Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD96-02007
StatusFinaled
Name AIRPORT
Site Address 3201 AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(BOISE AIR TERMINAL - EAST ENTRY VESTIBULE) Fire sprinklers used for building area increase. To remodel the East end of the terminal building (baggage claim area) to create a new East entry vestibule and a 2nd floor exit stairway. Work is to include automatic swinging exit doors, a new steel and concrete exterior exit stairway, interior nonbearing walls, and suspended ceiling system all per approved drawings, engineering, and plan check conditions on file. Selective demolition is included in this permit. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. PC-404-96 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance  12/19/1996 PASS
ISSUED #12384 C OF C BY 301 THIS DATE.
INSP - Final12/18/199612/18/199612/18/1996 PASS
DetailsJim Storey
/ / 301 - FNL -OK FINAL
INSP - Final12/17/199612/18/199612/18/1996PPASS
Details
INSP - Fire Dept. Request12/6/199612/6/199612/6/1996 PASS
Details
/ / 405 - sprinkler relo rough in
INSP - Framing/Rough-in11/25/199611/26/199611/26/1996ANR
DetailsJim Storey
11/25/96 301 - OTH-OTHER AGENCIES NOT APPROVED ele n/r
(F) Reprint permit  11/25/1996
INSP - Framing/Rough-in11/12/199611/12/199611/12/1996PPASS
DetailsJim Storey
11/12/96 301 - FRAM-OK FRAMING Fweld & STRUCTURAL WELDING ok 1/4 bo plates
90 day tracking............. 7/30/199610/28/1996
INSP - Foundation10/21/199610/22/199610/22/1996APASS
DetailsJim Storey
10/21/96 301 - FND.REBAR. GATE 54..EARLY A.M. FDN -OK FOUNDATION
INSP - Footings10/18/199610/18/199610/18/1996PPEND
DetailsJim Storey
MAKE A U-TURN BY TOWER AND YOU WILL BE THERE PENDING S.I. REPORT
INSP - Conference10/11/199610/14/199610/14/1996APASS
DetailsJim Storey
10/12/96 301 - PRE-CONSTRUCTION INSPECTION GEN -GENERAL INSPECTION WORK ON EXAVATION IN PROGESS
Issue PAID IN FULL permit  10/7/1996
Telephone call  10/4/1996
CALLED CUSTOMER TO LET THEM KNOW PLANS ARE READY
Print Occupancy Form  10/4/1996
Inspection Record Card- Bld  10/4/1996
PLANS/APPL TAKEN TO FRONT DESK  10/4/1996 PASS
Received Certificate of Value  10/4/1996
Plan assigned to (CJW)8/23/1996 10/4/1996 PASS
DetailsCarl Westfall
10/04/96 15:36:50 CJW - this action updated by action script from <<>> in Case No. BLD96-2007
Plan Reviewer's activity  10/3/1996 PASS
Drawings approved October 3, 1996 after resubmittal was approved and modification to guardrail height provisions was approved by Tim Hogland, Building Director.
Plan resubmittals received  9/16/1996
Resubmittal received. Drawings approved on October 3, 1996.
Routing - FIRE9/4/1996 9/10/1996 PASS
Routing - PLANNING9/4/1996 9/3/1996 PASS
Approved by TKW. X-ref: ZC @ 3201 Airport Way
Telephone call8/28/1996 8/28/1996
Plan resubmittals requested8/28/1996 8/28/1996
Sent plan chect report to the architect. See "Conditions" for items that require a response.
Routing - PLAN CHECK8/26/1996 8/28/1996
Waiting for architect's response. Drawings approved on October 3, 1996 after modification of guardrail provisions by Tim Hogland,
Plans ACCEPTED BY PLAN CHECK  7/31/1996
Plan routing begun/TENANTS  7/31/1996
This plan to be reviewed by Plan Check and the Fire Department.
Application received  7/30/1996
Routing - PLAN CHECK9/10/1996   PEND