Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD96-03109
StatusFinaled
Name POWER ENGINEERS
Site Address 9450 W OVERLAND RD
Project NameBLACKEAGLE #7
Customer Number 
ePlanReviewNo
Description
BLACKEAGLE DEVELOPMENT-BLDG. #7 * TO CONSTRUCT A NEW 34,750 SQ. FT. SHELL AND CORE OFFICE BUILDING. THE WORK CONSISTS OF THE SITE IMPROVEMENTS INCLUDING ASPHALT PARKING FOR 160 STALLS, LANDSCAPING, AND THE EXTERIOR SHELL AND ROOF FOR THE BUILDING. THE BUILDING IS A TILT-UP CONCRETE CONSTRUCTION SYSTEM WITH ALUMINUM STOREFRONT WINDOWS AND DOORS. THE ROOF DECK IS FRAMED WITH WOOD GLU-LAM BEAMS, BAR-JOISTS, PLYWOOD SHEATHING AND SINGLE-PLY ROOFING MEMBRANE. ALL INTERIOR TENANT IMPROVEMENTS TO BE COMPLETED UNDER SEPARATE PERMIT. DR#-55-96 PC#695-96
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - L/C Approved  4/6/1999 PASS
l/c issued 05/12/98
INSP - Final5/11/19985/12/19985/12/1998APASS
Details
05/12/98 338 - issued l/c and signed the occreq card on site
INSP - Final2/26/19982/26/19982/26/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP ON SHELL OK FOR CERT OF COMPLETION
INSP - Final9/17/19979/17/19979/17/1997 FAIL
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL FAIL KNOX BOX CURG STRIPING AT ENTRANCES F
INSP - Temporary occupancy8/20/19978/21/19978/21/1997APASS
Details
08/20/97 338 - bld #7 TCO -TEMP C OF O ISSUED ok to issue temp col signec
Temporary occupancy  8/21/1997 PASS
Temp. Occ. Cert. #3453 issued 8-21-97 to Black Eagle Development, Bldg. #7.
INSP - Final8/15/19978/18/19978/18/1997AFAIL
Details
08/18/97 338 - c/n issued OTH-OTHER AGENCIES NOT APPROVED
INSP-Final Inspection8/18/19978/18/19978/18/1997 PART
DetailsJoe Tawney
08/18/97 406 - REINSP FOR FINAL OK FOR TEMP FIRE HYD TOO LOW STRIPE & L
INSP-Final Inspection8/18/19978/18/19978/18/1997 PART
DetailsJoe Tawney
08/18/97 406 - REINSP FOR FINAL OK FOR TEMP FIRE HYD TOO LOW STRIPE & L
Routing for occupancy8/15/19978/15/19978/15/1997 TEMP
Scott Brown insp - Perry Payne signed for Enf./Bonds Posted (See: Wayne Gibbs or Susan Riggs)
INSP-Final Inspection8/15/19978/15/19978/15/1997 NR
DetailsJoe Tawney
08/15/97 406 - reinspection NOT READY Inspection cancelled by Hello!
INSP-Final Inspection8/13/19978/14/19978/15/1997AFAIL
DetailsJoe Tawney
08/14/97 406 - Final for shell and building FINAL FAIL ADDRESS SPKLR RM HYD HEIGHT STRIPE CURBS FD TURN AROUNDS
INSP-Sprinkler Rough-in/Hydro8/8/19978/8/19978/8/1997 PASS
DetailsJoe Tawney
/ / 406 - OK ON SPKLR SYSTEM HYDRO TEST
INSP - Framing/Rough-in7/31/19978/1/19978/1/1997APASS
Details
08/01/97 338 - made ok minor verbal corrections slack wires at the perim
INSP-Supply line flush6/24/19976/24/19976/24/1997 PART
UNDERGROUND FLUSH OK
INSP - Roof4/29/19974/29/19974/30/1997PPART
DetailsCarl Dependahl
04/29/97 340 - SOME PLY SHEETS REPLACED, NAILING APPEARS OK; ASKED FOR E SUBSTITUTION LSTI FOR MST 160 & OVERALL OK. NEED VMBS WELDED AT COLS
90 day tracking............. 11/18/19962/16/1997
INSP - Footings2/4/19972/4/19972/4/1997PPASS
Details
02/04/97 338 - BLDG 7 this insp is for a slab
(F) Reprint permit  2/3/1997
Inspection Record Card- Bld  1/31/1997
Telephone call  1/31/1997
TALKED TO COLLEEN GAVE DOLLAR AMOUNT
Issue PAID IN FULL permit  1/31/1997
Print Occupancy Form  1/31/1997
Print Pending Permit.LaserJet4  1/30/1997
PLANS/APPL TAKEN TO FRONT DESK  1/30/1997 PASS
Plan assigned to (M_O)12/9/1996 1/29/1997 PASS
Routing - PUBLIC WORKS1/27/1997 1/28/1997 PASS
PACKAGE #2 AS NOTED AND ATTACHED JT. OF PW. KMM
Routing - PLUMBING1/24/1997 1/27/1997 PASS
PACKAGE #1
Routing - PLAN CHECK12/30/1996 1/24/1997
PACKAGE #1
Routing - PLAN CHECK12/31/1996 1/24/1997
PACKAGE #1
Routing - PLANNING1/15/1997 1/24/1997 PASS
PACKAGE #2 X-ref: DR-73-96. Approved by SR & TKW.
