Permit Information
Permit NumberBLD96-02645
StatusFinaled
Name RICH SEEWALD
Site Address 7621 W RYGATE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 1604 s.f. 1 story single family dwelling with a 697 s.f. attached garageall per the approved plans and attached conditions. ACHD # 97-0014 PR # 768 338
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (D)  4/18/1997 PASS
INSP - Letter of compliance4/10/19974/10/19974/10/1997 PASS
DetailsAlan Hauser
/ / 350 - c/c #13366
INSP - Letter of compliance4/10/19974/10/19974/10/1997 PASS
DetailsAlan Hauser
/ / 350 - c/c #13366
INSP - Final4/9/19974/10/19974/10/1997PPASS
DetailsAlan Hauser
04/10/97 350 - FINAL REINSPECT final
INSP - Final4/8/19974/9/19974/9/1997PFAIL
DetailsAlan Hauser
04/09/97 350 - no final, corrections posted with builder
INSP - Framing/Rough-in12/5/199612/6/199612/6/1996APASS
DetailsAlan Hauser
12/06/96 350 - FRAME OK, OK TO INSULATE
INSP - Energy code compliance12/6/199612/6/199612/6/1996PPASS
DetailsAlan Hauser
12/06/96 350 - INSULATION OK, OK TO COVER
Issue PAID IN FULL permit  10/17/1996
Inspection Record Card- Bld  10/17/1996
(F) Reprint permit  10/17/1996
Telephone call  10/11/1996
CALLED LEFT MESSAGE ON ANSWING MACHINE FOR RICH PLANS ARE READY
Inspection Record Card- Bld  10/11/1996
Print Pending Permit.LaserJet4  10/10/1996 PEND
Plan assigned to (338)10/9/1996 10/10/1996 PASS
PLAN CHECK #768 10/10/96 09:56:33 338 - this action updated by action script from <<>> in Case No. BLD96-2645
Plan routing begun/MISC  10/10/1996 PEND
BACK TO THE BUILDER FOR REPAIR
Telephone call  10/10/1996 PEND
called builder to get info. missing on the plans submitted. all header sizes not called out, safety notes in the garage missing, smoke detector locations are missing, there is 0 tolerance for the lot setbacks and I recomend that a surveyor set lines for the placement of the foundation walls. I am requesting that the builder pick up the plans and correct and add the correct notes.
PLANS/APPL TAKEN TO FRONT DESK  10/10/1996 PEND
TAKEN TO FRONT DESK FOR THE BUILDER TO PICK THEM BACK UP TO HAVE THE PROPER INFO ADDED
INSP - Foundation10/9/199610/9/199610/9/1996PPASS
DetailsAlan Hauser
10/09/96 350 - THIS IS AN EARLY START FOR FOOTINGS AND FOUNDATIONS-- NEV INSPECTION FTNS POURED SETBACKS OK 5 FT EACH SIDE WANTS IT AS LATE AS POSSIBLE
Plan assigned to (DJO)10/2/1996 10/9/1996 PEND
DetailsDan Overy
Routing - PLANNING10/7/1996 10/9/1996 PASS
Site plan not drawn accurately 5'minimum setback from side lot lines required. Aproved by MGH.
Routing - PUBLIC WORKS10/2/1996 10/4/1996 PASS
(F) Reprint permit  10/4/1996
Application received  10/2/1996
Routing - PLAN CHECK10/9/1996   PEND