INSP - Letter of compliance | | | 7/17/1997 | | PASS |
|
|
|
Letter of Compliance #13537 issued 7-17-97 by Monica.
|
CHANGE STATUS TO (D) | | | 5/21/1997 | | |
|
|
|
|
INSP - Final | 5/15/1997 | 5/15/1997 | 5/15/1997 | P | PASS |
Carl Dependahl
|
|
|
05/15/97 340 - TIM BASHFORD - ###-#### - BUILDING 1-
|
INSP - Final | 5/13/1997 | 5/14/1997 | 5/14/1997 | P | NR |
Carl Dependahl
|
|
|
05/14/97 340 - NR
|
INSP - Final | 12/18/1996 | 12/19/1996 | 12/19/1996 | P | FAIL |
Carl Dependahl
|
|
|
12/19/96 340 - NEED ELEC SIG. FOR C/O
|
INSP - Final | 11/25/1996 | 11/26/1996 | 11/26/1996 | A | PASS |
Joe Tawney
|
|
|
11/26/96 406 - TIM BASHFORD - ###-#### OK ON FINAL INSP
|
INSP - Framing/Rough-in | 11/21/1996 | 11/21/1996 | 11/21/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - NEED ELEC OK FOR SURROUNDING AREA, TOM G. MEETING W/ CONT & TODAY...CLG SEISMIC OK
|
INSP - Conference | 11/21/1996 | 11/21/1996 | 11/21/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W TIM BASHFORD PROJ. MGR RE SIGN OFF REQ'S
|
INSP - Framing/Rough-in | 11/18/1996 | 11/19/1996 | 11/20/1996 | P | CANC |
Carl Dependahl
|
|
|
11/18/96 340 - TIM BASHFORD - ###-####
|
INSP - Ceiling grid | 10/28/1996 | 10/29/1996 | 10/29/1996 | P | PART |
Carl Dependahl
|
|
|
10/29/96 340 - TIM BASHFORD - ###-####....PART, NEED COMPLETE SEISMIC
|
Issue PAID IN FULL permit | | | 9/12/1996 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/1996 | | PASS |
|
|
|
Plans approved as noted and per attached plan review correction list.
|
Routing - PLAN CHECK | 8/28/1996 | | 9/11/1996 | | PASS |
|
|
|
Submitted as a twenty four hour permit. required engineering for structural support being installed in attic space for mechanical unit. Received engineering 09/03/96. 09/06/96- Review of engineering revealed diference between calc design & Sheet S-1 details of plan. Craig Barrett will not be in until Monday to review. Plans on hold. 09/11/96 - Received clarification design details from Craig Barrett matching engineering details to sheet S-1 details.
|
Plan assigned to (DRS) | 8/28/1996 | | 9/11/1996 | | PASS |
Dan Stuart
|
|
|
09/06/96 Engineering design calcs submitted from Craig Barrett, structural engineer, were different than details on plans. Plans put on hold until at least Monday the 9th. 09/11/96 Received engineering calcs showing the same information as presented on the submitted structural sheet. Ready to process plans for building permit.
|
Inspection Record Card- Bld | | | 9/11/1996 | | |
|
|
|
|
Print Occupancy Form | | | 9/11/1996 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/6/1996 | | |
|
|
|
Plans were ready ti issue for permit except for engineering calc design review. Review of engineering design calcs revealed a discrepency between plan sheet S-1 & engineering design calcs. I removed the note that I was taking the plans to the front desk today.
|
Telephone call | | | 9/6/1996 | | |
|
|
|
Called Sam Burrows to let him know of differences on structural sheet & Engineers design calcs and that it would be next Monday, 9/9/96 or later before the permit could be issued. He agreed this is best.
|
Telephone call | | | 9/6/1996 | | |
|
|
|
Called Craig Barrett at CH2MHILL to review dwsign calc details that appear to be different than those drawn on plan. Craig not in so I talked to Heidi Carlson who had done some of the structural review for the design. She reviewed details I had question on and we decided to wait until Monday, 09/09/96 when Craig is back to proceed with discussions.
|
Print Pending Permit.LaserJet4 | | | 9/6/1996 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/5/1996 | | |
|
|
|
Received engineering on 09/03/96
|
Application received | | | 8/27/1996 | | |
|
|
|
|
Telephone call | | | 8/24/1996 | | |
|
|
|
Phone call to Sam Burrows requesting structural design calcs. Special Inspection required for high strength bolts & welding.
|
Plan resubmittals requested | | | 8/24/1996 | | |
|
|
|
Requested structural design calcs for mechanical unit & catwalk support system from Sam Burrows, Architect.
|