INSP - Roof | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PASS |
Jim Storey
|
|
|
11/26/97 301 - KEVIN WILL CALL YOU TO DISCUSS THIS // no call from kevin the airport roof and info. to insp.
|
Issue PAID IN FULL permit | | | 11/18/1996 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/15/1996 | | PASS |
|
|
|
|
Telephone call | | | 11/15/1996 | | |
|
|
|
Phone call to Brenda Greenman of Tolley-Hughes for information on roof system to be used. this was not specified in application. I had pointed this out in a letter sent to her on 11/11/96. She said they were still working on the proble.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/1996 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 11/15/1996 | | PASS |
|
|
|
Received information requested from roofing contractor. Ready to process for issuance of a building permit.
|
Inspection Record Card- Bld | | | 11/15/1996 | | |
|
|
|
|
Plan Reviewer's activity | | | 11/13/1996 | | |
|
|
|
Received information from Sandip Guna of CSHQA, stamped with his enginnering stamp approving the addition of the additinal roof load. The ballast being removed will not be put back and will more than offset the additional load.
|
Application received | | | 11/11/1996 | | |
|
|
|
|
Plan Reviewer's activity | | | 11/11/1996 | | |
|
|
|
Sent letter to Brenda Greenman of Tolley-Hughes. Appllication for permit to add an additional roof over an existing roof at the airport does not include an evaluation of the structural capacity by an engineer & the other items of concern to be answered by the roofer per Appendix Chapter 15, Sec. 1516.1 1994 UBC.
|