN TO DAR FOR FORWARDING TO FRONT DESK 9-27-96 - MO.
Plan Received by (M_O)8/22/1996 9/27/1996 PASS
plans received for review 8-22-96 MO Plans submitted are only partially prepared by an Idaho Lic. Architect. Call made to Cricket at BRS 8-22-96. MO Plan corrections mailed and faxed to architect 8-28-96MO. Three items on correction list failed, reponse faxed and mailed to architect 9-12-96 MO. 9-19-96 Three outstanding items have been taken care of. Plans have been forwarded to Fire for final review. Still need Public Works and ACHD sign offs on packages # 2 and 4 as of this date. MO.
Routing Off Site - A.C.H.D7/26/1996 9/26/1996 PASS
PACKAGE #4 CONTACTED CRICKET LANGWORTHY AT ###-#### FOR ACHD PICKUP
Routing - PUBLIC WORKS9/17/1996 9/25/1996 PASS
Routing - FIRE9/19/1996 9/23/1996 PASS
Routing Off Site - STRUCTURAL8/2/1996 9/16/1996 PASS
PACKAGE #3 RESUBMITTALS REQUIRED.
Plan resubmittals received  9/12/1996 FAIL
plan resubmittals for package #1 & 3 received. Pkg. #3 sent to Keith Jones for structral review. MO
Routing - FIRE8/28/1996 8/28/1996 FAIL
PACKAGE #1
Unassigned to Plan Reviewer7/25/1996 8/22/1996 PASS
plans received for review 8-22-96 MO
INSP - Miscellaneous  8/22/1996 FAIL
letter sent to B. Strite regarding unstamped plans submitted for review. 8-22-96MO
Routing - ELECTRICAL8/14/1996 8/19/1996 PASS
Routing - PUBLIC WORKS8/8/1996 8/14/1996 FAIL
PACKAGE #2 TO MIKE OTTO 8/14/96. DAR
Routing - ELECTRICAL8/9/1996 8/13/1996 FAIL
PACKAGE #1 1) ONE LINE MUST MEET CURRENT N.E.C. 2) GROUNDING DETAIL 3) LOCATION OF MAIN (S)
Routing - PLANNING8/8/1996 8/7/1996 PASS
X-ref: CU-176-91, CU-23-95, DR referral. Approved by MS & SR.
Routing - MECHANICAL8/1/1996 8/5/1996 PASS
PACKAGE #1
Plan resubmittals received  8/2/1996 PASS
Routing - PLUMBING7/30/1996 8/1/1996 PASS
PACKAGE #1
Routing - PLANNING7/26/1996 7/31/1996 FAIL
PACKAGE #2 Plans have not been revised to comply with conditions of DR referral. X-ref: CU-176-91, CU-23-95, DR referral. Reviewed by MS.
Routing - ELECTRICAL7/26/1996 7/29/1996 FAIL
PACKAGE #1
Received Certificate of Value7/26/1996 7/26/1996 PASS
Plan routing begun/NEW & ADDTN  7/26/1996 PASS
Application received  7/25/1996
Plans taken to Plan Check  7/25/1996
GAY'S RECEIPT FOR PARTIAL PAY  7/25/1996
Routing - PLAN CHECK8/28/1996   FAIL
Routing - PLAN CHECK9/25/1996   PEND
PACKAGE #2 TO PLAN CHECKER MIKE OTTO. 9/25/96 DAR
Routing - PLAN CHECK9/26/1996   PEND
PACKAGE #4 TO MIKE OTTO. DAR 9/26/96
Routing - PLAN CHECK9/23/1996   PEND
Routing - BUILDING8/5/1996   PEND
PACKAGE #1
Routing - BUILDING7/26/1996   PEND
PACKAGE #3 ENGINEERS PACKAGE PUT BEHIND BOB'S DESK. KMM package #3 SENT OUT TO ATWOOD, HINZMAN AND JONES FOR ENGINEERING 8-2-96 KMM.
Routing - BUILDING8/13/1996   PEND
Routing - BUILDING8/19/1996   PEND
Routing - BUILDING8/19/1996   PEND