INSP - Final | 1/7/1999 | 1/7/1999 | 1/7/1999 | P | PASS |
Carl Dependahl
|
|
|
from aging sheet; previous notes show final ok, change status to "D".
|
Office final | | | 1/4/1999 | | PASS |
|
|
|
Completed w/ Ink-Jet project; c/o issued for HP # 6 covers work under this permit. Picked up from aging sheet.
|
INSP - Conference | 5/1/1997 | 5/1/1997 | 5/1/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - BLDG 6, INK JET PROJ W/ JOHN KERR & TIM BASHFORD
|
INSP - Conference | 4/25/1997 | 4/25/1997 | 4/25/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ CONT; RE PROGRESS OF ASSOC. PERMIT, REFER TO PLAN CHK
|
INSP - Carpentry | 4/23/1997 | 4/23/1997 | 4/23/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - bldg 6 INK JET PROJ; CHK WIP, DISCUSSED NEED FOR FURTHER PER
|
INSP - Conference | 4/22/1997 | 4/22/1997 | 4/22/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - BLDG 6; W/ DAN S. RE PLAN NOTES
|
INSP - Carpentry | 3/18/1997 | 3/18/1997 | 3/18/1997 | P | PART |
Carl Dependahl
|
|
|
03/18/97 340 - OBSERVED DEFECTION HEAD AT CORR, 2HR, & OCC SEP WALLS; HI
|
INSP - Framing/Rough-in | 3/10/1997 | 3/11/1997 | 3/11/1997 | P | PART |
Carl Dependahl
|
|
|
03/11/97 340 - PART, OK TO COVER E-W- CORRIDOR AREA
|
INSP - Conference | 3/11/1997 | 3/11/1997 | 3/11/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - MET W/ CONTRACTOR & proj mgr; need all spec insp reports
|
90 day tracking............. | | 11/22/1996 | 2/20/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/15/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/14/1997 | | |
|
|
|
|
Print Occupancy Form | | | 1/14/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 12/30/1996 | | 1/14/1997 | | PASS |
|
|
|
Reviewed resubmittal from architect. Approved plan for processing for permit. Answers from structural engineer on catwalk support is being processed for submittal. Support is to match the method originally used to support other areas of existing catwalk, or an equivalent, so the catwalk will not penetrate the two hour wall.
|
Telephone call | | | 1/14/1997 | | |
|
|
|
TALKED TO SHERRIE AT INTERIOR SYSTEMS, PERMIT READY FEE DUE
|
Plan resubmittals received | | | 1/13/1997 | | |
|
|
|
Received resubmittal from Mark Elliot, principle project architect; Chaz Filanowicz, local architect and Paul Johnson, project construction manager, in response to the correction notes issued after the preliminary plan review.
|
Telephone call | | | 1/7/1997 | | |
|
|
|
Called Paul Johnson of CH2M HILL, project manager for HP#6 remodel, to let him know I had the plans back from other agency review and I need a response from him concerning my plan review to continue the permit process. Paul was not in so I left voice mail message & phone number.
|
Routing - FIRE | 12/24/1996 | | 12/30/1996 | | PASS |
|
|
|
|
Routing - MECHANICAL | 12/18/1996 | | 12/24/1996 | | PASS |
|
|
|
NO REVIEW, FIELD VERIFY PER 337 12/24/96 DAR
|
Plan resubmittals requested | | | 12/18/1996 | | |
|
|
|
Request through formal plan review comments, for answers, clarifications and details from Charles Filanowicz as follow up to letter to Paul Johnson of same firm.
|
Meeting | | | 12/17/1996 | | |
|
|
|
Meeting with Paul Johnson, at my request, to clarify details on plans and to clarify the scope of work under this permit. Paul is preparing new details for those areas in question (see letter to Paul in file) and to submit new sheets for changes made to project scope since plans were submitted in Nov.
|
Plan resubmittals requested | | | 12/17/1996 | | |
|
|
|
Requested information from Paul Johnson in a meeting held this day and then faxed a copy of a letter to him reviewing a portion of the information that we discussed.
|
Routing - PLAN CHECK | 12/16/1996 | | 12/17/1996 | | PEND |
|
|
|
Routing to Fire Dept. for review while waiting for a response to preliminary plan review - 703-96.HP6 letter.
|
Print Pending Permit.LaserJet4 | | | 12/17/1996 | | PASS |
|
|
|
1/14/97 - Changed pend status to pass for processing plans fro permit issuance.
|
Plan assigned to (DRS) | 11/25/1996 | | 12/17/1996 | | PASS |
Dan Stuart
|
|
|
|
Meeting | | | 12/16/1996 | | |
|
|
|
Met with Mark Elliot, Paul Johnson, Bob Garrison & myself to review method for handling submitals for firestop assemblies that do not have a specific tested system in an approved listing directory, such as U.L. First a listed system shall try to be found. If none found then use a fire safety design engineer from the company proposing the fire stop system with information showing their engineered judgement for use of a similar tested system for use in the special case. A system from HILTI was presented for review using putty blocks around the barjoist penetrations. Jim Taite, Hilti Construction Chemicals, fire Protection Engineer, provide a signed copy of the engineering judgement to be used for firestopping the barjoist penetrations of fire rated walls. This is a one time approval for the penetrations of the two hour area separation wall proposed for separating the building based on discussions at project team meetings & building dept. The penetrating bar joist will also be fire sprayed with an approved product for two hour protection and all supporting structure will be protected for the two hour time frame by listed components.
|
Plan routing begun/TENANTS | | | 11/25/1996 | | |
|
|
|
This plan to be reviewed by PLAN CHECK and then routed to FIRE DEPARTMENT.
|
Gay Receipt For Partial Pay | | | 11/22/1996 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/22/1996 | | |
|
|
|
|
Application received | | | 11/22/1996 | | |
|
|
|
|