Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD96-02927
StatusExpired
Name LB INDUSTRIES
Site Address 8783 HACKAMORE DR
Project NameLB INDUSTRIES
Customer Number 
ePlanReviewNo
Description
TO BUILD A NEW 16,260 SQUARE FOOT, ONE STORY, OFFICE/WAREHOUSE SHELL BUILDING. CONSTRUCTED OF CONCRETE SLAB FLOOR, MASONRY EXTERIOR WALLS, STEEL INTERIOR COLUMNS, AND TJI ROOF SYSTEM WITH PLYWOOD ROOF DECK AND FOAM INSULATION ROOF SYSTEM. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMNTS. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING. DR-111-96/CU-55-96/PC#646-96/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - L/C Approved1/21/1999 1/21/1999 PASS
ageing sheet update...l/c issued 08/29/97
INSP - Final8/29/19978/29/19978/29/1997 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR CERT OF COMPL ON SHELL
INSP - Final8/29/19978/29/19978/29/1997 PASS
Details
/ / 338 - FNL -OK FINAL LCI-LETTER OF COMPLIANCE ISSUED
INSP - Letter of compliance8/29/19978/29/19978/29/1997 PASS
Details
/ / 338 - LCI-LETTER OF COMPLIANCE ISSUED
INSP - Final6/26/19976/26/19976/26/1997PPART
Details
06/26/97 338 - FINAL FOR C/O. LATE PM. SIGNED THE TEMP COL ON THE OCC R CORRECTION WILL COPY FIRE INSP OK FOR A TEMP C/C
INSP-Final Inspection6/26/19976/26/19976/26/1997PPART
DetailsJoe Tawney
06/26/97 406 - FINAL FOR C/O. EARLY PM. OK FOR TEMP CERT OF COMPL NO TENANTS UNTIL SPKLR MONITORING INST AND DUCT DETECTORS INST AND TESTED
Routing for occupancy6/20/19976/20/19976/20/1997 PASS
Art Yingling inspected for Final - meets compliance with CU-55-96/DR-111-96.
INSP-Final Inspection6/18/19976/19/19976/19/1997AFAIL
DetailsJoe Tawney
06/19/97 406 - FINAL ON SPRINKLERS RON ###-#### - TONE - DIAL IN YOUR NU FINAL ON SHELL FAIL BOLLARDS AT GAS METERS BLDG ADDRESS SPKLR SYSTEM OFF EAST WALL ON GRID LINE 4 NOT 1 HR CONSTR PER PLAN CURB STRIPING
INSP-Sprinkler Rough-in/Hydro6/18/19976/18/19976/18/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST
INSP-Sprinkler Rough-in/Hydro6/18/19976/18/19976/18/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST
INSP-Sprinkler Rough-in/Hydro6/12/19976/12/19976/12/1997PFAIL
DetailsJoe Tawney
06/12/97 406 - BRIAN CAULKINS -###-#### HYDRO TEST FAIL FDC PIPING NOT INCLUDED
INSP - Final6/10/19976/11/19976/11/1997PNR
Details
06/11/97 338 - OTH-OTHER AGENCIES NOT APPROVED not ready
INSP - Framing/Rough-in5/9/19975/12/19975/11/1997APASS
Details
05/12/97 338 - okto close in the soffits
INSP - Carpentry5/8/19975/8/19975/8/1997PPASS
DetailsJim Sly
05/08/97 316 - Inspection of canopy for cover.... West End
INSP - Framing/Rough-in5/6/19975/7/19975/6/1997PNR
Details
05/07/97 333 - not ready mansard not done cant find electr sticker
INSP - Framing/Rough-in5/1/19975/1/19975/1/1997PPART
DetailsCarl Dependahl
05/01/97 340 - ROOF NAILING SW SIDE OK; DRAFT STOP OK AT CANOPY. REQUEST FRAME OK
INSP - Conference4/30/19974/30/19974/30/1997 PASS
DetailsCarl Dependahl
/ / 340 - W/ SUPT. RE DRAFT STOPS AT CANOPY, OK TO BEGIN COVER
INSP - Conference4/30/19974/30/19974/30/1997 PASS
DetailsCarl Dependahl
/ / 340 - W/ SUPT. RE DRAFT STOPS AT CANOPY, OK TO BEGIN COVER
