Code Occupancy Approval | | | 2/11/1999 | | FAIL |
|
|
|
Did not receive requested file until 2/11/99. This was a 3-Phase proj./no data available. Made inspection afternoon of 2/11. Planter at northeast corner of the parking lot - not in.(They willbe unable to finish this until further into proj. phases as they need to keep the traffic circulating thourgh this project. Sidewalk and landscape strip at the far northwest boundary along Hilton St - not in. Missing tree from planter located midway from Hilton to end of first planter line at the south of parking lot. Most allother trees and plantings are in this lot except those that have been displaced by placement of parking lot lighting and fire hydrant. Plaza not in. Putting in the plaza requires the demo of building which is occupied and under lease. Building in Phase II is in. Because of the locatin of building and walkway there are some trees on the approved plans they will not be able to put in there is virtually no room to plant trees in this area (3). Spoke with Sterling on-site. Suggested they contact Martin Santoya, Design Review Analyst in Planning & Dev and request Modification to the phasing of project so they could get Phase I signed off.
|
INSP - Final | 2/5/1999 | 2/9/1999 | 2/9/1999 | A | PASS |
|
|
|
02/09/99 338 - made okwith 406 blessing
|
Code Occupancy Approval | | | 2/9/1999 | | |
|
|
|
final occupancy requested by Gary Beck ###-####
|
INSP - Final | 2/3/1999 | 2/3/1999 | 2/3/1999 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION ON SHELL AND CORE
|
PubWorks Occupancy Approval | | | 1/19/1999 | | DONE |
|
|
|
Drainage project complete 01/19/99, S.Landaluce
|
Receive PAYMENT IN FULL | | | 11/23/1998 | | |
|
|
|
|
(F) Reprint permit | | | 10/29/1998 | | |
|
|
|
|
(F) Reprint permit | | | 10/29/1998 | | |
|
|
|
|
(F) Reprint permit | | | 10/27/1998 | | |
|
|
|
|
(F) Reprint permit | | | 10/16/1998 | | |
|
|
|
|
CHANGE STATUS TO (F) | | | 10/16/1998 | | |
|
|
|
|
Fee Review-notes | 9/22/1998 | | 9/22/1998 | | FEES |
|
|
|
ADDITIONAL VALUE OF 340,229.00 LH
|
INSP-Sprinkler Rough-in/Hydro | 5/26/1998 | 5/26/1998 | 5/26/1998 | P | CANC |
Joe Tawney
|
|
|
05/26/98 406 - shelly ###-#### CANCEL WRONG PERMIT NMBR
|
INSP-Final Inspection | 4/1/1998 | 4/2/1998 | 4/2/1998 | P | PART |
Joe Tawney
|
|
|
04/02/98 406 - SHELLIE ###-#### OK ON ROUGH IN OF GLAZING SPKLRS CHECK HORIZONTAL DISTANCES TO GLASS
|
INSP - Framing/Rough-in | 3/31/1998 | 4/1/1998 | 4/1/1998 | P | PART |
|
|
|
04/01/98 338 - made ok called mike
|
INSP-Sprinkler Rough-in/Hydro | 2/3/1998 | 2/4/1998 | 2/4/1998 | A | PASS |
Joe Tawney
|
|
|
02/04/98 406 - conference shelly ###-#### CONF OK TO MOVE FDC TO NW CORNER OF NEW ADDITION WEST OF EXIST BANK BLD
|
INSP-Conference | 2/4/1998 | 2/3/1998 | 2/3/1998 | P | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF 2/3/98 WITH GEN CONTR REGARDING SPKLR PROTECTION FOR ATRIUM GLAZW GLASS
|
INSP - Framing/Rough-in | 1/5/1998 | 1/6/1998 | 1/6/1998 | A | PASS |
|
|
|
01/06/98 338 - MADE OK
|
INSP-Final Inspection | 12/31/1997 | 12/31/1997 | 12/31/1997 | | PART |
|
|
|
OK FOR TEMP ON 1ST FLR TO ACCOMODATE TI FOR SYRINGA BANK BLD97-1328
|
INSP-Sprinkler Rough-in/Hydro | 12/29/1997 | 12/30/1997 | 12/30/1997 | P | FAIL |
Joe Tawney
|
|
|
12/30/97 406 - at 2pm PARTIAL FINAL ON SHELL FAIL INSTALL HEADS IN BASEMENT CORRIDOR
|
