Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD96-02880
StatusFinaled
Name COMSTOCK & BUSH LAW OFFICES
Site Address 800 W IDAHO ST Unit: 3 FL
Project NameTHE MODE BLDG
Customer Number 
ePlanReviewNo
Description
(COMSTOCK & BUSH LAW OFFICES) Fire sprinklers substitute for 1-hr fire-resistive construction. To finish a 3,344 square foot office tenant space on the 3rd floor. Work is to include 1-hr fire-resistive wall infills at two door openings through the "escalator separation" walls, installation of 1-hr double doors in one "escalator separation" wall, interior nonbearing walls, and interior windows and doors all per approved drawings and plancheck notes on file. The vanilla shell work for this space was covered under BLD96-0457. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. PC-626-96 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 2/26/19972/26/1997 DONE
Details
Permanent occupancy  2/26/1997 PASS
Perm. Occ. Cert. #6795 issued 2-26-97 to the Comstock & Bush Law Offices.
INSP - Final2/6/19972/7/19972/7/1997APASS
Details
SUITE 300 ALRM TEST, OTHER C/N ITEMS DONE
Temporary occupancy  1/31/1997 PASS
Temp. Occ. Cert. #3358 issued 1-31-97 to Comstock & Bush Law Offices.
INSP - Final1/30/19971/31/19971/30/1997APART
Details
01/31/97 333 - FNL -OK FINAL card signed for temp OTH-OTHER AGEN
INSP - Final1/28/19971/29/19971/29/1997APART
Details
temp occ ok, c/n issued on small items, advised no door hold open on door to escalator atrium w/o resubmittal
INSP - Final1/28/19971/29/19971/29/1997PFAIL
Details
01/29/97 333 - OTH-OTHER AGENCIES NOT APPROVED
90 day tracking............. 10/23/19961/21/1997
INSP-Sprinkler Rough-in/Hydro11/27/199612/2/199612/2/1996APASS
Details
ok to cover, had old tiles removed from inside new soffits
INSP - Framing/Rough-in11/27/199612/2/199612/2/1996APART
DetailsWes Worcester
interior walls ok after supporting top plate, ck on penetrations and incorrect ceiling assy of 1 hr corridor tunnel assy
Telephone call  11/13/1996
TOLD DAVE PERMIT READY
Issue PAID IN FULL permit  11/13/1996
Routing - FIRE11/4/1996 11/12/1996 PASS
Plan assigned to (CJW)10/24/1996 11/12/1996 PASS
DetailsCarl Westfall
11/12/96 14:15:38 CJW - this action updated by action script from <<>> in Case No. BLD96-2880
Print Occupancy Form  11/12/1996
PLANS/APPL TAKEN TO FRONT DESK  11/12/1996 PASS
Inspection Record Card- Bld  11/12/1996
Routing - PLAN CHECK10/25/1996 11/4/1996
testing condition printout  11/4/1996
Print permit w/o conditions  11/4/1996
Plan Reviewer's activity  11/1/1996 PASS
UBC plan check started Nov. 1, 1996 and completed Nov. 4, 1996. The drawings were approved.
Routing - PUBLIC WORKS10/25/1996 10/28/1996 PASS
Plan routing begun/TENANTS  10/24/1996
Route to Public Works then back to Plan Check. After Plan Check route to Fire Department.
Application received  10/23/1996
Recd Pcfee & Taken To Pln CK  10/23/1996
Gay Receipt For Partial Pay  10/23/1996
Routing - PLAN CHECK11/12/1996