Permanent occupancy | | | 10/9/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7456 issued 10-9-98 to Les Bois Jr. High School.
|
Receive PAYMENT IN FULL | | | 10/2/1998 | | |
|
|
|
|
Permanent Occupancy | | 9/30/1998 | 9/30/1998 | | DONE |
|
|
|
|
Fee Review-notes | 9/28/1998 | | 9/28/1998 | | FEES |
|
|
|
value started out as 9,550,000.00 then went down to 8,612,186.00 final cert. turned in by gc value was 9,211,092.00 lh
|
INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - final inspection.
|
INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | PASS |
Russ Owen
|
|
|
stairs corrected and all other agencies sighned off also letter from progect engineer ok all special inspection items.
|
CHANGE STATUS TO (F) | | | 9/16/1998 | | |
|
|
|
|
INSP - Final | 9/10/1998 | 9/11/1998 | 9/11/1998 | P | PART |
Russ Owen
|
|
|
09/11/98 407 - only has 1 correction at the center stairs.
|
INSP-Final Inspection | 9/9/1998 | 9/9/1998 | 9/9/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved
|
(F) Reprint permit | | | 9/9/1998 | | |
|
|
|
|
(F) Reprint permit | | | 9/9/1998 | | |
|
|
|
|
INSP-Final Inspection | 9/3/1998 | 9/4/1998 | 9/4/1998 | P | NR |
Wes Worcester
|
|
|
09/04/98 342 - greg ###-#### fire dept still not signed off
|
INSP-Final Inspection | 8/27/1998 | 8/28/1998 | 8/28/1998 | P | FAIL |
Rick Jackson
|
|
|
greg ###-#### overhead roll-up door won't stay up. told contractor the door must remain down until working with alarms
|
Temporary occupancy | | | 8/28/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3683 issued 8-28-98 to Les Bois Jr. High School.
|
INSP-Final Inspection | 8/20/1998 | 8/21/1998 | 8/20/1998 | P | |
Rick Jackson
|
|
|
greg 208 521 8520
|
Code Occupancy Approval | | | 8/12/1998 | | PASS |
|
|
|
I OKED BOND AMOUT OF $129,910 ON 6-1-98, BOND POSTED LATE 6-2-98, I SIGNED OFF TEMPORARY OCCUPANCY 6-3-98. LANDSCAPE AND PARKING ALL IN PLACE, SIGNED FINAL AND RELEASE OF BOND.
|
INSP - Framing/Rough-in | 7/20/1998 | 7/22/1998 | 7/22/1998 | P | PART |
Russ Owen
|
|
|
07/22/98 407 - partial inspection of some reconstructed stairs and fire
|
INSP - Framing/Rough-in | 6/29/1998 | 6/30/1998 | 6/30/1998 | A | PASS |
Russ Owen
|
|
|
06/30/98 407 - stairs,looked at the new rubber.
|
INSP - Final | 6/8/1998 | 6/8/1998 | 6/8/1998 | P | PART |
Russ Owen
|
|
|
Gave a temp Occupancy.The stairs do not yet have the rubber tread coverings,as all of the stairs have had to be redone,to meet code required rise and run. Main reason they have requested a temp is to avoid penalty fees.They are to get the finish materials for the stairs asap. Also note the stairs will be subject to a re-inspection. we have had them rework stairs due to previous inspection correction. Trying to work with them.
|
INSP - Final | 6/3/1998 | 6/5/1998 | 6/8/1998 | A | NR |
Russ Owen
|
|
|
06/05/98 407 - They are not ready with the corrections at the stairs.
|
INSP-Final Inspection | 6/3/1998 | 6/4/1998 | 6/4/1998 | P | PART |
Rick Jackson
|
|
|
###-#### Randy Stimpson temp occ approved
|
INSP - Final | 6/3/1998 | 6/4/1998 | 6/4/1998 | A | PART |
Russ Owen
|
|
|
still need to correct stairs.
|
INSP - Final | 6/3/1998 | 6/3/1998 | 6/3/1998 | P | PART |
Russ Owen
|
|
|
06/03/98 407 - inspections of lower floor araeas.
|
INSP - Final | 6/2/1998 | 6/2/1998 | 6/2/1998 | A | PART |
Russ Owen
|
|
|
found electrical conduit sleves thru walls appear to have been fire stoped incorrectly,i notified Ormand and the Electrical contractor.
|
INSP - Final | 6/1/1998 | 6/1/1998 | 6/2/1998 | P | PART |
Russ Owen
|
|
|
06/01/98 407 - inspect upper areas have corrections fire penetrations.
|
INSP - Framing/Rough-in | 5/22/1998 | 5/28/1998 | 5/28/1998 | A | PART |
Russ Owen
|
|
|
05/28/98 407 - went out with george to conference job supper on stairs i
|
INSP - Framing/Rough-in | 5/22/1998 | 5/27/1998 | 5/27/1998 | P | PART |
Russ Owen
|
|
|
05/27/98 407 - meet with job supper about stairs correction.
