Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD96-01988
StatusFinaled
Name TOVE NELSON
Site Address 2029 E FELDSPAR CT
Project Name 
Customer Number 
ePlanReviewNo
Description
TO BUILD A NEW 3864 S.F. SINGLE STORY/FULL BASEMENT (1940 MAIN) (1924 BASEMENT) AND A 818 S.F. 3-CAR ATTACHED GARAGE PER THE APPROVED PLANS AND THE ATTACHED CONDITIONS SOLAR SETBACK REQ HVE BEEN WAIVED BY PUBLIC WORKS. ACHD # 96-0526 PR # 656 338
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final7/29/19977/30/19977/30/1997PPASS
DetailsWes Worcester
07/30/97 342 - late p.m.
INSP - Framing/Rough-in1/30/19971/31/19971/31/1997APASS
DetailsAlan Hauser
01/31/97 350 - insulation ok, ok to cover
INSP - Framing/Rough-in1/17/19971/21/19971/21/1997APASS
DetailsAlan Hauser
01/21/97 350 - frame corrections made, ok to insulate
INSP - Framing/Rough-in1/16/19971/17/19971/17/1997PFAIL
DetailsJim Storey
01/17/97 301 - FRI PM CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NO COVER
INSP - Framing/Rough-in1/16/19971/16/19971/16/1997AFAIL
DetailsWes Worcester
bcec penetrations not done, blk tji joists, fix cut anchor bolts at garage face
INSP - Framing/Rough-in1/15/19971/15/19971/15/1997PPART
DetailsWes Worcester
INSP - Carpentry12/4/199612/5/199612/5/1996ANH
DetailsWes Worcester
no one other than excavator there
INSP - Framing/Rough-in12/3/199612/4/199612/4/1996PNR
DetailsWes Worcester
no other inspections
INSP - Footings9/24/19969/25/19969/25/1996PPASS
DetailsWes Worcester
09/25/96 342 -
INSP - Final9/18/19969/19/19969/19/1996AFAIL
DetailsAlan Hauser
09/19/96 350 - CAN'T FIND THIS ADDRESS, STREET ENDS WITH 2032 AND 2039. EMPTY LOT
Issue PAID IN FULL permit  9/10/1996
PLANS/APPL TAKEN TO FRONT DESK  9/9/1996
Plan assigned to (338)8/30/1996 9/9/1996 PASS
09/09/96 09:59:36 338 - this action updated by action script from <<>> in Case No. BLD96-1988
Inspection Record Card- Bld  9/9/1996
Plan Reviewer's activity  9/6/1996 PEND
RESUBMITTED PLANS RECIEVED CHANGING THE GREAT ROOM TO AN UNFINISHED STORAGE ROOM. THIS ROOM IS NOT TO BE USED AS HABITABLE SPACE AND SEPREATE PERMITS WILL BE REQUIRED TO FINISHED ANY UNFINISHED SPACES.
Plan Reviewer's activity  9/4/1996 PEND
COONTACTED THE BUILDER/DESIGNER ON THE PLAN DEFICIENCIES
Print Pending Permit.LaserJet4  9/3/1996 FAIL
Routing - PLANNING8/19/1996 8/28/1996 PASS
Solar setback waived by public works. Approved by SB.
Routing - PLANNING7/30/1996 8/14/1996 FAIL
Reroute to Public Works for approval of original site plan; if approved planning will approve on the condition that the applicant also obtains written approval from ACHD on the eave encroachment. Reviewed by SB
Routing - PUBLIC WORKS7/29/1996 7/30/1996 PASS
Application received  7/30/1996
Routing - PUBLIC WORKS7/1/1996 7/2/1996 FAIL
Routing - PLAN CHECK8/28/1996   PEND
Routing - FRONT DESK8/28/1996   PEND