Permit Information
Permit NumberBLD96-02580
StatusFinaled
Name FIDELITY FUNDING
Site Address 554 N STEELHEAD WAY Unit: 134
Project NameEMERALD CORP PARK #4
Customer Number 
ePlanReviewNo
Description
PARTIAL PERMIT ISSUED 9/27/96:To create 2364 sq ft office space with break rm., conference rm., utility rm., and two accessible restrooms. Work to include approximately 144 lf. of 1-hr tenant demising wall and 125 lf. of non-rated partions. The installation of suspended ceiling system. The removal of existing window to install one egress door. All work to be done per approved plans on file. Note: This building is fully fire sprinklered. Any relocation of fire sprinklers are required to comply with NFPA 13 as requlated by the Boise City fire department. PC538-96(RMH)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 12/2/199612/2/1996 DONE
Details
INSP - Permanent occupancy  12/2/1996 PASS
Perm. Occ. Cert. #6725 issued 12-2-96 to Fidelity Funding in the Emerald Corp. Park #4.
INSP-Conference11/25/199611/26/199611/27/1996ACANC
DetailsJoe Tawney
suite 134
INSP - Final11/26/199611/26/199611/26/1996APASS
DetailsJoe Tawney
OK FOR PERM OCC
INSP - Final11/25/199611/26/199611/26/1996PPASS
Details
11/26/96 338 -
INSP - Framing/Rough-in10/29/199610/30/199610/29/1996PPASS
Details
10/30/96 338 - MADEOK OK TO COVER AFTER THE PLMG IS SIGNED OFF
Inspection Record Card- Bld  10/8/1996
Print Occupancy Form  10/8/1996
PLANS/APPL TAKEN TO FRONT DESK  10/8/1996 PASS
Print Pending Permit.LaserJet4  10/8/1996 PASS
Plan assigned to (R_H)9/27/1996 10/8/1996 PASS
Details
10/08/96 10:00:35 R_H - this action updated by action script from <<>> in Case No. BLD96-2580
Routing - PLAN CHECK9/30/1996 10/7/1996 PEND
Routing - FIRE10/7/1996 10/7/1996 PASS
Plan Reviewer's activity  10/1/1996 PEND
Started plan review
Routing - PUBLIC WORKS9/27/1996 9/30/1996 PASS
Issue FEE-DUE permit  9/27/1996
Plan routing begun/TENANTS  9/27/1996
Route to Public Works then back to Plan Check. After Plan Check route to Fire Department.
Plan Reviewer's activity  9/27/1996
PREPARED AND ISSUED A PARTIAL PERMIT AT THE REQUEST OF THE CONTRACTOR (MARV MEYER).
Telephone call  9/27/1996
CALLED AND TOLD MARV PERMIT READY
Application received  9/26/1996
Gay Receipt For Partial Pay  9/26/1996 PEND
Recd Pcfee & Taken To Pln CK  9/26/1996 PEND
Routing - PLAN CHECK10/7/1996   PEND