INSP - Final | 1/12/1998 | 1/12/1998 | 1/12/1998 | A | PASS |
|
|
|
c/c issued # 015503
|
INSP - Letter of compliance | 1/12/1998 | 1/12/1998 | 1/12/1998 | A | PASS |
|
|
|
# 015503
|
Routing for occupancy | 12/15/1997 | | 12/12/1997 | | PASS |
|
|
|
Final signed by: Carol A. Montgomery DR-92-95, CU-46-95. Hold bond for Micro Path as per H. Wayne Gibbs.
|
INSP-Final Inspection | 8/26/1997 | 8/26/1997 | 8/26/1997 | | PASS |
|
|
|
REINSP FOR FINAL OK FOR CERT OF COMPL
|
INSP - Final | 7/31/1997 | 8/1/1997 | 8/1/1997 | A | PASS |
|
|
|
08/01/97 338 - made ok with othwer agencies blessing confirred with cath same
|
INSP - Temporary occupancy | 7/22/1997 | 7/22/1997 | 7/22/1997 | P | NR |
Tom Arcoraci
|
|
|
07/22/97 408 -
|
INSP-Final Inspection | 7/7/1997 | 7/7/1997 | 7/7/1997 | | PART |
|
|
|
REINSP FOR FINAL OK FOR TEMP ON SHELL
|
INSP - Temporary occupancy | 6/17/1997 | 6/17/1997 | 6/18/1997 | P | FAIL |
Joe Tawney
|
|
|
06/17/97 406 - FINAL FAIL EMERG LIGHTS
|
INSP - Partial final | 6/17/1997 | 6/17/1997 | 6/17/1997 | P | NR |
|
|
|
06/17/97 338 - PARTIAL FOR TEMP.OCC. OTH-OTHER AGENCIES NOT APPROVED
|
Routing for occupancy | 6/10/1997 | 6/12/1997 | 6/12/1997 | | PASS |
|
|
|
Landscaping, extruded curbing; sprinkler sys; asphalt bonded by McAlvain $68,242./Micro Path bonded by Roundtree Chev $16,151.
|
Print Occupancy Form | | | 6/11/1997 | | |
|
|
|
|
Print Occupancy Form | | | 6/11/1997 | | |
|
|
|
|
INSP - Framing/Rough-in | 5/16/1997 | 5/16/1997 | 5/16/1997 | P | PASS |
|
|
|
05/16/97 338 - RECALL upper lobby tunnel ceiling
|
INSP - Framing/Rough-in | 5/15/1997 | 5/15/1997 | 5/15/1997 | P | FAIL |
|
|
|
05/15/97 338 - no one on site knew what to inspect must recall left verb
|
INSP - Framing/Rough-in | 5/7/1997 | 5/7/1997 | 5/6/1997 | P | PASS |
|
|
|
05/07/97 333 - exterior frame reinspect FRAM-OK FRAMING
|
INSP - Conference | 3/14/1997 | 3/14/1997 | 3/13/1997 | A | PART |
|
|
|
03/14/97 338 - on the ceiling height of a mezzaning
|
INSP - Footings | 2/10/1997 | 2/11/1997 | 2/11/1997 | A | PART |
Carl Dependahl
|
|
|
02/11/97 340 - FOOTING COLUMNS....NEED SPEC INSP'S REPORT
|
INSP - Footings | 2/3/1997 | 2/4/1997 | 2/4/1997 | A | PASS |
|
|
|
02/04/97 338 - r-bar placed spec insp made ok weather pro in place
|
Plan assigned to (JCM) | 9/20/1996 | | 1/28/1997 | | PASS |
John Menard
|
|
|
|
Telephone call | | | 1/28/1997 | | |
|
|
|
left message with receptionist that permit was ready
|
Issue PAID IN FULL permit | | | 1/28/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/1997 | | PASS |
|
|
|
|
Print Occupancy Form | | | 1/28/1997 | | |
|
|
|
|
Plan resubmittals received | | | 1/27/1997 | | PASS |
|
|
|
PLAN RESUBMITTALS REQUESTED FOR THE PRE-ENGINEERED PORTION OF THIS BUILDING WERE RECEIVED AND APPROVED ON 01/27/97. JCM
|
Plan resubmittals requested | | | 1/24/1997 | | PEND |
|
|
|
RESUBMITTAL OF REQUIRED REVISIONS TO PRE-ENGINEERED BUILDING PLANS FAXED TO ARCHITECT.JCM
|
Plan resubmittals received | | | 1/23/1997 | | PASS |
|
|
|
REQUESTED STRUCTURAL REVISIONS REQUIRED BY CH2MHILL WERE RECEIVED AND APPROVED ON 01/23/97. JCM
|
Plan resubmittals requested | | | 1/21/1997 | | PEND |
|
|
|
CORRECTIONS TO PRE-ENGINEERED BUILDING PLANS, REQUESTED BY CH2MHILL WERE FAXED TO THE ARCHITECT ON 01/21/97.
