Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD96-02744
StatusFinaled
Name PARK POINTE CENTER II
Site Address 6151 N DISCOVERY WAY
Project NamePARK POINTE CNTR II
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW 33,OOO SQ. FT. II-N, FIRE SPRINKLERED SINGLE STORY TILT-UP SHELL ONLY OFFICE BUILDING. OTHER WORK INCLUDES ALL SITE IMPROVEMENTS, PAVING, LANDSCAPING AND TRASH ENCLOSURE. NO OCCUPANCY IS PERMITTED UNDER THIS PERMIT. SEPARATE PERMITS MUST BE OBTAINED FOR ALL TENANT IMPROVEMENTS. ALL WORK IS PER APPROVED PLANS AND ATTACHMENTS, DR#83-96, CU#42-96 AND PC#605-96. FIRE SPRINKLERS USED FOR AREA.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/29/2008 DONE
(F) Reprint permit  1/30/2008  
Case Summary (BLD)  1/24/2008 DONE
Case Summary (BLD)  1/22/2008 DONE
Letter of compliance  10/25/1999 DONE
Letter of Compliance #18162 issued 10-25-99.
BLD-Final10/13/199910/13/199910/13/1999APASS
DetailsJim Sly
Final on shell ofc. bldg.
PubWorks Occupancy Approval  10/13/1999  
Inspections done by Brian Murphy.
FIRE-Final Inspection10/8/199910/11/199910/11/1999APASS
DetailsJoe Tawney
dennis ###-#### reinsp ok for cert of completion
BLD-Final10/7/199910/8/199910/8/1999AFAIL
DetailsJim Sly
NEED REQ. SIGNATURES
FIRE-Final Inspection10/7/199910/8/199910/8/1999AFAIL
DetailsJoe Tawney
REINSPECTION FAIL ON DAMPER DETECTOR NOT INSTALLED
FIRE-Final Inspection10/7/199910/7/199910/7/1999PFAIL
DetailsJoe Tawney
DENNIS--- ###-#### FIRE FN reinsp fail
FIRE-Sprinkler Rough-in9/14/19999/15/19999/15/1999ACANC
DetailsJoe Tawney
R/I ALREADY SIGNED OFF
Code Occupancy Approval  8/31/1999
Final Occupancy requested by Dennis Potter ###-####
Receive PAYMENT IN FULL  7/12/1999
SUPER- Supervisor's review7/7/19997/7/19997/7/1999
jim sly is handeling work is slowly proceeding permit is to remain active
SUPER- Supervisor's review6/30/19996/30/19996/30/1999
jim sly will review case and reply to me by 2end week of july
SUPER- Supervisor's review6/24/19996/24/19996/24/1999
jim sly did job joe taweny has sprinkler problems, shell only minor interior stud framing unfinished. jim sly needs to follow up
SUPER- Supervisor's review6/18/19996/18/19996/18/1999
if i don't know i can't fix it. i have asked for cooperation on not answering calls or questions and routing them to me. i have not been notified of a problem on this job and i expect mr sly can fill us in on why its occupied without final.
(F) Reprint permit  3/19/1999
Fee Review-notes8/5/1998 11/16/1998 WORK
INSP - Final10/6/199810/6/199810/6/1998PFAIL
DetailsJim Sly
10/06/98 316 - C/N...Need appr plan, letter of appr from special insp an
INSP - Final10/6/199810/6/199810/6/1998 FAIL
DetailsJoe Tawney
/ / 406 - FINAL ON SHELL FAIL SPKLR ALARMS NO PLANS ON SITE FDC CONNEC
INSP-Sprinkler Rough-in/Hydro6/30/19987/1/19987/2/1998PPART
DetailsJoe Tawney
07/01/98 406 - Shelly ###-#### OK ON ABOVE GROUND HYDRO TEST AND ROUGH IN
INSP - Framing/Rough-in6/22/19986/22/19986/22/1998PPART
DetailsJim Sly
06/22/98 316 - Insp of framed ext. framework above roof...OK
INSP - Framing/Rough-in6/16/19986/17/19986/17/1998PPART
DetailsJim Sly
06/17/98 316 - FRAMING/ MECH ROOM/ OK
INSP-Sprinkler Rough-in/Hydro6/3/19986/3/19986/3/1998PPART
DetailsJoe Tawney
06/03/98 406 - 200 LB TEST/ ###-#### OK ON UNDERGROUND HYDRO TEST
INSP-Supply line flush5/22/19985/22/19985/22/1998PPASS
DetailsRick Jackson
###-#### underground flush pass
INSP - Concrete4/30/19985/1/19985/1/1998APART
DetailsJim Sly
05/01/98 316 - Walls pending special inspectors approval.
INSP - Concrete4/27/19984/27/19984/27/1998PPART
DetailsJim Sly
04/27/98 316 - Rebar in tilt panels..Pending special insp approval....
INSP - Foundation4/17/19984/17/19984/17/1998PPART
DetailsJim Sly
04/17/98 316 - Tilt up panels (4)....pending special insp approval.....
