Permanent Occupancy | | 3/27/1997 | 3/27/1997 | | DONE |
|
|
|
|
INSP - Final | 3/27/1997 | 3/27/1997 | 3/27/1997 | P | PASS |
|
|
|
03/27/97 338 - made ok
|
Permanent occupancy | | | 3/27/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #6817 issued 3-27-97 to Safelite Auto Glass.
|
Permanent occupancy | | | 3/27/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #6817 issued 3-27-97 to Safelite Auto Glass.
|
INSP - Final | 3/25/1997 | 3/25/1997 | 3/25/1997 | P | PASS |
Joe Tawney
|
|
|
03/25/97 406 - FINAL REINSP OK FOR CERT OF COMPLETION STORAGE RACKS TO SEPARATE PERMIT
|
INSP - Final | 3/25/1997 | 3/25/1997 | 3/24/1997 | P | PART |
|
|
|
03/25/97 338 - ok for temp only until the storage rack permit is issueed
|
INSP - Final | 3/24/1997 | 3/24/1997 | 3/24/1997 | P | FAIL |
Joe Tawney
|
|
|
03/24/97 406 - FINAL FAILED TAG EXT LETTERING OVER DOOR INSTALL EMERG WALL
|
INSP-Conference | 3/21/1997 | 3/21/1997 | 3/21/1997 | A | PASS |
|
|
|
reviewed storage plans for racks. comb storage will be under 12 ft, no high haz storage issues, need rack permit from structural
|
INSP - Final | 3/19/1997 | 3/20/1997 | 3/19/1997 | A | NR |
|
|
|
03/20/97 338 - HE WILL CALL TO SCHEDULE OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Foundation | 3/11/1997 | 3/11/1997 | 3/11/1997 | P | PASS |
|
|
|
03/12/97 338 - RETAINING WALLS r-bar placed okto pour
|
INSP - Foundation | 2/27/1997 | 2/28/1997 | 2/28/1997 | P | PASS |
|
|
|
02/28/97 338 - for the loading dock
|
INSP - Framing/ Rough-in | 2/21/1997 | 2/21/1997 | 2/21/1997 | | PASS |
|
|
|
/ / 338 -
|
INSP - Framing/Rough-in | 2/20/1997 | 2/20/1997 | 2/20/1997 | P | CANC |
|
|
|
02/20/97 338 - RESCHEDULED 02/21/97
|
INSP - Conference | 2/13/1997 | 2/14/1997 | 2/14/1997 | A | PASS |
|
|
|
02/14/97 338 - made ok
|
INSP-Conference | 2/12/1997 | 2/12/1997 | 2/12/1997 | | PASS |
|
|
|
CONF ON INST OF FIRE ASSYS REFERRED TO STRUCT DEPT ALSO DISCUSSED FUSIBLE LINKS AND EXIT DOORS
|
INSP - Miscellaneous | 2/10/1997 | 2/10/1997 | 2/10/1997 | | PASS |
|
|
|
/ / 338 - deliver approved resubmittals to jobsite
|
INSP - Miscellaneous | 2/10/1997 | | 2/9/1997 | | PASS |
|
|
|
REVIEWED RESUBMITTALS AND ATTACHED TO OFFICE COPY OF PLANS ALSO APPROVED SAME
|
Inspection Record Card- Bld | | | 2/7/1997 | | |
|
|
|
|
Print Occupancy Form | | | 2/7/1997 | | |
|
|
|
|
CHANGE STATUS TO (I) | | | 2/4/1997 | | |
|
|
|
|
INSP - Conference | 2/3/1997 | 2/3/1997 | 2/3/1997 | | FAIL |
|
|
|
/ / 338 - conference to reject plans submitted as there is no seal on plans rejected
|
Plan assigned to (338) | 2/2/1997 | | 2/2/1997 | | PEND |
|
|
|
FIRE DOOR DETAILS REQUESTED AND MARKED ON THE PLANS TO BE SUPPLIED TO THE INSPECTOR AT THE TIME OF FIRST ROUGH IN INSPECTOR.
|
Plan resubmittals received | | | 1/30/1997 | | PEND |
|
|
|
RECIEVED PLANS FROM PLAN REVIEWER PRP AS PERMIT WAS ISSUED.
|
INSP - Conference | 1/30/1997 | 1/30/1997 | 1/29/1997 | P | PASS |
|
|
|
01/30/97 338 - made ok
|
90 day tracking............. | | 10/24/1996 | 1/22/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/21/1997 | | |
|
|
|
|
Plan assigned to (PRP) | 10/25/1996 | | 12/6/1996 | | PASS |
|
|
|
12/06/96 14:18:26 PRP - this action updated by action script from <<>> in Case No. BLD96-2884
|
Telephone call | | | 12/6/1996 | | |
|
|
|
JERY FRAZOER RETURNED MY CALL, GAVE HIM FEE'S DUE. SINCE THEY ARE OUT THEY WILL HAVE SEND SUPER UP TO GET PERMIT, MIGHT NOT BE UNTIL AFTER X-MAS
|
Telephone call | | | 12/6/1996 | | |
|
|
|
LEFT MESSAGE ON JERRY FRAZOERS MACNINE
|
Inspection Record Card- Bld | | | 12/6/1996 | | |
|
|
|
|
Print Occupancy Form | | | 12/6/1996 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/1996 | | PASS |
|
|
|
issue
|
Plan resubmittals received | | | 12/6/1996 | | PASS |
|
|
|
received all that was requested, assembled and issued.
|
Routing - PLAN CHECK | 11/5/1996 | | 11/26/1996 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/26/1996 | | PEND |
|
|
|
files
|
Plan Reviewer's activity | | | 11/26/1996 | | PEND |
|
|
|
reviewed plans yesterday, telephone Jerry Fraizer about need to place Occupancy Separation wall between service and warehouse and discuss preliminary faxed revisions, mark-up plans, prepare correction list, input to Plan analysist for review, Fax corrections to Engineer and Contractor, Input to Tidemark, forward to Fire.
|
Plan resubmittals requested | 11/26/1996 | | 11/26/1996 | | |
|
|
|
|
Telephone call | | | 11/25/1996 | | PEND |
|
|
|
called Jerry Fraizer about Occupancy separation wall, and 1-hr rated openings.
|
Routing - PLANNING | 10/28/1996 | | 11/5/1996 | | FAIL |
|
|
|
X-ref: CU-107-89,DR-94-89. Needs design review modification. Okay per HWG to place a letter in CU file regarding design review modification rather than requiring conditional use modification also. Reviewed by GRH & MS.
|
Plans ACCEPTED BY PLAN CHECK | | | 11/5/1996 | | PEND |
|
|
|
PRELIMINARY REVIEW REQUIRING INFORMATION BEFORE PLAN CHECK CAN BE PERFORMED.
|
Routing - PUBLIC WORKS | 10/25/1996 | | 10/28/1996 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 10/25/1996 | | |
|
|
|
Route to PUBLIC WORKS and PLANNING then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT.
|
Recd Pcfee & Taken To Pln CK | | | 10/24/1996 | | |
|
|
|
|
Gay Receipt For Partial Pay | | | 10/24/1996 | | |
|
|
|
|
Application received | | | 10/24/1996 | | |
|
|
|
|