|
INSP - Framing/Rough-in | 5/22/1998 | 5/26/1998 | 5/26/1998 | A | PART |
Russ Owen
|
|
|
05/26/98 407 - meet with george and bob stairs need to meet minimum rise
|
INSP-Final Inspection | 5/22/1998 | 5/26/1998 | 5/26/1998 | P | FAIL |
Rick Jackson
|
|
|
###-#### correction notice issued (too long to list)
|
INSP-Alarm Testing | 5/18/1998 | 5/20/1998 | 5/20/1998 | A | FAIL |
Rick Jackson
|
|
|
alarms/sprinkler not monitored. c/n issued for other isssues.
|
INSP - Wall cover | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | PART |
Russ Owen
|
|
|
Talked with Ormand about tempered glass required at the top of stairs.
|
INSP-Sprinkler Rough-in/Hydro | 4/2/1998 | 4/2/1998 | 4/2/1998 | A | PART |
Rick Jackson
|
|
|
rough-in complete of classrooms. office areas in south side need additional hangers. gen contractor will notify shilo.
|
INSP - Wall cover | 3/18/1998 | 3/27/1998 | 3/28/1998 | A | CANC |
Russ Owen
|
|
|
03/27/98 407 - cancell
|
INSP - Wall cover | 3/18/1998 | 3/26/1998 | 3/27/1998 | A | PART |
Russ Owen
|
|
|
03/26/98 407 - went over areas with Ormand job sup Randy,boiler room pen
|
INSP - Wall cover | 3/18/1998 | 3/25/1998 | 3/26/1998 | A | CANC |
Russ Owen
|
|
|
03/25/98 407 - unable to make it today due to wensday am staff meeting.
|
INSP - Wall cover | 3/18/1998 | 3/24/1998 | 3/25/1998 | A | PART |
Russ Owen
|
|
|
03/24/98 407 - went out talked with Ormand about electrical and pluming
|
INSP - Wall cover | 3/18/1998 | 3/23/1998 | 3/24/1998 | A | PART |
Russ Owen
|
|
|
03/23/98 407 - Talked with Randy of Ormand about fire stoping penetratio contacted trades with problems and they will correct.
|
INSP - Wall cover | 3/20/1998 | 3/20/1998 | 3/20/1998 | P | PART |
Russ Owen
|
|
|
inspection in the gym area noted correction items with R.ndy with Ormand.
|
INSP - Wall cover | 3/18/1998 | 3/19/1998 | 3/20/1998 | A | PART |
Russ Owen
|
|
|
03/19/98 407 -
|
INSP - Wall cover | 3/17/1998 | 3/17/1998 | 3/17/1998 | P | PART |
Russ Owen
|
|
|
inspection above grid ceilings in class rooms.note ceiling grid install before inspection,Job supper has noted,as well as i on fire stoping re-insp required. Areas D and G.
|
INSP - Framing/Rough-in | 3/13/1998 | 3/13/1998 | 3/13/1998 | P | PART |
Russ Owen
|
|
|
inspection of upper section g. ceiling grid has been installed.
|
INSP - Framing/Rough-in | 3/12/1998 | 3/12/1998 | 3/12/1998 | P | PART |
Russ Owen
|
|
|
inspections of area E ,they have installed grid ceiling with out approval,I am having to remove grids to inspect, I have correction in this area.
|
INSP - Wall cover | 3/9/1998 | 3/9/1998 | 3/9/1998 | P | PART |
Russ Owen
|
|
|
went out to check unit E above cieling will go back,they have set droped ceiling in .
|
INSP-Sprinkler Rough-in/Hydro | 2/12/1998 | 2/12/1998 | 2/12/1998 | A | PART |
Rick Jackson
|
|
|
checked areas E,G and H. all okay, still need heads in some areas not getting tiles yet. areas between bathrooms not sprinklered, will recheck later if they are needed.
|
INSP-Sprinkler Rough-in/Hydro | 2/5/1998 | 2/5/1998 | 2/5/1998 | A | PASS |
Rick Jackson
|
|
|
underground flush okay
|
INSP - Framing/Rough-in | 1/20/1998 | 1/20/1998 | 1/20/1998 | | PASS |
Russ Owen
|
|
|
ceiling in kitchen 1st layyer rock.
|
INSP - Wall cover | 1/7/1998 | 1/7/1998 | 1/7/1998 | | PART |
|
|
|
first layer upper floor corrridor,need to repair minor small holes.
|
INSP - Wall cover | 1/6/1998 | 1/6/1998 | 1/6/1998 | | PART |
|
|
|
kitchen cieling,told them to complete duct chases with fire stoping system.
|
INSP - Framing/Rough-in | 12/23/1997 | 12/22/1997 | 12/22/1997 | | PART |
|
|
|
inspect sience room ,need a fire damper added notified contractor.
