Permit Information
Permit NumberBLD96-02201
StatusFinaled
Name BIEN HOA RESTAURANT
Site Address 1098 N ORCHARD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel an existing 2,197 sq.ft. tenant space for restaurant serving soup and sandwiches per approved plans on file. Work to include removal of approximatly 6lf of existing wall and rebuilding in a new location to form a new accessible rest room, installation of a class one hood and one-hour shaft, installation of new kitchen equipment, infilling on one-hour rated opening in tenent demising wall, extending one 12lf half wall to ceiling to form a new office and misc interior upgrading per approved plan attached. (P.C.#455-96) prp
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/14/1998 7/22/1998
Permanent Occupancy 5/5/19975/5/1997 DONE
Details
Permanent occupancy  5/5/1997 PASS
Perm. Occ. Cert. #6848 issued 5-5-97 to the Bien Hoa Cafe.
INSP - Final5/2/19975/1/19975/1/1997PPASS
Details
SHAFT COMPLETE DUCT CLEARANCES MADE OK BY WORKERS IN MY PRESENCE
INSP - Final4/25/19974/25/19974/25/1997PNR
Details
04/28/97 338 - REINSPECTION/ FONG SAY'S SHAFT OPENED UP MORE NOW not rea
INSP - Conference4/25/19974/25/19974/25/1997 FAIL
Details
/ / 338 - with hood installer they will get shaft opened up for proper near future
INSP - Final4/1/19974/2/19974/1/1997PFAIL
Details
04/02/97 338 - BIEN HOA fail c/n issued not enough of the shaft exposed inspection
INSP - Final3/3/19973/4/19973/4/1997PPART
Details
03/03/97 338 - FINAL FOR C/O ok for temp occ only c/n issued TCO -TEMP C OF O ISSUED ok for same
INSP - Final3/4/19973/4/19973/4/1997 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
Temporary occupancy  3/4/1997 PASS
Temp. Occ. Cert. #3380 issued 3-4-97 to the Bien Hoa Cafe.
INSP - Final2/28/19973/3/19973/3/1997PFAIL
DetailsJoe Tawney
03/03/97 406 - 1:30 pm/ BIEN HOA RESTAURANT/ REINSPECTION REINSP FOR FINAL FAIL MAX OCC SIGN REAR EXIT DOOR HARDWRE
INSP - Final2/26/19972/26/19972/26/1997PFAIL
DetailsJoe Tawney
02/26/97 406 - THIS IS THE ONE THAT WAS SET FOR 8:30AM TODAY FINAL FAILED NUMBER OF ITEMS
(F) Reprint permit  2/25/1997
Print Occupancy Form  2/24/1997
Plan assigned to (PRP)8/20/1996 11/22/1996 PASS
Details
11/22/96 09:54:44 PRP - this action updated by action script from <<>> in Case No. BLD96-2201
Print Occupancy Form  11/22/1996
Telephone call  11/22/1996
TALKED TO PHONG VO TOLD HIM PLANS ARE READY GAVE DOLLAR AMOUNT
Issue PAID IN FULL permit  11/22/1996
Print Pending Permit.LaserJet4  11/22/1996 PASS
files
Inspection Record Card- Bld  11/22/1996
Plan Reviewer's activity  11/22/1996 PASS
reviewed returned plans and resubmittals for completion and compliance. approve, assemble and issue.
PLANS/APPL TAKEN TO FRONT DESK  11/22/1996 PASS
issue
Print Pending Permit.LaserJet4  11/22/1996
Routing - MECHANICAL11/13/1996 11/21/1996 PASS
FIELD REVIEW, NO PLAN CHECK. DAR 11/21/96
Routing - PLUMBING11/12/1996 11/13/1996 PASS
Plan resubmittals received  11/13/1996 PASS
received final copy .
Routing - PLAN CHECK10/23/1996 11/12/1996 PEND
Plan resubmittals received  11/8/1996 FAIL
recieved resubs, review and issue correction notice on these plans, assemble plumbing and mechanical to plans and recirculate to these Depts for approval.
Plan resubmittals requested11/22/1996 11/8/1996
Routing - FIRE10/23/1996 10/29/1996 PASS
Routing - PLANNING10/22/1996 10/22/1996 PASS
X-ref: ZC @ 1098 N. Orchard. Approved by GRH.
Plan resubmittals requested10/22/1996 10/22/1996
Waiting for Cert. of Value10/22/1996 10/22/1996
Plan Reviewer's activity  10/21/1996 PEND
Review Plans and attachments, mark-up, prepare Plan Analyst review with corrections, fax corrections to Arch, forward to Fire Dept.
Plans ACCEPTED BY PLAN CHECK  10/21/1996 PEND
received plans for review by this department.
Routing - PLUMBING10/15/1996 10/16/1996 FAIL
provide plumbing plan as required
Routing - MECHANICAL10/15/1996 10/15/1996 FAIL
Routing - PUBLIC WORKS10/8/1996 10/14/1996 PASS
Routing - PLAN CHECK10/7/1996 10/8/1996 PEND
Prepared plans for routing after receiving resubmittals.
Routing Off Site - C.D.H8/21/1996 10/4/1996 FAIL
JOHN WILL BE TAKING RESUBMITALLS FOR NEW KITCHEN EQUIPMENT OUT TO CDH FOR REVIEW. PER PHONE CALL I RECEIVED FROM JOHN 9-16-96. MARLENE REQUESTED HE DO SO. I INSTRUCTED JOHN TO BRING BACK BOTH PLANS AND RESUB. PLANS TOGETHER. KMM 9-16-96 resubs recieved from CDH however the plans were not signed off kmm 10-04-96
Plan resubmittals received  10/2/1996
Resubmittal sheets 2 and kitchen plan from Bargreen Ellingson received and forwarded out to Central District Health.
Telephone call  9/16/1996 PASS
JOHN COOK CALLED WILL BE RESUB. NEW KITCHEN PLANS. MARLENE SAID HAVE JOHN TAKE RESUBS. TO CDH WHERE PLANS ARE (8-21-96), AND HAVE CDH LOOK AT RESUBS. THEN BRING PLANS AND RESUB. KITCHEN PLANS BACK ALL TOGETHER. KMM 9-16-96
Plan routing begun/TENANTS  8/20/1996
Route to Planning, Central District Health, Public Works, Plumbing, Mechanical then back to Plan Check. After Plan Check route to Fire Department.
Recd Pcfee & Taken To Pln CK  8/19/1996
Gay Receipt For Partial Pay  8/19/1996
Application received  8/19/1996
Plans ACCEPTED BY PLAN CHECK  8/19/1996
Routing Off Site - C.D.H10/22/1996 10/22/1909 PASS
CAROL JOHNSON CAME IN AND SIGNED OFF CDH APPROVED. KMM 10-22-96. SHE APPROVED THEM ON 10-04-96 BUT HAD NOT SIGNED THEM OFF UNTIL TODAY. 10-22-96
Routing - PLAN CHECK11/21/1996