INSP - Framing/Rough-in4/25/19974/29/19974/29/1997AFAIL
DetailsCarl Dependahl
04/29/97 340 - C/N, NEED CLARIFICATION OF DRAFT STOPS, NAIL OFF CLIPS, H
INSP - Framing/Rough-in4/24/19974/25/19974/25/1997APART
Details
04/25/97 338 - roof deck only front portion
INSP - Framing/Rough-in4/18/19974/21/19974/21/1997PPART
Details
04/22/97 338 - PERRY, I'M NOT SURE WHAT THIS INSP.WAS FOR..... partial
INSP - Masonry4/10/19974/11/19974/10/1997PPASS
Details
04/11/97 338 - made ok with sp insp approval r-bar placed
INSP - Masonry4/9/19974/10/19974/9/1997APASS
Details
04/10/97 338 - made ok with sp insp blessing
INSP - Wall cover4/9/19974/9/19974/8/1997PPASS
Details
04/09/97 338 - rebar in block made ok this shuld be a masonry insp for t
INSP - Masonry4/8/19974/8/19974/8/1997 PASS
Details
/ / 338 - madeok with the spec. insp blessing r-bar placed
INSP - Masonry4/7/19974/7/19974/6/1997PPASS
Details
04/07/97 338 - made ok with sp insp approval
INSP - Masonry4/2/19974/3/19974/3/1997APART
DetailsCarl Dependahl
04/03/97 340 - BLK. REBAR...338 AREA, PENDING SPEC INSP REPORTS FROM STR
INSP - Foundation3/31/19974/1/19973/31/1997APASS
Details
03/31/97 338 - FND.REBAR made ok with sp insp ok
INSP - Masonry3/28/19973/31/19973/30/1997APASS
Details
03/31/97 338 - C M U made ok with sp insp ok
INSP - Foundation3/26/19973/27/19973/26/1997APASS
Details
03/27/97 338 - made ok with sp insp ok
INSP - Foundation3/24/19973/25/19973/24/1997APASS
Details
03/25/97 338 - FND. REBAR CMU ok with sp insp approval will pour at the come back out ì
INSP-Conference3/20/19973/20/19973/20/1997 PASS
PRE CONSTR CONF
testing condition printout  3/18/1997 PASS
testing condition printout  3/17/1997 PASS
INSP - Footings3/14/19973/14/19973/13/1997PPASS
Details
03/14/97 338 - MADE OK rebar FDN -OK FOUNDATION ì
INSP - Foundation3/11/19973/12/19973/11/1997APASS
Details
03/12/97 338 - FND.REBAR..POURING AT 1 P.M. made ok
INSP - Footings3/6/19973/7/19973/5/1997APASS
Details
03/07/97 338 - r-bar placed ok with sp insp approval
INSP - Foundation3/5/19973/6/19973/5/1997PNR
Details
03/06/97 338 - RETAINING WALLpostpone till 03-07-97 # 1
INSP - Foundation3/5/19973/5/19973/5/1997 PASS
Details
/ / 338 - made ok r-bar placed in the east 3/4 ok to pour withthe spec
INSP - Footings2/28/19973/3/19973/3/1997PNR
Details
03/03/97 338 - postpone till 03-04-97
INSP - Footings3/3/19973/3/19973/3/1997 PASS
Details
/ / 338 - spec insp made ok for the east 3/4 of building
INSP-Supply line flush2/26/19972/28/19972/28/1997PPART
DetailsJoe Tawney
02/28/97 406 - READY AT 3:00 OK FOR UNDERGROUND HYDRO TEST
(F) Reprint permit  2/20/1997
Plan assigned to (JCM)11/13/1996 2/19/1997 PASS
DetailsJohn Menard
Issue PAID IN FULL permit  2/19/1997
Telephone call  2/19/1997
CALLED TALKED TO RENEE GAVE DOLLAR AMOUNT
Print Occupancy Form  2/19/1997
Inspection Record Card- Bld  2/19/1997
PLANS/APPL TAKEN TO FRONT DESK  2/19/1997 PASS
Routing - FIRE2/18/1997 2/18/1997 PASS
PACKAGE #1
Plan Reviewer's activity  2/18/1997 PASS
NEW CERTIFICATE OF VALUE AND THE CONTRACTOR'S NAME WAS SUBMITTED ALONG WITH THE ACHD CERTIFICATE OF PAYMENT.