|
Routing Off Site - STRUCTURAL | 1/16/1997 | | 1/21/1997 | | PASS |
|
|
|
STRUCTURAL CALCULATIONS AND PLANS FOR THE PRE-ENGINEERED METAL BUILDING SENT OUT TO CH2MHILL VIA PDQ. ENGINGEERING REVIEW RECEIVED. KMM 01-21-97 CORRECTION LIST RECEIVED FROM ENGINEERING FIRM; FAX SENT TO ARCHITECT REQUESTING REQUIRED STRUCTURAL REVISIONS.
|
Plans ACCEPTED BY PLAN CHECK | | | 1/16/1997 | | PASS |
|
|
|
structural calculation and plans for the pre-engineered metal bldg.
|
90 day tracking............. | | 9/13/1996 | 12/12/1996 | | |
|
|
|
|
Plan resubmittals received | | | 10/30/1996 | | HOLD |
|
|
|
THIS PERMIT IS BEING HELP PENDING SUBMITTAL AND APPROVAL OF THE PRE-ENGINEERED METAL BUILDING PLANS.
|
Routing Off Site - STRUCTURAL | 10/25/1996 | | 10/29/1996 | | |
|
|
|
PACKAGE #3 CALLED PDQ TO SEND PLANS OUT TO CH2MHILL ATTEN CRAIG BARRETT OR MARK BOWEN.
|
Routing - PLAN CHECK | 10/22/1996 | | 10/25/1996 | | |
|
|
|
package #3
|
Plan resubmittals requested | | | 10/25/1996 | | PEND |
|
|
|
ADDITIONAL CORRECTIONS REQUIRED FOR THE RESUBMITTED PLANS, CORRECTION LIST SENT TO BRUCE POE AS CSHQA.
|
Routing Off Site - A.C.H.D | 9/17/1996 | | 10/22/1996 | | FAIL |
|
|
|
PACKAGE #4 A-508-96 CONTACTED JERRY LOWE AT ###-#### TO TAKE PLANS TO ACHD FEES NOT PAID. THEY ARE UNDER NEGOTIATIONS. KMM 10-22-96
|
Plan resubmittals received | | | 10/21/1996 | | PEND |
|
|
|
PLANS RETURNED BY CSHQA WITH REQUIRED ARCHITECTS STAMP.
|
Routing - PLANNING | 10/9/1996 | | 10/18/1996 | | PASS |
|
|
|
PACKAGE #2 A-508-96
|
Routing - FIRE | 10/15/1996 | | 10/18/1996 | | PASS |
|
|
|
PACKAGE #1 A-508-96 PER BOB GARRISON'S INSTRUCTION. KMM 10-15-96
|
Plan resubmittals received | | | 10/17/1996 | | FAIL |
|
|
|
RESUBMITTED PLANS NOT SIGNED AND SEALED BY THE ARCHITECT OF RECORD. ARCHITECT CONTACTED BY TELEPHONE 10/21/96.
|
Routing Off Site - STRUCTURAL | 9/17/1996 | | 10/15/1996 | | |
|
|
|
PACKAGE #3 A-508-96 PLANS TAKEN TO CH2MHILL ATTEN. CRAIG BARRETT OR MARK BOWEN VIA PDQ FOR OUTSIDE ENGINEERING. TO JOHN MENARD. KMM 10-15-96
|
Routing - ELECTRICAL | 10/8/1996 | | 10/14/1996 | | PASS |
|
|
|
PACKAGE #1 DRAWINGS NOT COMPLETE, FAILED IN ELEC. HOWEVER WILL FIELD VERIFY.
|
Routing - PUBLIC WORKS | 9/17/1996 | | 10/9/1996 | | PASS |
|
|
|
PACKAGE #2 PC#508-96
|
Plan resubmittals requested | | | 10/4/1996 | | PEND |
|
|
|
BRUCE POE PICKED UP CORRECTION LIST FOR ARCHITECT OF RECORD.
|
Routing - PLUMBING | 9/25/1996 | | 9/30/1996 | | PASS |
|
|
|
PACKAGE #2 A-508-96
|
Routing - MECHANICAL | 9/17/1996 | | 9/25/1996 | | PASS |
|
|
|
PACKAGE #1 A-508-96
|
Plan routing begun/NEW & ADDTN | | | 9/17/1996 | | PASS |
|
|
|
|
Application received | | | 9/13/1996 | | |
|
|
|
|
Gay Receipt For Partial Pay | | | 9/13/1996 | | |
|
|
|
|
Received Certificate of Value | | | 9/13/1996 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/15/1996 | | | | PEND |
|
|
|
PACKAGE #3
|
Routing - PLAN CHECK | 10/21/1996 | | | | PEND |
|
|
|
|
Routing - PLAN CHECK | 10/18/1996 | | | | PEND |
|
|
|
|
Routing - PLAN CHECK | 10/14/1996 | | | | PEND |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 9/30/1996 | | | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/21/1997 | | | | |
|
|
|
PACKAGE #3
|