Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD96-02600
StatusExpired
Name MICRON TECH
Site Address 8000 FEDERAL WAY
Project NameMIC #10B (CHEM STOR)
Customer Number 
ePlanReviewNo
Description
(PROJECT #1054)(MICRON BLD. 10B)(CHEMICAL STORAGE UPGRADE) CONSTRUCTON TO INCLUDE INCREASING THE RACK STORAGE HEIGHT IN ROOMS 106N, 106M AND 106K, ALSO REMODEL ROOMS 106C, 107D & 107E TO CREATE A NEW PHOTO RESIST COOLER ROOM 106C AND RELOCATED BATHROOM 107D. CONSTRUCTION TO INCLUDE A NEW ONE-HOUR WALL ON TOP OF A CONTAINMENT CURB AND INSTALL A NEW ONE-HOUR RATED DOUBLE DOOR, EXTEND CURB TO FLOOR DRAIN. COOLER IS CONSTRUCTED OF PREFAB PANELS SALVAGED FROM EXISTING COOLER IN BUILDING 10A. ALL AREAS ARE TO BE FULLY FIRE SPRINKLERED. ALL PER APPROVED PLANS ON FILE. PC #544-96
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  3/4/2003 DONE
Letter of Compliance #22830 issued 3-4-03.
BLD-Final2/13/20032/13/20032/13/2003APASS
DetailsJim Storey
BLD-Final1/31/20032/3/20032/3/2003PNR
DetailsJim Storey
ernie ###-#### ernie ###-#### missing bolts. 2/3/2003 6:03:57 PM
FIRE-Final Inspection1/31/20032/3/20032/3/2003PPASS
DetailsRick Jackson
ernie ###-####
CHANGE STATUS TO (ISS)  1/31/2003 DONE
per jim storey change status in get fn out
FIRE-Conference4/11/20024/11/20024/11/2002APART
DetailsRick Jackson
Added by Inspector: 409 On 4/11/2002 10:30:31 AM met with John Wheeler and the 4 inch foam proportioner was installed per changes of the clacl'd area. Foam system still requires the annual test; will not final this permit until the foam test has been completed and the system proves to work properly
Print Occupancy Form  7/13/2001 DONE
SUPER- Supervisor's review4/27/19994/27/19994/27/1999
this structure is completed specically to the approved plan. ok to issure letter of compliance when Jim Storey is ready
INSP - Final5/29/19986/2/19986/2/1998PNR
DetailsJim Storey
06/02/98 301 - c/n pending
INSP-Final Inspection3/27/19983/30/19983/30/1998APASS
DetailsRick Jackson
03/30/98 409 - ERNIE ###-#### OR CELL ###-#### occ approved
INSP - Final3/27/19983/30/19983/30/1998AFAIL
DetailsJim Storey
03/30/98 301 - ERNIE RICHARDSON ###-#### OR CELL ###-#### need sign offs
90 day tracking............. 9/30/199612/29/1996 PASS
Issue PAID IN FULL permit  12/20/1996
(F) Reprint permit  11/5/1996
PLANS/APPL TAKEN TO FRONT DESK  11/4/1996 PASS
Telephone call  11/4/1996
CALLED DAVE PERMIT READY
Print Occupancy Form  11/4/1996
Print Pending Permit.LaserJet4  11/4/1996 PASS
Inspection Record Card- Bld  11/4/1996
CHANGE STATUS TO (F)  11/1/1996
Routing - FIRE10/28/1996 10/29/1996 PASS
Routing - PLAN CHECK10/21/1996 10/28/1996 PEND
Plan resubmittals received  10/23/1996 PEND
SHEET G2.1
Routing - FIRE10/18/1996 10/21/1996 FAIL
Gay Receipt For Partial Pay  10/21/1996
Plan assigned to (RGG)9/30/1996 10/15/1996 PEND
SEE PC #544-96
Routing - PUBLIC WORKS9/30/1996 10/7/1996 PASS
Issue FEE-DUE permit  9/30/1996
Application received  9/30/1996
Plan routing begun/TENANTS  9/30/1996 PASS
Received Certificate of Value  9/30/1996 PASS
Routing - PLAN CHECK10/29/1996  
Routing - PLAN CHECK10/8/1996   PEND