Permanent occupancy | | | 1/8/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9522 issued 1-8-03 to All About Lollipops.
|
BLD-Final | 1/6/2003 | 1/7/2003 | 1/7/2003 | A | PASS |
Carl Dependahl
|
|
|
###-####, guardrails, exit doors ok; verify other signatures at office (P&Z...heating as NA) 1/7/2003 11:20:27 AM
|
BLD-Final | 1/6/2003 | 1/6/2003 | 1/6/2003 | A | NR |
Carl Dependahl
|
|
|
###-####...not on AM list, rec'd later in day, unable to complete. 1/7/2003 9:15:02 AM
|
BLD-Conference | 12/20/2002 | 12/23/2002 | 12/23/2002 | A | PASS |
Carl Dependahl
|
|
|
###-####, Drew. ###-#### bill cole, plant mgr , plbg ok'd 12/23/2002 2:02:46 PM
|
BLD-Final | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | FAIL |
Carl Dependahl
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...c/n: rails, code enf signature, dead-bolts.... 12/23/2002 4:49:46 PM
|
BLD-Conference | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...verify plbg, bring plans. 12/20/2002 5:05:32 PM
|
BLD-Conference | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | CANC |
Carl Dependahl
|
|
|
|
FIRE-Final Inspection | 12/16/2002 | 12/17/2002 | 12/17/2002 | A | PASS |
Rick Jackson
|
|
|
DREW ###-#### OFFICE # ###-####
|
BLD-Conference | 12/16/2002 | 12/16/2002 | 12/16/2002 | P | PART |
Carl Dependahl
|
|
|
w/Drew( Coldwell Banker)...need to consult w/ George re: final, expire or??? has fire coming out12/16/2002 3:43:56 PM 12/16/2002 3:45:36 PM
|
FIRE-Final Inspection | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 13:04:19. Contact: ###-####. need annual sprinkler system inspection; storage height above 12 ft 1/8/2002 9:52:01 AM
|
BLD-Final | 1/4/2002 | 1/7/2002 | 1/7/2002 | P | NR |
Tom Arcoraci
|
|
|
###-#### neds all sigs on card 1/7/2002 1:11:20 PM
|
FIRE-Final Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | CANC |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 1/7/2002 12:54:24 PM added by inspector in eror 1/7/2002 1:01:15 PM
|
BLD-Final | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 10:46:58. Contact: ###-####. recall. 1/4/2002 2:16:16 PM
|
Plan Reviewer's activity | | | 1/4/2002 | | DONE |
|
|
|
NAME CHANGED from Custom Confections to All About Lollipops.
|
CHANGE STATUS TO (ISS) | | | 1/3/2002 | | DONE |
|
|
|
|
BLD-Conference | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PART |
Tom Arcoraci
|
|
|
for conf-- craig-- ###-#### needs landing and hand rail at west rear door if two steps may not need to be accessiable
1/2/2002 2:35:55 PM
|
Extend Permit 180 days | | 7/30/2001 | 7/30/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/30/2001 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/9/2001 | | DONE |
|
|
|
to reopen per Marlene and 50% due lh
|
Override - Parcel Holds | | | 6/19/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 5/12/2000 | | |
|
|
|
|
FIRE-Conference | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | PART |
Rick Jackson
|
|
|
Met with tenant and Perry to discuss items required to complete for final occupancy: additional exit; sprinklers; exit signs; handrails & guard rails.
|
BLD-Conference | 5/8/2000 | 5/11/2000 | 5/11/2000 | P | PART |
|
|
|
###-#### Bill with ll on the req for occupncy need stair and mez rails completed new dors inthe rear exit signage etc, also must verify the wall construction of the bioler room wall. 5/11/00 4:59:42 PM
|
Override - Parcel Holds | | | 5/8/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/14/1997 | | |
|
|
|
|
INSP - Miscellaneous | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | FAIL |
Wes Worcester
|
|
|
issued c/n to pick up permit/approved plan and begin corrections nlt 01/17/97.
|
INSP - Conference | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | FAIL |
Wes Worcester
|
|
|
met w/Toombs, George and Bob and will issue c/n
|
Telephone call | | | 1/13/1997 | | |
|
|
|
TALKED TO BILL COLE ON 1-10 AND VERIFIED WITH HIM AGAIN ON 1-13, PERMIT READY AND FEE DUE
|
Received Certificate of Value | | | 1/7/1997 | | |
|
|
|
Received certificate of value, prepared permit and forwarded to the front desk.
