Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD96-02495
StatusFinaled
Name IN-SYSTEM DESIGN
Site Address 12426 W EXPLORER DR
Project NameBRIGHTON BLDG
Customer Number 
ePlanReviewNo
Description
To construct interior partitions, suspended ceiling, floor covering, wall finishes as needed to prepare for the NEW TENANT in this 8567sf empty shell area of the the building per attached plans. This improvement will form an office, lab, break room, conference room, a reception area and an area containing two rest rooms, mechanical room, copy room and a hallway. A new Exit Door is to be installed in the exterior wall of this area per approved Plan. This building is fully fire sprinklered for area increase. A NEW CERTIFICATE OF OCCUPANCY WILL BE REQUIRED FOR THIS TENANT. PLAN CHECK # 521-96. PRP, A PARTIAL PERMIT WAS ISSUED 9/20/96 BY MYS.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 1/17/19971/17/1997 DONE
Details
INSP - Permanent occupancy  1/17/1997 PASS
Perm. Occ. Cert. #6770 issued 1-17-97 to In-System Design in the Brighton Bldg.
INSP - Final1/13/19971/14/19971/14/1997APART
DetailsJim Sly
01/14/97 316 - Temp Occ. .....needs perm for elect.
INSP - Final1/14/19971/14/19971/14/1997 PASS
FINAL OK FOR PERM OCC
INSP - Final12/17/199612/17/199612/17/1996 PASS
DetailsJoe Tawney
12/17/96 406 - OK FOR TEMP OCC STILL NEED TO RESOLVE EXIT DOOR SWING ISSUE
INSP - Final12/17/199612/17/199612/17/1996 FAIL
DetailsJim Sly
12/16/96 316 - C/N ...No framing insp completed, no approved plans on si inspecton.
INSP - Final12/16/199612/17/199612/17/1996PFAIL
DetailsJim Sly
12/17/96 316 - C/N Need approved plans and framing insp.
90 day tracking............. 9/18/199612/17/1996 PEND
INSP - Final12/3/199612/3/199612/3/1996PFAIL
DetailsJoe Tawney
12/03/96 406 - early pm FAILED SPKLR SYST ANNUAL INSP EXIT SIGN MOUNT FIRE EXT CHECK EXIT DOOR SWING WITH ARCH
INSP - Ceiling grid12/3/199612/3/199612/3/1996PPASS
DetailsJim Sly
12/03/96 316 - OK.
INSP-Sprinkler Rough-in/Hydro12/2/199612/2/199612/2/1996PPASS
DetailsJoe Tawney
12/02/96 406 - RANDY - ###-#### spklr rough-in OK TO COVER
Issue PAID IN FULL permit  10/30/1996
Inspection Record Card- Bld  10/25/1996
Print Occupancy Form  10/25/1996
Telephone call  10/25/1996
CALLED STEED..SECRETARY SAID THEY WOULD PICK UP ON THE 28TH
Plan Reviewer's activity  10/24/1996 PASS
reviewed resubs and approve. input to tidemark.
PLANS/APPL TAKEN TO FRONT DESK  10/24/1996 PASS
ISSUE
Print Pending Permit.LaserJet4  10/24/1996 PASS
ISSUE
Plan resubmittals received  10/24/1996
Plan assigned to (PRP)9/19/1996 10/24/1996 PASS
Details
10/24/96 15:17:16 PRP - this action updated by action script from <<>> in Case No. BLD96-2495
Plan resubmittals received  10/23/1996
Plan Reviewer's activity  10/21/1996 PEMD
reviewed plans, did Plan analysist review, correction list, fax to Arch, forward to fire Dept.
Plan resubmittals requested  10/21/1996
INSP - Framing/Rough-in10/15/199610/15/199610/15/1996 FAIL
DetailsJim Sly
/ / 316 - C/N
Plan resubmittals received  10/15/1996
INSP - Framing/Rough-in10/14/199610/14/199610/14/1996PNR
DetailsCarl Dependahl
10/14/96 340 - 316 AREA, NEED C/N ONSITE; WILL CALL SLY
Routing - FIRE9/30/1996 10/1/1996 PASS
Plan resubmittals requested  9/30/1996
Plan Reviewer's activity  9/30/1996 PEND
PRELIMINARY REVIEW-REQUESTED INFO BEFORE REVIEW.
Routing - PLAN CHECK9/20/1996 9/30/1996 PEND
Routing - PUBLIC WORKS9/19/1996 9/20/1996 PASS
Plan Reviewer's activity  9/20/1996
ISSUED A PARTIAL PERMIT ON 9/20/96.
Issue FEE-DUE permit  9/20/1996
Issue FEE-DUE permit  9/20/1996
Plan routing begun/TENANTS  9/19/1996
Route to Public Works then back to Plan Check. After Plan Check route to Fire Department.
Recd Pcfee & Taken To Pln CK  9/18/1996 PEND
Gay Receipt For Partial Pay  9/18/1996 PEND
Application received  9/18/1996
Routing - PLAN CHECK10/1/1996   PEND