INSP-Sprinkler Rough-in/Hydro | 12/19/1997 | 12/19/1997 | 12/19/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR SYSTEM HYDRO TEST
|
INSP-Final Inspection | 12/17/1997 | 12/18/1997 | 12/19/1997 | P | NR |
Joe Tawney
|
|
|
12/18/97 406 - READY AT 2:00 NOT READY FOR FINAL ON SHELL ì
|
INSP - Framing/Rough-in | 12/16/1997 | 12/17/1997 | 12/18/1997 | A | PASS |
|
|
|
12/17/97 338 - RESTROOMS ON 2ND AND 3RD FLOOR madee ok with elec insp ap
|
INSP - Conference | 10/20/1997 | 10/20/1997 | 10/20/1997 | P | PASS |
|
|
|
with glazers on the spandrell panels
|
INSP - Framing/Rough-in | 10/10/1997 | 10/13/1997 | 10/14/1997 | A | PART |
|
|
|
also fire wall need to see the actual install of glazing at tew fire stop super is to set up an insp at that time
|
INSP-Conference | 10/7/1997 | 10/7/1997 | 10/7/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF ON SPKLR COVERAGE FOR ATRIUM
|
INSP - Set-back | 9/11/1997 | 9/11/1997 | 9/11/1997 | | PART |
|
|
|
/ / 338 -
|
INSP - Framing/Rough-in | 9/9/1997 | 9/10/1997 | 9/10/1997 | P | NR |
|
|
|
09/10/97 338 - out of time
|
INSP - Framing/Rough-in | 9/10/1997 | 9/10/1997 | 9/10/1997 | | PART |
|
|
|
/ / 338 -
|
INSP - Framing/Rough-in | 8/11/1997 | 8/12/1997 | 8/11/1997 | A | PASS |
|
|
|
08/12/97 338 - OK TO COVER BEHIND OTHER TRADES
|
INSP-Sprinkler Rough-in/Hydro | 7/18/1997 | 7/18/1997 | 7/18/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - ROUGH IN BASEMENT, FLOORS 1 & 2 OK TO COVER
|
INSP - Framing/Rough-in | 7/16/1997 | 7/17/1997 | 7/17/1997 | P | PASS |
|
|
|
07/17/97 338 - made ok in areas to this point to follow behind ele insp.
|
INSP - Masonry | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | PASS |
|
|
|
06/24/97 338 - made ok with the sp insp approval
|
INSP - Masonry | 6/16/1997 | 6/16/1997 | 6/16/1997 | P | PASS |
|
|
|
06/16/97 338 - made ok with sp insp ok
|
INSP - Masonry | 6/13/1997 | 6/13/1997 | 6/12/1997 | P | PASS |
|
|
|
06/13/97 338 - made ok with sp insp approval
|
INSP - Masonry | 6/11/1997 | 6/12/1997 | 6/12/1997 | A | PASS |
|
|
|
06/12/97 338 - made ok with the sp insp blessing
|
INSP - Masonry | 6/9/1997 | 6/10/1997 | 6/10/1997 | A | PASS |
|
|
|
06/10/97 338 - made ok with sp insp blessing
|
INSP - Masonry | 6/5/1997 | 6/6/1997 | 6/6/1997 | A | PASS |
|
|
|
06/06/97 338 - made ok with sp insp approval
|
INSP - Masonry | 5/30/1997 | 6/2/1997 | 6/2/1997 | A | PASS |
|
|
|
06/02/97 338 - ok with sp insp blessing
|
INSP - Masonry | 5/23/1997 | 5/23/1997 | 5/23/1997 | P | PASS |
|
|
|
05/23/97 338 - ok with sp insp ok
|
INSP - Masonry | 5/21/1997 | 5/22/1997 | 5/22/1997 | A | PASS |
|
|
|
05/22/97 338 - made ok with sp insp aok
|
INSP - Masonry | 5/20/1997 | 5/20/1997 | 5/19/1997 | P | PASS |
|
|
|
05/20/97 333 - GROUT GRID GRID GROUT??????? HA HA PERRRRRR FROM MONNN
|
INSP - Masonry | 5/19/1997 | 5/19/1997 | 5/19/1997 | P | PASS |
|
|
|
05/20/97 333 - GROUT MASN-REBAR OK
|
INSP - Masonry | 5/16/1997 | 5/16/1997 | 5/16/1997 | P | PASS |
|
|
|
05/16/97 338 - made ok with the sp insp approval
|
INSP - Masonry | 5/15/1997 | 5/15/1997 | 5/15/1997 | P | PASS |
|
|
|
05/15/97 338 - made ok with sp insp blessing
|
INSP - Masonry | 5/14/1997 | 5/14/1997 | 5/13/1997 | P | PASS |
|
|
|
05/14/97 338 - made ok with ethe special insp blessing
|
INSP - Masonry | 5/8/1997 | 5/9/1997 | 5/9/1997 | A | PASS |
Jim Storey
|
|
|
05/09/97 301 - covered special insp.
