CHANGE STATUS TO (D) | | | 2/24/1997 | | |
|
|
|
|
INSP - Letter of compliance | 2/19/1997 | 2/19/1997 | 2/19/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - c/c #12041
|
INSP - Final | 2/19/1997 | 2/19/1997 | 2/19/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final
|
INSP - Letter of compliance | 2/19/1997 | 2/19/1997 | 2/19/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - c/c #12041
|
INSP - Final | 2/18/1997 | 2/18/1997 | 2/18/1997 | P | FAIL |
Alan Hauser
|
|
|
02/18/97 350 - still need electrical final, everything else ok
|
INSP - Energy code compliance | 12/5/1996 | 12/5/1996 | 12/5/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - insulation ok, ok to cover
|
INSP - Framing/Rough-in | 12/4/1996 | 12/5/1996 | 12/5/1996 | A | PASS |
Alan Hauser
|
|
|
12/05/96 350 - FRAME REINSPECT frame ok
|
INSP - Framing/Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PART |
Alan Hauser
|
|
|
12/02/96 350 - CORRECTIONS ON FRAME, OK TO INSULATE, WILL CHECK FRAME CO
|
INSP - Framing/Rough-in | 11/25/1996 | 11/26/1996 | 11/26/1996 | A | FAIL |
Alan Hauser
|
|
|
11/26/96 350 - NO ADDRESS POSTED, NO MECH. OR PBLG. APPROVED
|
INSP - Footings | 10/8/1996 | 10/9/1996 | 10/9/1996 | P | PASS |
Alan Hauser
|
|
|
10/09/96 350 - CHECK ENGINEERED FOOTING... TALKED WITH CONCRETE MAN HE HAS PICTURES OF THE STEEL IN PADS FOR COLUMN PADS ARE POURED BUT WHERE STILL EXPOSED
|
INSP - Conference | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - PICKED UP APPROVED PLANS, WENT BY JOB SITE TO LOOK AT TWO RE GARAGE AREA. MEET BRIAN, HE SAID THEY ARE THERE, I CAN'T SEE THEM ASKED EXPOSE THEM FOR INSPECTION. HE SAID HAD MEETING AND WOULD DO IT LATER. A HIM TO CALL ME FOR
|
Issue PAID IN FULL permit | | | 10/1/1996 | | |
|
|
|
|
INSP - Footings | 9/26/1996 | 9/27/1996 | 9/27/1996 | A | PASS |
Alan Hauser
|
|
|
09/27/96 350 - LATE A.M. WENT BY AND TALKED TO CONCRETE PEOPLE ABOUT PAD STEEL BEAM IN GARAGE FOOTINGS OK, TWO BARS OF #4 IN FTNS
|
Plan resubmittals received | | | 9/24/1996 | | PASS |
|
|
|
RECIEVED THREE PAGES REVIEWED AND ACCEPTED THEM INTO THE APPROVED PLANS ON FILE
|
Plan assigned to (338) | 9/10/1996 | | 9/19/1996 | | PASS |
|
|
|
692 09/19/96 07:38:09 338 - this action updated by action script from <<>> in Case No. BLD96-2359
|
Telephone call | | | 9/19/1996 | | PASS |
|
|
|
CALLED SANDY THEY WILL BE IN TO PICK IT UP.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/1996 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/19/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/19/1996 | | |
|
|
|
|
Routing - PLAN CHECK | 9/18/1996 | | 9/18/1996 | | PASS |
|
|
|
|
Routing - FRONT DESK | 9/18/1996 | | 9/18/1996 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/16/1996 | | |
|
|
|
|
Routing - PLANNING | 9/6/1996 | | 9/11/1996 | | PASS |
|
|
|
Approved by MGH.
|
Routing - PUBLIC WORKS | 9/5/1996 | | 9/6/1996 | | PASS |
|
|
|
|
Application received | | | 9/5/1996 | | |
|
|
|
|