|
INSP - Framing/Rough-in | 12/17/1997 | 12/16/1997 | 12/16/1997 | | PART |
Russ Owen
|
|
|
interior steel studs,have correction notice same as gary lane school,as i and carl inspected on 12/15/97.same project manager for both jobs.
|
INSP - Carpentry | 12/17/1997 | 12/16/1997 | 12/16/1997 | P | PART |
Carl Dependahl
|
|
|
w/ russ & Greg, proj mgr.
|
INSP - Framing/Rough-in | 11/6/1997 | 11/7/1997 | 11/7/1997 | A | PART |
Russ Owen
|
|
|
LEFT CORRECTION.
|
INSP - Framing/Rough-in | 10/13/1997 | 10/14/1997 | 10/14/1997 | A | PART |
Russ Owen
|
|
|
10/14/97 407 - Scheduled by Hello! on 10/13/97 at 13:35:20. walk thru only first framing inspection.
|
INSP - Masonry | 6/23/1997 | 6/24/1997 | 6/24/1997 | A | PASS |
Russ Owen
|
|
|
06/24/97 407 - special inspector.
|
INSP - Masonry | 6/18/1997 | 6/19/1997 | 6/19/1997 | A | PASS |
Russ Owen
|
|
|
06/19/97 407 - SPECIAL INSP.
|
INSP - Masonry | 6/18/1997 | 6/18/1997 | 6/18/1997 | P | NR |
Russ Owen
|
|
|
06/18/97 407 - grout need special inspection. has not been inspected by special inspector thi section E.
|
INSP-Conference | 5/8/1997 | 5/8/1997 | 5/8/1997 | P | PASS |
|
|
|
relocation of fdc and piv to side of building approved provided hydraulic line loss is not significantly increased. advised will need hydro of both lines
|
INSP - Footings | 5/5/1997 | 5/6/1997 | 5/6/1997 | A | FAIL |
Jim Storey
|
|
|
/ / 301 - STEEL CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
(F) Reprint permit | | | 3/26/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/25/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/1997 | | |
|
|
|
|
Print Occupancy Form | | | 3/21/1997 | | |
|
|
|
|
Telephone call | | | 3/21/1997 | | |
|
|
|
TALKED TO WENDEL, PERMIT READY, FEE DUE
|
Print Pending Permit.LaserJet4 | | | 3/20/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/13/1997 | | 3/19/1997 | | PASS |
|
|
|
|
Plan assigned to (M_O) | 11/4/1996 | | 3/19/1997 | | PASS |
|
|
|
THIS PROJECT WAS REVIEWED AND APPROVED BY KEN HARTELL - STATE OF IDAHO BUILDING DIVISION.
|
Routing Off Site - A.C.H.D | 2/20/1997 | | 2/20/1997 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/12/1997 | | 2/14/1997 | | PASS |
|
|
|
|
Routing - FIRE | 1/30/1997 | | 2/12/1997 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/30/1997 | | PASS |
|
|
|
REVISED FIRE HYDRANT LOCATIONS FOR DAVE MILLER.
|
Routing - PUBLIC WORKS | 1/13/1997 | | 1/16/1997 | | FAIL |
|
|
|
PROOF OF LEGAL LAND DIVISION
|
Routing - MECHANICAL | 1/6/1997 | | 1/13/1997 | | PASS |
|
|
|
WILL FIELD VERIFY
|
INSP - Framing/Rough-in | 1/6/1997 | 1/7/1997 | 1/7/1997 | P | NH |
Jim Sly
|
|
|
01/07/97 316 - FRAME REINSPECT Could not find any construction on Grand Could have had more info on location or tele # of contractor.
|
Routing - ELECTRICAL | 12/31/1996 | | 1/6/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/9/1996 | | 12/31/1996 | | FAIL |
|
|
|
NEEDS DRAINAGE PLAN REVISIONS 12/31/96
|
Routing - PLANNING | 12/5/1996 | | 12/9/1996 | | PASS |
|
|
|
X-ref: CU-95-95. Approved by SR.
|
Routing Off Site - C.D.H | 11/6/1996 | | 12/5/1996 | | PASS |
|
|
|
SCOTT HENSON TOOK PLANS OUT TO CDH AFTER THEY WERE DONE AT ACHD. KMM 11-06-96
|
Routing Off Site - A.C.H.D | 10/16/1996 | | 11/5/1996 | | FAIL |
|
|
|
CONTACTED SCOTT HENSON AT ###-#### TO TAKE PLANS OUT TO ACHD
|
Plan Reviewer's activity | | | 11/4/1996 | | PEND |
|
|
|
THIS PLAN WAS REVIEWED AND APPROVED BY THE STATE OF IDHAO BUILDILNG DIVISION. MO.
|
Plan routing begun/NEW & ADDTN | | | 10/16/1996 | | PASS |
|
|
|
|
Received Certificate of Value | | | 10/15/1996 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 10/15/1996 | | PASS |
|
|
|
|
Application received | | | 10/15/1996 | | |
|
|
|
|