Plan resubmittals received  1/22/1997 PASS
PLUMBING RESUBMITTALS RECEIVED.
Routing - PLAN CHECK12/17/1996 1/15/1997
package #2
Routing Off Site - STRUCTURAL12/6/1996 1/3/1997 PASS
PACKAGE #3 PLANS TAKEN OUT TO STAPLEY ENGINEERING VIA PDQ. KMM
Routing - PLUMBING12/30/1996 12/31/1996 FAIL
PACKAGE #1
Routing - FIRE12/30/1996 12/30/1996 PASS
PACKAGE #1
Routing - PLAN CHECK12/17/1996 12/30/1996
PACKAGE #1
Routing - PLANNING12/13/1996 12/17/1996 FAIL
PACKAGE #1 Continue routing-need landscape plan. Reviewed by SR.
Routing - FIRE12/13/1996 12/17/1996 FAIL
PACKAGE #1
Routing - PLANNING12/12/1996 12/17/1996 FAIL
PACKAGE #2 Continue routing-we are waiting for the landscaping berm plan prior to signing these plans off. Reviewed by SR.
Plan Reviewer's activity  12/13/1996 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT ON 12-13-96. MO
Routing Off Site - A.C.H.D12/6/1996 12/11/1996 PASS
PACKAGE #4 CONTACTED STAN COLE AT ###-#### TO TAKE PLANS OUT TO ACHD. KMM IMPACT FEES PAID.
Plan assigned to (RGG)11/21/1996 12/9/1996
ASSIGNED TO MIKE O.
Routing - PLAN CHECK12/9/1996 12/9/1996
PACKAGE #1
Routing - PUBLIC WORKS12/6/1996 12/9/1996 FAIL
PACKAGE #2 NEEDS 1. PROOF OF LEGAL LAND DIVISION 2. SITE PLAN DOESN'T COMPLY WITH RECORDED PLAT AND/OR LEGAL DESCRIPTION. 3. REQUIRES STREET LIGHT PLAN
Routing - ELECTRICAL12/6/1996 12/9/1996 PASS
PACKAGE #1
Plan routing begun/NEW & ADDTN  12/6/1996 PASS
MATT REVISED HIS PACKAGED PLANS. PLANS ARE NOW READY FOR ROUTING. KMM 12-06-96
Plans ACCEPTED BY PLAN CHECK  12/6/1996 PASS
MATT SUBMITTED REVISED PACKAGE PLANS. PLANS READY FOR ROUTING. KMM
Routing - PLUMBING12/6/1996 12/6/1996 FAIL
PACKAGE #1 PROVIDE ROOF DRAIN AND OVER FLOW SIZING. BV KMM
Plan routing begun/NEW & ADDTN  11/19/1996 HOLD
SEE ACTION A007
Plans ACCEPTED BY PLAN CHECK  11/19/1996 HOLD
PLANS ON HOLD UNTIL MATT RESPONDS TO PACKAGE #1: SOILS REPORT, PLUMBING ISSUE, ELEC. SCHEMATIC. PACKAGE #2: PLUMBING ISSUE. PACKAGE #3: SOILS REPORT. WILL NEED TO SHOW SEWER AMD WATER LINES SIZES AND ENTRANCES INTO BUILDING. KMM CONTACTED MATT ON 11-19-96
Received Certificate of Value  11/18/1996 PASS
Gay Receipt For Partial Pay  11/18/1996
Recd Pcfee & Taken To Pln CK  11/18/1996
Application received  11/18/1996
Routing - PLAN CHECK1/15/1997  
PACKAGE #4
Routing - PLAN CHECK1/27/1997  
PACKAGE #1
Routing - PLAN CHECK1/29/1997  
PACKAGE #2