Case Summary (BLD) | | | 2/23/2004 | | |
|
|
|
|
INSP - Letter of compliance | | | 7/17/1997 | | PASS |
|
|
|
Letter of Compliance #13541 issued 7-17-97 by Monica.
|
INSP - Final | 7/14/1997 | 7/15/1997 | 7/15/1997 | P | NR |
|
|
|
07/15/97 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Miscellaneous | 6/9/1997 | 6/9/1997 | 6/9/1997 | | PASS |
|
|
|
/ / 338 - resubmittal review
|
INSP - Carpentry | 5/6/1997 | 5/7/1997 | 5/6/1997 | A | PASS |
|
|
|
05/07/97 333 - draft stop ok ì
|
INSP - Carpentry | 4/30/1997 | 5/1/1997 | 5/1/1997 | P | FAIL |
Carl Dependahl
|
|
|
05/01/97 340 - SHEETING FOR GABLE...C/N, NEED PLAN, SEAL DRAFT STOPS
|
INSP - Framing/Rough-in | 4/14/1997 | 4/14/1997 | 4/14/1997 | P | PASS |
|
|
|
04/14/97 338 - C/N ISSUED FOR THE FIRE BLOCKING
|
INSP - Footings | 3/10/1997 | 3/10/1997 | 3/9/1997 | P | PASS |
|
|
|
03/10/97 338 - ok to pour with the loose material cleaned out of the hol
|
INSP - Footings | 3/6/1997 | 3/7/1997 | 3/5/1997 | A | NR |
|
|
|
03/07/97 338 -
|
Routing - FIRE | 11/12/1996 | | 11/14/1996 | | PASS |
|
|
|
|
Routing - PLANNING | 11/6/1996 | | 11/12/1996 | | PASS |
|
|
|
RESUBMITTAL FOR P&Z REVIEW 11-06-96 KMM X-ref: DR-81-94 (CU-52-94). Approved by MS.
|
Plan routing begun/TENANTS | 11/6/1996 | | 11/6/1996 | | |
|
|
|
RESUBMITTAL ROUTING TO P&Z AND FIRE TO REVIEW. KMM 11-06-96
|
Issue PAID IN FULL permit | | | 9/27/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/1996 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/13/1996 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/1996 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/13/1996 | | |
|
|
|
|
FEE REVIEW-NOTES | | | 9/13/1996 | | FEES |
|
|
|
FEE FOR PLAN CHECK WAS COLLECTED ON ONE PERMIT OF 1661.12 FOR TWO JOBS. THESE JOBS WERE SPLIT UP INTO TWO PERMITS THE PLAN CHECK FEES WENT DOWN ON BLD96-2137. THE SECOND PERMIT BLD96-2176 I TOOK FEES OF 1188.40 AND APPLIED TO THE PLAN CHECK FEE (THESE FEES WERE TRANSFERRED WITH THE DATE THAT THE FEES WERE COLLECTED)LH
|
Plan assigned to (CJW) | 8/23/1996 | | 9/13/1996 | | PASS |
Carl Westfall
|
|
|
09/13/96 13:39:04 CJW - this action updated by action script from <<>> in Case No. BLD96-2137
|
Plan resubmittals received | | | 9/11/1996 | | |
|
|
|
Engineering received.
|
Plan resubmittals requested | | | 9/10/1996 | | |
|
|
|
Engineering required.
|
Plan Reviewer's activity | | | 9/10/1996 | | PASS |
|
|
|
Plan check started on Sept. 9, 1996. Plan check finished on Sept. 13, 1996 after Engineering was received.
|
Routing - PLANNING | 9/6/1996 | | 9/6/1996 | | PASS |
|
|
|
X-ref: DR-81-94/mod. Approved by MS.
|
Routing - PLAN CHECK | 9/6/1996 | | 9/6/1996 | | PEND |
|
|
|
|
Routing - PLANNING | 8/16/1996 | | 8/21/1996 | | FAIL |
|
|
|
X-ref: DR-81-94. Landscaping work (per the bond in our file) needs to be completed prior to issuance of additional/ other building permits.
|
Plan routing begun/TENANTS | | | 8/16/1996 | | |
|
|
|
Route to Planning then back to Plan Check. After Plan Check route to Fire Department.
|
Plans ACCEPTED BY PLAN CHECK | | | 8/15/1996 | | PASS |
|
|
|
ENGINEER CAME TO PLAN CHECK AND STAMPED AND SIGNED PLANS.
|
Recd Pcfee & Taken To Pln CK | | | 8/13/1996 | | PEND |
|
|
|
|
Application received | | | 8/13/1996 | | COPY |
|
|
|
|
Gay Receipt For Partial Pay | | | 8/13/1996 | | |
|
|
|
|
Application DENIED | | | 8/13/1996 | | PEND |
|
|
|
SONE ENGINEERING PLANS NOT STAMPOED AND SIGNED.
|
Routing - PLAN CHECK | 11/14/1996 | | | | |
|
|
|
|
Routing - BUILDING | 8/22/1996 | | | | PEND |
|
|
|
|