Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD96-02261
StatusFinaled
Name COLUMBIA VILLAGE ELEMENTARY SC
Site Address 3701 LAKE FOREST DR
Project NameSCHOOL
Customer Number 
ePlanReviewNo
Description
(COLUMBIA VILLAGE ELEMENTARY SCHOOL)(PHASE II, BALANCE OF PROJECT) TO CONSTRUCT A ONE STORY SCHOOL BUILDING WITH 46,280 SQUARE FEET AND TWO CONSTRUCTION TYPES, THIS STRUCTURAL PLAN REVIEW WAS BY THE (Idaho Department of Labor) THE ACCEPTANCE OF THE BUILDING ANALYSIS IS BY DAVID HATTRICK-08/23/96, PER PLANS ON FILE. NOTE! BOISE CITY INSPECTION DEPARTMENT WILL HANDLE ALL FIELD CHANGES AND OR CONCERNS. NOTE! ON 8/9/96: PARTIAL PERMIT (PHASE I) ISSUED FOR FOOTINGS AND FOUNDATION AS AUTHORIZED BY T. HOGLAND, BLDG. DEPT. DIRECTOR. SEE BLD96-1741 ALONG WITH COMMENTS. CU-20-96.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  8/1/1997 PASS
Perm. Occ. Cert. #6935 issued 8-1-97 to Columbia Village Elementary School.
INSP - Final7/30/19977/30/19977/30/1997PPASS
DetailsBob Archibald
cn made ok
Permanent Occupancy 7/30/19977/30/1997 DONE
Details
INSP - Final7/24/19977/25/19977/25/1997AFAIL
DetailsJim Storey
07/25/97 301 - c/n pending for occ. doors in gym
INSP-Final Inspection7/7/19977/10/19977/10/1997AFAIL
Details
alarms still not zoned , air pressure monitor not wired correctly
INSP - Conference7/8/19977/8/19977/8/1997 PASS
DetailsJim Storey
/ / 301 - dead bolts on exit doors of restrooms approved by state of i and as per architect drawings in spec. book submitted.
INSP-Sprinkler Rough-in/Hydro7/1/19977/2/19977/2/1997APASS
DetailsJoe Tawney
07/01/97 406 - AT 9 A.M. WITNESTED TRIP TESTS OF 2 DP SYSTEMS AFTER SPLIT OF 1 SYST EACH SYST NOW LESS THAN 750 GAL. ALSO PICKED UP REVISED PLANS AND REV CA
INSP-Final Inspection6/18/19976/19/19976/19/1997AFAIL
Details
TIME GOT WORSE, 1:30 TO 2:00.....ALARMS STILL NOT COMPLETE
INSP-Final Inspection6/13/19976/13/19976/13/1997PFAIL
Details
sprinklers failed 60 sec test (75). alll signals are alarm, low air not set, need as builts for docs
INSP - Conference6/10/19976/10/19976/10/1997 PASS
DetailsJim Storey
/ / 301 - NWP -GENERAL INSPECTION - NO WORK IN PROGRESS
INSP-Sprinkler Rough-in/Hydro6/6/19976/6/19976/6/1997PPASS
Details
HYDRO on above ground
INSP-Conference4/15/19974/15/19974/15/1997APASS
Details
meet w/ power plus, TED, DISCUSSED DUCT DETECTOR LOCATIONS, TOLD REMOTE INDICATORS WILL BE REQUIRED, TOLD TO MOVE SMOKE DETECTORS TO WITHIN 5 FT OF DOORS ON HOLD OPENS. LOOKED AT PLANS, TOLD WILL NEED AS BUILTS WITH ALL CALCULATIONS FOR FINAL
INSP-Sprinkler Rough-in/Hydro4/2/19974/3/19974/3/1997APART
Details
underground hydro ok
INSP-Supply line flush4/2/19974/3/19974/3/1997APASS
Details
8:30 am, FEW ROCKS, FAIRLY CLEAN, GOOD FLOW
INSP-Sprinkler Rough-in/Hydro3/27/19973/27/19973/27/1997APART
Details
hallway coverage, overbuilds along halls completed, media center complete, only place lacking is overbuilds at each corner of meia center away from gym
INSP-Conference3/21/19973/21/19973/21/1997APART
Details
phone conf w/ gus, CM. Mel Fletcher wants ceiling space above halls sprinkled since actual gap is 8" instead of 6" in many places. Will discuss w/ Fetcher. Plans called for 6" but sprinkler main and ML beams forced to 8".