|
Inspection Record Card- Bld | | | 1/7/1997 | | |
|
|
|
|
Print Occupancy Form | | | 1/7/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/1997 | | PASS |
|
|
|
|
Received Certificate of Value | | | 12/27/1996 | | |
|
|
|
Received new certificate of value in letter form. Had to have Thomas Development complete one of the actual forms and return.
|
Plan Reviewer's activity | | | 12/18/1996 | | |
|
|
|
Received a letter from T. Mannschreck written on 11/26/96, stating he would fire sprinkler the entire structure. Still waiting for revised certificate of value before I can issue the permit.
|
Plan Reviewer's activity | | | 12/16/1996 | | |
|
|
|
Called tom Micklich at Design Resources to let him know that once I receive the letter from T. Mannschreck on the fire sprinklering, and receive a new certificate of value I will be able to issue the permit.
|
Plan resubmittals received | | | 12/6/1996 | | |
|
|
|
Received resubmittal sheet A-4.1 addressing the handrail redesign.
|
Plan Reviewer's activity | | | 12/2/1996 | | |
|
|
|
Sent a letter to R. Towle to let him know I was still lacking a letter for fire sprinklering the entire building from the owner, and that Item #6 of my plan review was still not adequately addressed.
|
Plan resubmittals received | | | 11/26/1996 | | |
|
|
|
Received revised sheets A-1 and A-4.1. Also received an accompanying letter which included a design change from the engineer to the "slip joint" at the top of the 1-hr. walls.
|
Plan Reviewer's activity | | | 11/21/1996 | | |
|
|
|
Sent E-mail to George S. and Wes W. letting them know I haven't received any responses to my 11/5/96 letter.
|
90 day tracking............. | | 8/15/1996 | 11/13/1996 | | |
|
|
|
|
INSP - Conference | 11/6/1996 | 11/7/1996 | 11/7/1996 | A | PART |
Wes Worcester
|
|
|
11/06/96 342 - 10 A.M.
|
Plan Reviewer's activity | | | 11/5/1996 | | |
|
|
|
Sent a letter back regarding the resubmittals received 10/29/96. Some items are still lacking compliance.
|
Plan resubmittals received | | | 10/29/1996 | | |
|
|
|
Received plan resubmittals sheets C1.1, A1.1, A-4.1 and A-5.
|
Routing - FIRE | 10/9/1996 | | 10/11/1996 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/9/1996 | | 10/9/1996 | | PEND |
|
|
|
Plans are still not approved. Prepared a letter and sent to R. Towle on 10/9/96 listing items to be readdressed. Sent plans on to the Fire Department for them to review resubmittals.
|
Plan Reviewer's activity | | | 10/9/1996 | | |
|
|
|
Sent letter to R. Towle discussing the proposed 2-hr. wall (if indeed it complies), and the requirements to resubmit concerning Items 6 and 8 of my plan review.
|
Plan resubmittals received | | | 10/4/1996 | | |
|
|
|
Resubmittal of new floor joists connecting mezzanine areas sent by FAX from K. Jones, structural engineer.
|
Plan resubmittals received | | | 9/30/1996 | | |
|
|
|
Resubmittals received sheets A-1, A1.1, A-4.1, A-5, M-1, cover letter from R. Towle and a "Primary Hazardous Materials Inventory Statement" for the Fire Department.
|
Meeting | | | 9/30/1996 | | |
|
|
|
Meeting with Rocky Towle, William Cole (plant manager), Tom Mannschreck (first part of meeting), Dave Miller (first part of meeting) and M. Southard. Went through items on Fire Department's plan check list including storage. Discussed possibility of fire sprinkering the structure for area increase and also discussed the option of fire sprinklering for high pile storage. Went through plan check list from the Building Dept. Discussed the letter to R. Towle from M. Southard explaining the reasons for not issuing a permit for storage racks at this time. R. Towle said that his intentions were to resubmit plans on September 30.
|
Plan Reviewer's activity | | | 9/27/1996 | | |
|
|
|
Sent letter to R. Towle on 9/27/96 notifying him that I could not issue a permit for the steel storage racks at this time. Sent copies to William Cole, D. Miller and G. Slane. See letter on file.