|
INSP - Masonry | 5/6/1997 | 5/7/1997 | 5/6/1997 | A | PART |
|
|
|
05/07/97 333 - MASN-REBAR OK west wall @+-30ft
|
INSP - Masonry | 5/5/1997 | 5/6/1997 | 5/6/1997 | A | PASS |
|
|
|
05/06/97 338 - ok with sp insp
|
INSP - Masonry | 5/5/1997 | 5/5/1997 | 5/5/1997 | P | PASS |
|
|
|
05/05/97 338 - GROUTMADE OK WITH THE SP INS OK
|
INSP - Masonry | 5/1/1997 | 5/2/1997 | 5/2/1997 | A | PART |
Carl Dependahl
|
|
|
05/02/97 340 - GROUT... PENDING SPEC INSP REPORT
|
INSP - Foundation | 1/14/1997 | 1/14/1997 | 1/14/1997 | P | PASS |
|
|
|
01/14/97 338 - WEATHER PRO IN PLACE SPECIAL INSP IN PLACE
|
INSP - Foundation | 1/10/1997 | 1/13/1997 | 1/13/1997 | A | PASS |
|
|
|
01/13/97 338 - FND. REBAR. MADE OK WEATHER PRO OK
|
INSP - Foundation | 1/2/1997 | 1/3/1997 | 1/1/1997 | A | PASS |
|
|
|
01/03/97 338 - r-bar placed weather pro in place
|
INSP - Foundation | 12/27/1996 | 12/27/1996 | 12/27/1996 | P | PART |
Jim Sly
|
|
|
12/27/96 316 - Inspection of found...W 1/2f N wall and N 1/2f W wall ... inspection approval.
|
INSP - Foundation | 12/24/1996 | 12/26/1996 | 12/26/1996 | A | NH |
Jim Sly
|
|
|
12/26/96 316 - rebar Inspection at 10:45 AM NOBODY WAS THERE
|
INSP - Foundation | 12/13/1996 | 12/16/1996 | 12/16/1996 | A | PASS |
|
|
|
12/16/96 338 - FND.REBAR r-bar placed weather pro in place spec insp mad
|
INSP - Footings | 12/6/1996 | 12/6/1996 | 12/6/1996 | P | PASS |
|
|
|
12/06/96 338 - made ok spec insp made ok
|
INSP - Footings | 12/5/1996 | 12/5/1996 | 12/5/1996 | P | NR |
|
|
|
12/05/96 338 - not ready will recall
|
INSP - Footings | 11/27/1996 | 11/27/1996 | 11/27/1996 | P | PART |
|
|
|
11/27/96 338 - PARTIAL MADE OK EAST WALL TO S CORNER SOUTH WALL COMPLETE
|
INSP - Footings | 11/26/1996 | 11/26/1996 | 11/26/1996 | P | PASS |
|
|
|
11/26/96 338 - r-bar placed special insp made ok
|
90 day tracking............. | | 8/28/1996 | 11/26/1996 | | PEND |
|
|
|
|
INSP - Footings | 11/25/1996 | 11/25/1996 | 11/25/1996 | P | PASS |
|
|
|
11/25/96 338 -
|
INSP - Conference | 11/21/1996 | 11/22/1996 | 11/25/1996 | A | PASS |
|
|
|
11/25/96 338 - made ok met with super will set time for the pre job conf
|
(F) Reprint permit | | | 11/5/1996 | | |
|
|
|
|
Telephone call | | | 11/4/1996 | | |
|
|
|
TOLD GARY BECK PERMIT READY
|
Issue PAID IN FULL permit | | | 11/4/1996 | | |
|
|
|
|
Print Occupancy Form | | | 11/4/1996 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/4/1996 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/1996 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/4/1996 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/23/1996 | | 11/1/1996 | | PASS |