INSP - Ceiling grid3/18/19973/19/19973/19/1997APART
DetailsJim Storey
03/19/97 301 - SCLG-OK SUSPENDED CEILING
INSP-Sprinkler Rough-in/Hydro3/19/19973/18/19973/18/1997PPASS
Details
approved plan to sprinkle exposed comb const above media center w/ heads along walls only
INSP-Sprinkler Rough-in/Hydro3/17/19973/17/19973/17/1997APASS
Details
check media center exposed combustible construction, concealed space, need to extend foil wrap or sprinkle. hall lid ok using 96 nfpa 13 w/ new exceptions
INSP - Ceiling grid3/10/19973/11/19973/11/1997APART
DetailsJim Storey
03/11/97 301 - SCLG-OK SUSPENDED CEILING south wing
INSP-Sprinkler Rough-in/Hydro2/19/19972/20/19972/20/1997APART
Details
issued c/n on MECHANICAL SPACE ABOVE KITCHEN. and RISER Access issues
INSP-Conference2/14/19972/14/19972/14/1997PPART
Details
CONF ON RISER LOCATION OPTIONS
INSP-Sprinkler Rough-in/Hydro2/12/19972/13/19972/13/1997APART
Details
ROUGH IN CAFETERIA AND GYM, PROBLEM WITH RISER ROOM LOCATION
INSP - Framing/Rough-in1/29/19971/30/19971/30/1997APASS
DetailsJim Storey
01/30/97 301 - FRAM-OK FRAMING OCC SEPECTION
INSP-Sprinkler Rough-in/Hydro1/24/19971/28/19971/29/1997PPART
Details
AREAS E & F ok to cover 1st floor w/ conditions for access to areas not complete...c/n with condition noted
INSP - Framing/Rough-in1/17/19971/21/19971/21/1997APASS
DetailsJim Storey
01/21/97 301 - C WING OK
INSP - Wall cover1/15/19971/15/19971/15/1997PPASS
DetailsJim Storey
01/15/97 301 - roof nailling at gym roof and fire rated ply in place as
INSP - Framing/Rough-in1/8/19971/9/19971/9/1997APART
DetailsJim Storey
01/09/97 301 - conf. re insp. for 1/10/97
INSP - Roof1/2/19971/3/19971/3/1997APART
DetailsWes Worcester
will finish this pm
INSP - Roof12/31/199612/31/199612/31/1996APART
DetailsWes Worcester
East and Northeast roof sections ok
INSP - Roof12/30/199612/30/199612/30/1996PNR
DetailsWes Worcester
still putting on roof....will walk Tues am
INSP - Roof12/27/199612/30/199612/30/1996ANR
DetailsWes Worcester
ROOF NAILING said he called for pm....will reschedule
INSP - Conference11/22/199611/22/199611/22/1996APASS
DetailsWes Worcester
picked up address and permit #
INSP - Conference11/21/199611/21/190011/21/1996 FAIL
conference w/Bob & George @ earlier conversation w/Gus
INSP - Conference11/14/199611/14/199611/14/1996 FAIL
super had stated that he would call in w/approximate time and place for next lift and a conference for coordination
INSP - Conference11/12/199611/12/199611/12/1996 PART
stopped in again to get on scheduled lifts and so we could make computer entries to coincide w/progress
INSP - Masonry11/6/199611/6/199611/6/1996 NR
stopped by to look at project, not plaving grout at that time, asked super to call in for conference.
INSP - Flatwork10/28/199610/28/199610/28/1996 FAIL
notified super that mesh was not being imbedded in concrete. Special insp was reg'd according to super as pour was 3000 + concrete
INSP - Conference10/15/199610/15/199610/15/1996 PASS
Details
/ / 405 - issued letter on requirements
INSP - Conference10/14/199610/14/199610/14/1996 PASS
Details
/ / 405 - discussed alarm and sprinkler requirements for project
Meeting  8/28/1996 PASS
In a meeting with Bob Garrison, it was discussed that this plan was reviewed by Ken Hartell, DLIS, State of Idaho. As agreed on with the Director on many occasions, School Building projects reviewed by the State of Idaho would be constructed as per the approved plans.
(F) Reprint permit  8/28/1996
Issue PAID IN FULL permit  8/27/1996
Inspection Record Card- Bld  8/23/1996
Print Occupancy Form  8/23/1996
Inspector's copy Bld permit  8/23/1996
Application received  8/23/1996
Permit taken to Permit Desk  8/23/1996 NA
THE BUILDING AS DESIGNED IS IN VIOLATION OF THE BUILDING CODE FOR ALLOWED AREA, SEE SHEET AO.1 OF THE PLANS. THIS PROJECT AS SUBMITTED HAS BEEN ACCEPTED BY THE CITY BUILDING DEPARTMENT PER DAVID HATTRICK ON THIS DATE 08/23/96.
INSP-Final Inspection7/24/19977/24/19977/24/1996APASS
Details
alarms completed-main bldg
Unassigned to Plan Reviewer