|
INSP - Conference | 9/26/1996 | 9/26/1996 | 9/26/1996 | | FAIL |
|
|
|
/ / 405 - checked for compliance with agreement to continue to operate violation issued, rack system used w/o approval, aisles blocked, fe's blocked. cole says they understood they could use the racks once submit
|
Received Certificate of Value | | | 9/24/1996 | | |
|
|
|
Received a certificate of value as a request to issue a separate permit for the steel storage racks. Signed by William Cole, Plant Manager.
|
INSP - Conference | 9/19/1996 | 9/19/1996 | 9/19/1996 | | FAIL |
|
|
|
/ / 405 - advised lowell that use of the racks was not approved until was approved. advised him that to continue to use the racks they could out a separate permit for the racks only. advised him to relocate a fir extinguisher which was
|
INSP - Conference | 9/11/1996 | 9/11/1996 | 9/11/1996 | | PART |
|
|
|
/ / 405 - recheck....cautioned cole on need to wrap up storage changes
|
INSP-Conference | 9/9/1996 | 9/9/1996 | 9/9/1996 | | PASS |
|
|
|
meeting new commitments, explained fd comments to B Cole reviewed HMIS requirements, reviewed Mixed comm calcs, not high hazard for finished product
|
Routing - PLUMBING | 9/5/1996 | | 9/6/1996 | | PASS |
|
|
|
|
INSP-Conference | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PART |
|
|
|
recheck w/slane...new schedule agreed on
|
INSP-Conference | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PART |
|
|
|
compliance visit, letter to slane on problems found
|
Routing - PLAN CHECK | 9/5/1996 | | 9/5/1996 | | PEND |
|
|
|
|
Routing - FIRE | 9/4/1996 | | 9/5/1996 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 9/5/1996 | | |
|
|
|
Steel storage rack designs were received via FAX on 9/5/96. They were reviewed and approved by Bob Garrison on 9/6/96.
|
INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 | | FAIL |
|
|
|
/ / 405 - inspect for compliance with 8/29 letter under which temp occ dropped off c/n from wes, issued c/n...did not meet deadlines for fe's, exit signage, or storage system.
|
Routing - PLAN CHECK | 8/29/1996 | | 9/4/1996 | | PEND |
|
|
|
9/4/96 - Plan Check was completed and a copy along with a cover letter was sent and FAXed to Rocky Towle on this date. Plans were then routed on to the Fire Department. (Plans are still incomplete as of this date - no plumbing plans or engineered racking plans yet.)
|
Application received | | | 8/29/1996 | | |
|
|
|
|
Meeting | | | 8/29/1996 | | |
|
|
|
Meeting with Tom Mannschreck, Lowel Fugel, Wes Bettis, Tim Hogland, George Slane, (Wes Worcester for a portion of the meeting) and Marlene Southard in attendance. Items in life safety list presented by George Slane (handwritten copy dated 8/29/96) was gone through on an item by item basis. A time frame for each item was proposed by Tom M. and agreed to be the group. End result of meeting: once a letter of committment for items initial list of life safety items presented by George along with a time frame is presented to Tim H. and he accepts he would release power. George S. was instructed to let Jim Schmer know to release power.
|
Routing - MECHANICAL | 8/29/1996 | | 8/29/1996 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/28/1996 | | |
|
|
|
Plans still lack plumbing drawings. Had a meeting with Rocky Rowle and Wes Bettis to provide them with a list of minimum items to be shown on a plumbing plans. (Jim Soden provided me with the list.)
|
Routing - PLAN CHECK | 8/27/1996 | | 8/27/1996 | | PEND |
|
|
|
PLANS TO MARLENE 2:25 PM DAR 8/27/96. 8/28/96 - Plans are still incomplete (lacking plumbing drawings and racking engineering). Mechanical has rejected the plans due to insufficient information.