|
|
|
SENT RESUBMITTALS OUT TO CH2MHILL ATTEN. HOWIE HENRIKSON PER PDQ 10-23-96 KMM PACKAGE #3 Plans approved per H. Henrickson 11-01-96. MO
|
Plan assigned to (M_O) | 9/11/1996 | | 11/1/1996 | | PASS |
|
|
|
plans received for review 9-11-96. MO Corrrection list faxed and mailed to architect 9-30-96 MO. Plan review is complete by plan check except for structural as of 10-23-96. MO Plans approved by all agencies except structural review of resubmittals has not been completed as of 10-31-96. MO
|
Routing - FIRE | 10/24/1996 | | 10/30/1996 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 8/28/1996 | | 10/28/1996 | | PEND |
|
|
|
PACKAGE #4 CONTACTED JIM OTRADOSKY AT ###-#### FOR ACHD PICKUP. ACHD FEES NOT PAID.
|
Routing - PLAN CHECK | 10/11/1996 | | 10/24/1996 | | |
|
|
|
PACKAGE #1 KMM
|
Plan resubmittals received | | | 10/23/1996 | | PASS |
|
|
|
PACKAGE #3
|
Plan resubmittals received | | | 10/14/1996 | | PASS |
|
|
|
REVISED PLUMBING PLAN SHEET P1.01 (ADDITIONAL) TAKEN TO PLUMBING. KMM
|
Routing - PLUMBING | 10/9/1996 | | 10/10/1996 | | PASS |
|
|
|
PACKAGE 1
|
Routing - FIRE | 10/1/1996 | | 10/8/1996 | | FAIL |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 10/8/1996 | | 10/8/1996 | | PASS |
|
|
|
PACKAGE #2 Package #2 approved by reviewing agencies. MO
|
Routing - PUBLIC WORKS | 10/2/1996 | | 10/7/1996 | | PASS |
|
|
|
PACKAGE #2
|
Telephone call | | | 10/2/1996 | | FAIL |
|
|
|
Call put in to Jim Otradosky re: smoke testing. left message. MO
|
Routing - PUBLIC WORKS | 9/6/1996 | | 9/20/1996 | | FAIL |
|
|
|
PACKAGE #2
|
Routing Off Site - STRUCTURAL | 8/28/1996 | | 9/16/1996 | | FAIL |
|
|
|
PACKAGE #3 SENT FOR OUTSIDE ENGINEERING TO CH2MHILL ATTEN. CRAIG BARRET OR MARK BOWEN. VIA PDQ. RECEIVED STRUCTRUAL CORRECTIONS FROM H. HENRIKSON OF CH2M HILL 9-16-96 MO.
|
Routing - ELECTRICAL | 9/10/1996 | | 9/11/1996 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 9/11/1996 | | 9/11/1996 | | PEND |
|
|
|
STORED BEHIND BOB'S DESK. Plans assigned to MO 09-11-96.
|
Routing - PLUMBING | 9/6/1996 | | 9/10/1996 | | FAIL |
|
|
|
PACKAGE#1 LEE RICE TURNED DOWN. REQUESTED TWO EJECTOR PUMPS IN BASEMENT.
|
Routing - MECHANICAL | 8/28/1996 | | 9/6/1996 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 8/28/1996 | | 9/6/1996 | | PASS |
|
|
|
PACKAGE #2 X-ref: CU-29-96 & DR-47-96. Approved by RC & MS.
|
Plan routing begun/NEW & ADDTN | | | 8/28/1996 | | PASS |
|
|
|
|
Received Certificate of Value | | | 8/28/1996 | | PASS |
|
|
|
|
Application received | | | 8/28/1996 | | |
|
|
|
|
Gay Receipt For Partial Pay | | | 8/28/1996 | | PEND |
|
|
|
|