DOC - Permit Finaled | 1/18/2001 | 1/18/2001 | 1/18/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 1/18/2001 4:08:24 PM
|
DOC - L/C Approved | 1/21/1999 | | 1/21/1999 | | PASS |
|
|
|
aging sheet update l/c issued 05/12/98
|
(F) Reprint permit | | | 8/31/1998 | | PASS |
|
|
|
|
INSP - Final | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | PASS |
|
|
|
05/12/98 338 - made ok signed the occ req card perm col and issued l/c
|
INSP-Final Inspection | 9/17/1997 | 9/17/1997 | 9/17/1997 | P | FAIL |
Joe Tawney
|
|
|
09/17/97 406 - REISP FOR FINAL ON SHELL FAIL KNOX BOX
|
Temporary occupancy | | | 8/21/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3452 issued 8-21-97 to Black Eagle Center Bldg. #1.
|
INSP - Final | 6/10/1997 | 6/10/1997 | 6/10/1997 | P | PART |
Joe Tawney
|
|
|
06/10/97 406 - BLACKEAGLE CENTER REINSP FOR FINAL OK FOR TEMP ON SHELL
|
INSP-Final Inspection | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | NR |
Joe Tawney
|
|
|
06/05/97 406 - NOT READY ADDRESS GONE FROM BLDG FACING MAPLE GROVE WATER ALARM SYSTEM INDICATING TROUBLE
|
INSP - Conference | 5/29/1997 | 5/29/1997 | 5/29/1997 | | PASS |
|
|
|
/ / 338 - with plan review on # of buildinge and the subdivision app r addressing
|
INSP-Final Inspection | 5/29/1997 | 5/29/1997 | 5/29/1997 | P | FAIL |
Joe Tawney
|
|
|
05/29/97 406 - REINSP FOR FINAL FAILED PROBLEM WITH SPKLR SYSTEM
|
INSP-Sprinkler Rough-in/Hydro | 5/27/1997 | 5/28/1997 | 5/28/1997 | A | NR |
Joe Tawney
|
|
|
05/28/97 406 - REINSPECTION NOT READY DACT NOT CONECTED
|
INSP-Final Inspection | 5/27/1997 | 5/28/1997 | 5/28/1997 | A | FAIL |
Joe Tawney
|
|
|
05/28/97 406 - FAIL SPKLR SUPRV NOT COMPLETE ADDRESS FD ACCESS SPKLR ROO BOLLARDS AROUND GAS METER FINISH LANDINGS AT DOORS
|
INSP-Sprinkler Rough-in/Hydro | 5/27/1997 | 5/27/1997 | 5/27/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST OF SINGLE WP SYSTEM
|
INSP - Temporary occupancy | 5/23/1997 | 5/23/1997 | 5/23/1997 | P | NR |
|
|
|
05/23/97 338 - late p.m. OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Sprinkler Rough-in/Hydro | 4/4/1997 | 4/7/1997 | 4/7/1997 | A | NR |
Joe Tawney
|
|
|
04/07/97 406 - HYDRO TEST 8:30 AM NOT READY LEAKS
|
INSP-Sprinkler Rough-in/Hydro | 4/4/1997 | 4/4/1997 | 4/4/1997 | | NR |
|
|
|
HYDRO TEST NR FOUND SOME LEAKS
|
INSP-Supply line flush | 3/21/1997 | 3/21/1997 | 3/21/1997 | | PART |
|
|
|
UNDERGROUND FLUSH OK WATER PRESSURE 10 PSI LOWER THAN STATIC SHOWN ON SPKLR PLANS ADV TO CONTACT WATER DEPT
|
INSP - Roof | 3/18/1997 | 3/18/1997 | 3/17/1997 | P | PASS |
|
|
|
03/18/97 338 - 2nd half MADE OK FOR THE 2ND 1/2 OF THE ROOF DECK
|
INSP - Carpentry | 3/6/1997 | 3/7/1997 | 3/5/1997 | P | PASS |
|
|
|
03/07/97 338 - CARPENTRY ON ROOF - SOUTH 1/2
|
INSP - Carpentry | 3/5/1997 | 3/6/1997 | 3/5/1997 | P | CANC |
|
|
|
03/06/97 338 - CONTRACTOR CALLED AND CANCELLED UNTIL FRIDAY.
