Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD96-02661
StatusFinaled
Name 8TH STREET MARKETPLACE
Site Address 405 S 8TH ST
Project Name8TH ST MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(PHASE I) To upgrade the existing atrium to bring into compliance with 1994 UBC including a passive smoke control system per approved plans on file. Work includes installation of 20 minute door assemblies, 3/4 hr. rated glazing in basement window openings, 1-hr. rated wall infills in the basement, infill of openings exceeding the 25% area allowance with smoke barrier walls per Sec. 905.2.3 and a new stairway. (NOTE: Within 2 years of the date this permit is issued remodel is to take place so that all tenants on all floors to have 1 exit out other than through the atrium - see ltr. from M. Kennedy 7/18/96.) ACCEPTANCE AND ISSUANCE OF A CERTIFICATE OF OCCUPANCY IS NOT TO BE GRANTED UNTIL THE PASSIVE SMOKE CONTROL SYSTEM REPORT HAS BEEN FILED AND APPROVED BY THE BUILDING DEPARTMENT. Fire sprinklers substitute for 1-hr. construction. (P.C.#143-94/MYS)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/22/2008  
Letter of compliance  4/16/1998 PASS
Letter of Compliance #15019 issued 4-16-98.
INSP-Final Inspection2/25/19982/25/19982/25/1998PPASS
DetailsRick Jackson
atrium sprinklers gaurds/deflectors installled. full occ. approved
INSP-Final Inspection6/25/19976/25/19976/25/1997PPASS
Details
CHECK SPRINKLER BAFFLES design good, ok to proceed with installing. will verify with corridor improvement
INSP - Partial final6/6/19976/9/19976/9/1997ANH
Details
06/09/97 333 - PARTIAL TEMP.OCC. no one there
INSP-Final Inspection6/5/19976/6/19976/6/1997APART
Details
redesigning baffles on window sprinklers
INSP-Final Inspection6/3/19976/3/19976/3/1997PPART
Details
alarm test passed, waiting on sprinkler info
INSP-Final Inspection6/2/19976/2/19976/2/1997PFAIL
Details
alarms not tested, sprinklers used to sub for rated glass blocked by blinds, no info available on listing for sprinklers to be used in manner installed.
INSP - Conference4/8/19974/8/19974/7/1997PPASS
Details
04/08/97 333 - he will call you on cel and set up time for conf. talked about handrails
INSP-Sprinkler Rough-in/Hydro2/18/19972/18/19972/18/1997PPART
Details
atrium alarm system, dorr hold open smokes, and riser location reviewed
INSP - Carpentry2/14/19972/14/19972/14/1997PPASS
Details
02/14/97 333 - shear wall nailing SHRW-OK SHEARWALL NAILING
INSP - Conference2/11/19972/11/19972/11/1997 PASS
Details
/ / 333 - resubmittal ok
INSP - Conference1/9/19971/10/19971/10/1997APASS
Details
01/10/97 333 - 9:30 A.M
Issue PAID IN FULL permit  12/6/1996
Telephone call  12/3/1996
CALLED SKIP JONES/ NOT GOING TO START WORK UNTIL AFTER THE FIRST OF THE YEAR
Print Occupancy Form  11/14/1996
Inspection Record Card- Bld  11/14/1996
Telephone call  11/14/1996
LEFT MESSAGE WITH SKIP JONES
Plan assigned to (MYS)3/21/1996 11/13/1996
DetailsMarlene Southard
PLANS/APPL TAKEN TO FRONT DESK  11/13/1996 PASS
Plan Reviewer's activity  11/12/1996
11/12/96 - Received a copy of letter from William Stewart and his proposal for conducting the special inspection of the STC walls/openings for the passive smoke design. Responded to M. Kennedy by letter on 11/13/96 notifying her of additional information we need from Mr. Stewart prior to our acceptance of him as the special inspector.
Received Certificate of Value  11/12/1996
Routing - PLAN CHECK10/9/1996 11/5/1996 PEND
10/9/96 - Waiting for Fire Department resubmittals. Once approved by Fire Department we can issue permit.
Routing - FIRE11/5/1996 11/5/1996 PASS
Routing - FIRE10/3/1996 10/9/1996 FAIL
Plan routing begun/TENANTS  10/3/1996
Route to Fire Department then back to Plan Check for issuance.
Application received  3/21/1996