INSP - Foundation4/9/19984/9/19984/9/1998PPART
DetailsJim Sly
04/09/98 316 - footing West side...OK pending special insp approval...
INSP - Foundation4/2/19984/3/19984/3/1998ACANC
DetailsTom Arcoraci
04/03/98 408 - BRIAN WILL CALL YOU ABOUT THIS..###-#### done by 316
(F) Reprint permit  3/13/1998
Issue PAID IN FULL permit  3/12/1998
Meeting  2/27/1998 PASS
TALKED TO RANDY AT STEED WILL BE IN ON TUESDAY OR WEDNESDAY TO PICK UP
Telephone call  2/20/1998
CALLED AND TALKED TO RANDY STEED. TOLD HIM PLANS WILL BE VOIDED IF THEY DON'T PICK UP PLANS. MAILED LETTER OF EXPIREATION OF PLAN REVIEW.MPS TOLD HIM HE COULD HAVE A COUPLE OF DAYS TO GET BACK WITH ME.
Telephone call  2/20/1998 PEND
GRAIG GROVES CALLED WILL BE IN 2/27/98 OR WILL CALL US TO LET US KNOW.PE HE SHOULD GET FUNDS FROM BANK NEXT WEEK
Telephone call  7/23/1997
TALKED TO SCOTT AT STEED, TOLD HIM PERMIT NEEDS TO BE PICKED UP OR IT WILL BE VOIDED/ HE SAID OWNER HAS STALLED ON PROJECT, WILL LET ME KNOW,
180 day tracking............. 10/10/19964/8/1997 PEND
Inspection Record Card- Bld  3/24/1997
Telephone call  3/24/1997
PERMIT READY, FEE DUE/ BRING ACHD RECEIPT
Print Occupancy Form  3/24/1997
PLANS/APPL TAKEN TO FRONT DESK  3/21/1997 PASS
Received Certificate of Value  3/21/1997 PASS
Plan assigned to (M_O)11/5/1996 3/21/1997 PASS
Routing - ELECTRICAL3/18/1997 3/19/1997 PASS
Routing - ELECTRICAL2/21/1997 2/24/1997 FAIL
Routing - PLANNING1/15/1997 2/20/1997 PASS
X-REF: V-18-94,DR-134-94. APPROVED BY SR & TKW.
Plan resubmittals received  2/18/1997 PEND
Electrical plans submitted will need to be reviewed by ELEC.MO
90 day tracking............. 10/10/19961/8/1997 PEND
Routing Off Site - STRUCTURAL12/16/1996 12/24/1996 PASS
Routing - FIRE12/17/1996 12/17/1996 PASS
Plan Reviewer's activity  12/16/1996 FAIL
Plans for structural engineer as requested received 12/16 MO. NON-STRUCTURAL CORRECTIONS MAILED AND FAXED TO ARCHITECT. MO
Plan resubmittals received  12/16/1996
RECEIVED PLAN RESUBMITTALS FROM HABITEC ARCHITECTS FOR THE ENGINEERING CONSULTANT.
Routing - PUBLIC WORKS12/6/1996 12/13/1996 PASS
Telephone call  12/9/1996 FAIL
CALLED GORDON MCDONALD IN CA. FOR ADDITIONAL ARCHITECTURAL SHEETS AS REQUESTED BY ATTWOOD, HINZMAN, JONES FOR STRUCTURAL REVIEW. MO
Routing - PLUMBING11/26/1996 11/29/1996 PASS
Routing - PLANNING11/14/1996 11/25/1996 FAIL
X-ref: V-18-94 & DR-134-94. Need revised plans per DR conditions of approval. Reviewed by SR & TKW.
Plan Reviewer's activity  11/18/1996 FAIL
structral plans received from architect as requested forwared to consulting engineer for review. Elec sheets not provided as requested. Plans are in PW as of this date. MO
Routing - PUBLIC WORKS11/7/1996 11/13/1996 FAIL
REQUIRES DRAINAGE PLAN REVISION. BRIAN MURPHY KMM 11-14-96
Plan Reviewer's activity  11/5/1996
PLANS RECEIVED FOR REVIEW 11-05-96. MO.
Plan Reviewer's activity  11/5/1996 FAIL
PLAN SUBMITTAL IS INCOMPLETE. LETTER SENT TO ARCHITECT TO PROVIDE MISSING PLANS SO CIRCULATION CAN BEGIN. WILL SEND TO P.W. THIS IS NOT A PACKAGE PLAN. MO 11-05-96.
Routing Off Site - A.C.H.D10/11/1996 10/31/1996 PASS
CONTACTED HABITEC AT ###-#### TO TAKE PLANS OUT TO ACHD
Received Certificate of Value  10/11/1996 PASS
Plan routing begun/NEW & ADDTN  10/11/1996 PASS
Gay Receipt For Partial Pay  10/10/1996 PEND
Application received  10/10/1996
Recd Pcfee & Taken To Pln CK  10/10/1996 PEND