Plan resubmittals received  2/13/1997 PASS
Routing Off Site - A.C.H.D10/31/1996 2/10/1997 PASS
PACKAGE #4 CONTACTED CRICKET LANGWORTHY AT ###-#### TO TAKE PLANS OUT TO ACHD. KMM ACHD FEES NOT PAID. ACHD FEES PAID 02/18/97 - CERTIFICATE #97-0616
Routing - PLANNING2/10/1997 2/10/1997 PASS
X-ref: CU-55-96,DR-111-96. Approved by RLB & TKW.
Plan resubmittals requested  1/29/1997 PEND
FAX SENT TO BRS REQUESTING ADDITIONAL REVISIONS TO COMPLY WITH ORIGINAL CORRECTION LIST.
90 day tracking............. 10/29/19961/27/1997
Plan resubmittals received  1/22/1997 PEND
Routing - PLANNING11/14/1996 11/22/1996 FAIL
PACKAGE #2 X-ref: CU-55-96/DR-111-96. Need revised plans for DR staff to sign off. Faxed Clinton info. Reviewed by RLB & TKW.
Routing Off Site - STRUCTURAL10/31/1996 11/19/1996
JONES PACKAGE #3 FOR ENGINEERING. KMM CORRECTION LIST FROM ATWOOD-HINZMAN-JONES WAS FAXED AND MAILED TO BRS ARCHITECTS FOR THEIR RESPONSE ON 11/20/96. JCM
Routing - PLAN CHECK11/13/1996 11/18/1996
PACKAGE #1
Routing - FIRE11/18/1996 11/18/1996 FAIL
PACKAGE #1
Routing - PLAN CHECK11/18/1996 11/18/1996
package #1
Plan resubmittals requested  11/15/1996 PEND
PRELIMINARY PLAN REVIEW COMPLETE, SENT CORRECTION LIST TO CRICKET LANGWORTHY AT BRS.
Routing - ELECTRICAL11/8/1996 11/13/1996 PASS
PACKAGE #1
Routing - PUBLIC WORKS10/31/1996 11/13/1996 PASS
PACKAGE #2
Plan assigned to (RGG)11/1/1996 11/13/1996
assigned to john
Routing - PLUMBING11/6/1996 11/8/1996 PASS
PACKAGE #1
Routing - MECHANICAL10/31/1996 11/6/1996 PASS
PACKAGE #1
Plan routing begun/NEW & ADDTN  10/30/1996 HOLD
PLANS ON HOLD: WAITING FOR 6 C-1 SHEETS AND 6 C-3 SHEETS THEY WERE STAMPED NOT FOR CONSTRUCTION. NEED DRAINAGE CALCS. FOR PACKAGE #2. NEED REVISED CERT. OF VALUE WITH ELE. PL. AND MECH BREAKDOWN. CONTACTED CRICKET LANHWORTHY AT ###-#### REQUESTING THESE ITEMS BEFORE ROUTING OF PLANS CAN BEGIN. KMM 10-30-96
Application received  10/29/1996
Recd Pcfee & Taken To Pln CK  10/29/1996
Gay Receipt For Partial Pay  10/29/1996
Routing - PLAN CHECK2/10/1997  
PACKAGE #4
Routing - PLAN CHECK2/11/1997  
PACKAGE #2
Routing - PLAN CHECK2/18/1997  
PACKAGE #1
Routing - PLAN CHECK11/19/1996  
Routing - PLAN CHECK11/25/1996  
package #2
Routing - PLAN CHECK11/19/1996  
PACKAGE #3
Routing Off Site - STRUCTURAL11/19/1996  
PACKAGE #3 TO CH2M HILL (WITH RESUBS) 11/19/96 DAR