|
INSP - Framing/ Rough-in | 3/5/1997 | 3/5/1997 | 3/5/1997 | | PASS |
|
|
|
/ / 338 - for the south 1/2 of the roof structure
|
INSP - Conference | 3/5/1997 | 3/5/1997 | 3/5/1997 | | PASS |
|
|
|
/ / 338 - recieved and approved resubmittals for the interior soffit t
|
INSP - Framing/ Rough-in | 3/3/1997 | 3/3/1997 | 3/3/1997 | | NR |
|
|
|
/ / 338 - nor ready for insp c/n issued for conference only
|
INSP - Framing/Rough-in | 2/28/1997 | 3/3/1997 | 3/3/1997 | A | PART |
|
|
|
03/03/97 338 - will complete 03-04-97 am # 1
|
90 day tracking............. | | 9/20/1996 | 12/19/1996 | | |
|
|
|
|
INSP - Flatwork | 12/11/1996 | 12/12/1996 | 12/12/1996 | A | PASS |
|
|
|
12/12/96 338 - STEEL FOR SLAB & TILT UP WALL PANELS special insp made ok ok
|
INSP - Flatwork | 12/5/1996 | 12/6/1996 | 12/6/1996 | A | PASS |
|
|
|
12/06/96 338 - TILT UP WALL PANELS..ETC. made ok sp, insp ok
|
INSP - Footings | 12/5/1996 | 12/5/1996 | 12/5/1996 | P | PASS |
|
|
|
12/05/96 338 - interior footings. special insp made ok
|
INSP - Wall cover | 12/4/1996 | 12/5/1996 | 12/5/1996 | A | CANC |
|
|
|
12/05/96 338 - contractor cancelled this request. not ready
|
INSP - Footings | 12/3/1996 | 12/3/1996 | 12/3/1996 | P | |
|
|
|
|
INSP - Framing/Rough-in | 11/27/1996 | 12/2/1996 | 12/2/1996 | A | PASS |
|
|
|
12/01/96 338 - steel inspection-concrete at 9:30 no access spec insp ma
|
INSP - Flatwork | 11/19/1996 | 11/21/1996 | 11/21/1996 | A | PASS |
|
|
|
11/21/96 338 - made ok special insp completed 10000 s.f. poured w/o cit
|
(F) Reprint permit | | | 11/19/1996 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/18/1996 | | |
|
|
|
|
(F) Reprint permit | | | 11/18/1996 | | |
|
|
|
|
Print Occupancy Form | | | 11/15/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/15/1996 | | |
|
|
|
|
Telephone call | | | 11/15/1996 | | |
|
|
|
TOLD LYNNE PERMIT READY
|
Plan assigned to (M_O) | 10/9/1996 | | 11/14/1996 | | PASS |
|
|
|
|
Routing - PLANNING | 10/9/1996 | | 11/14/1996 | | PASS |
|
|
|
PACKAGE #2 X-REF: DR-55-96. Approved by SR.
|
Print Pending Permit.LaserJet4 | | | 11/14/1996 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/1996 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/23/1996 | | 10/23/1996 | | PASS |
|
|
|
PACKAGE #3 CONTACTE PDQ TO TAKE PLANS OUT TO CH2MHILL ATTEN. CRAIG BARRETT OR MARK BOWEN. KMM 9-23-96
|
Routing - FIRE | 10/11/1996 | | 10/16/1996 | | PASS |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | | | 10/11/1996 | | FAIL |
|
|
|
corrections mailed and faxed to architect 10-11-96 MO.
|
Plan Reviewer's activity | | | 10/11/1996 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MO
|
Plan Reviewer's activity | | | 10/9/1996 | | |
|
|
|
PLANS RECEIVED FOR REVIEW 10-09-96. MO
|
Routing - PUBLIC WORKS | 9/23/1996 | | 10/9/1996 | | PASS |
|
|
|
PACKAGE #2
|
Routing Off Site - A.C.H.D | 9/23/1996 | | 10/9/1996 | | PASS |
|
|
|
PACKAGE #4 CONTACTED CORNEL LARSON AT ###-#### TO TAKE PLANS OUT TO ACHD. KMM 9-23-96
|
Routing - ELECTRICAL | 10/2/1996 | | 10/9/1996 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLUMBING | 9/30/1996 | | 10/2/1996 | | PASS |
|
|
|
PACKAGE #1
|
Routing - MECHANICAL | 9/23/1996 | | 9/30/1996 | | PASS |
|
|
|
PACKAGE #1
|
Plan routing begun/NEW & ADDTN | | | 9/23/1996 | | PASS |
|
|
|
|
Gay Receipt For Partial Pay | | | 9/20/1996 | | |
|
|
|
|
Received Certificate of Value | | | 9/20/1996 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/20/1996 | | |
|
|
|
|
Application received | | | 9/20/1996 | | |
|
|
|
|