|
Routing - PLANNING | 8/27/1996 | | 8/27/1996 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/27/1996 | | 8/27/1996 | | PASS |
|
|
|
ROUTED TO PUBLIC WORKS AT 08:47 AM 8/27/96. DAR RETURNED AT 10:35 AM 8/27/96. DAR
|
Plan Reviewer's activity | | | 8/27/1996 | | |
|
|
|
Spoke again with Tom Mannschreck by telephone. Apparently he misunderstood when I told him WE would route to agencies other than CDH and he could contact the different agencies by telephone to answer any of their concerns, so I reexplained it to him. I also told him that the plans were incomplete as they were missing plumbing drawings and that I would contact Rocky Towle (architect) to inform him also; and that the HVAC drawings may be incomplete. Tom said he would call the HVAC contractor to check on the completeness of plans.
|
Plan Reviewer's activity | | | 8/27/1996 | | |
|
|
|
Called and left a message for Rocky Towle that the plans lacked plumbing drawings and that maybe the mechanical was incomplete. (HVAC plans don't show the hood over steam kettles.)
|
Routing - PLAN CHECK | 8/27/1996 | | 8/27/1996 | | PEND |
|
|
|
PLANS TAKEN TO MARLENE SO SHE CAN CHECK AS TO CONDITIONS PLACE ON PROJECT BY BOB JUE. 10:37 8/27/96.
|
Routing - MECHANICAL | 8/27/1996 | | 8/27/1996 | | FAIL |
|
|
|
SENT PLANS TO MECH AT 10:45. ADVISED BOB ARCHIBALD OF SAME. RECEIVED PLANS BACK FROM MECHANICAL AT 2:15 PM DAR 8/27/96
|
Routing Off Site - C.D.H | 8/26/1996 | | 8/27/1996 | | PASS |
|
|
|
CONTACTED LOWELL FUGEL AT ###-#### FOR CDH PICKUP. INSTRUCTED HIM TO BRING THEM BACK SO WE CAN ROUTE TO OTHER PLACES. KMM RECEIVED BACK FROM CDH AT 08:40 AM 8/27/96. DAR
|
Plan routing begun/TENANTS | | | 8/26/1996 | | |
|
|
|
Plans to be hand carried by tenant to Central District Health then returned. The plan technician to then route to Planning, Public Works, Plumbing, Mechanical then back to Plan Check. After Plan Check the plan technician to route to Fire Department.
|
Plan Reviewer's activity | | | 8/26/1996 | | |
|
|
|
Telephone call with Tom Mannschreck. Explained the routing process and that he could hand carry to CDH and then return. We would route to other agencies and he could follow up by contacting them to see if anything else was needed.
|
Plans ACCEPTED BY PLAN CHECK | | | 8/23/1996 | | |
|
|
|
Plan sheets C1.1, A1.1, A-1, A-4.1, A-5 and M-1 received. Routing to other agencies begun.
|
INSP - Conference | 8/21/1996 | 8/21/1996 | 8/21/1996 | A | FAIL |
|
|
|
08/22/96 405 - inspection for compliance of building - no current permit operation as warehouse, construction stopped by ww. SEVERE EXITING AND FIRE HAZARD PROBLEMS
|
Application/Plans DENIED | | | 8/20/1996 | | |
|
|
|
Plans submitted were incomplete. Had a meeting with Rocky Towle (architect) to discuss the submittal requirements and to go over the letter given to him dated 8/20/96.
|
Meeting | | | 8/20/1996 | | |
|
|
|
Had a meeting with Wayne Gibbs (Planning Director), Wes Bettis (Thomas Development) and the tenant Lowell Fugal to discuss how to obtain a zoning certificate for the manufacturing in a commercial zone.
|
Plan Reviewer's activity | | | 8/20/1996 | | |
|
|
|
Wrote a letter to Rocky Towle (architect) for the project letting him know the status, necessary plan submittal requirements and what agencies would be reviewing the plans.
|
Unassigned to Plan Reviewer | 8/15/1996 | | 8/20/1996 | | |
|
|
|
|
Gay Receipt For Partial Pay | | | 8/15/1996 | | |
|
|
|
|
Application received | | | 8/15/1996 | | |
|
|
|
|
Meeting | | | 8/12/1996 | | |
|
|
|
Meeting with Rocky Towle (architect) and West Bettis (Thomas Development) to let them know what plans would be required and to discuss the need for plan review and permits.
|
Plan assigned to (MYS) | 8/20/1996 | | 1/7/1996 | | PASS |
Marlene Southard
|
|
|
|
Routing - PLAN CHECK | 10/11/1996 | | | | PEND |
|
|
|
|