Case Summary (BLD) | | | 7/1/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/20/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 7/19/2006 | | |
|
|
|
|
Fee Review-notes | 7/14/1998 | | 7/15/1998 | | |
|
|
|
|
FEE REVIEW-NOTES | | | 1/9/1998 | | OK |
|
|
|
|
INSP - Final | 12/29/1997 | 12/29/1997 | 12/29/1997 | | PASS |
|
|
|
Final
|
Permanent Occupancy | | 12/29/1997 | 12/29/1997 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/29/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #7086 issued 12-29-97 to Treasure Valley Psychiatric.
|
INSP - Final | 12/10/1997 | 12/11/1997 | 12/12/1997 | P | NR |
|
|
|
12/12/97 338 - CARD has not been signed by ele or plmg there is a fee du per monica.
|
Routing for occupancy | 12/8/1997 | | 12/8/1997 | | PASS |
|
|
|
Final Occupancy by: Carol A. Montgomery (DR-80-96)
|
PubWorks Occupancy Approval | | | 12/3/1997 | | DONE |
|
|
|
No drainage permit issued. Project complete and inspected by B.Murphy 12/03/97
|
INSP - Final | 11/6/1997 | 11/7/1997 | 11/7/1997 | A | PASS |
Tom Arcoraci
|
|
|
TREASURE VALLEY SIGNED TEMP OCC
|
Routing for occupancy | 11/6/1997 | | 11/6/1997 | | PEND |
|
|
|
Temporary approved by: Carol Montgomery (DR-80-96) Bond posted (Surety) in amount of $1402.00 for ditch tile and landscaping.
|
INSP-Final Inspection | 11/5/1997 | 11/5/1997 | 11/5/1997 | P | PASS |
Joe Tawney
|
|
|
11/05/97 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP-Final Inspection | 10/31/1997 | 11/3/1997 | 11/3/1997 | A | FAIL |
Joe Tawney
|
|
|
11/03/97 406 - TREASURE VALLEY FINAL FAIL EMERG LIGHTS BLDG ADDRESS SPARE SPKLR HEADS
|
INSP-Sprinkler Rough-in/Hydro | 10/30/1997 | 10/31/1997 | 10/31/1997 | A | FAIL |
Joe Tawney
|
|
|
10/31/97 406 - TREASURE VALLEY HYDRO TEST ON FDC PIPING FAIL
|
INSP-Supply line flush | 10/23/1997 | 10/23/1997 | 10/23/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 10/17/1997 | 10/17/1997 | 10/17/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST EXCEPT FOR FDC PIPING
|
INSP - Wall cover | 10/13/1997 | 10/15/1997 | 10/15/1997 | P | PASS |
|
|
|
CEILING GRID made ok with verbal corrections
|
INSP - Framing/Rough-in | 9/9/1997 | 9/9/1997 | 9/9/1997 | P | PASS |
|
|
|
09/09/97 338 - made ok to cover other agencies made ok next visit will b seizmic
|
INSP - Framing/Rough-in | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | NR |
|
|
|
09/04/97 338 - Scheduled by Hello! on 09/03/97 at 09:03:28.DID SAME INSP
|
INSP-Sprinkler Rough-in/Hydro | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | FAIL |
Joe Tawney
|
|
|
09/03/97 406 - SPKLR ROUGH IN NO APPROVED PLANS ON SITE ALSO CONF ON OTH
|
INSP - Framing/Rough-in | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | NR |
|
|
|
09/03/97 338 - OTH-OTHER AGENCIES NOT APPROVED NOT READY
|
INSP - Masonry | 8/1/1997 | 8/4/1997 | 8/4/1997 | A | PASS |
Russ Owen
|
|
|
08/04/97 407 - last lift at the four corners.
|
INSP - Masonry | 7/30/1997 | 7/30/1997 | 7/30/1997 | P | PASS |
|
|
|
07/30/97 338 - made ok r-bar placed
|
INSP - Masonry | 7/30/1997 | 7/30/1997 | 7/30/1997 | | PASS |
|
|
|
/ / 338 - MASN-REBAR OK
|
INSP - Masonry | 7/28/1997 | 7/29/1997 | 7/28/1997 | A | PASS |
|
|
|
07/29/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | PASS |
|
|
|
07/01/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/26/1997 | 6/27/1997 | 6/27/1997 | P | PASS |
|
|
|
06/27/97 338 - made ok with sp insp approvalSTEM WALLS
|
INSP - Footings | 6/26/1997 | 6/26/1997 | 6/26/1997 | P | PASS |
|
|
|
06/26/97 338 - made ok with special insp approval
|
INSP - Footings | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | PASS |
|
|
|
06/24/97 338 - FOOTING REINSPECT north wall/sw and se corners r-bar plac pass of the sp insp ufer ground is in place in the footing
|
INSP - Footings | 6/23/1997 | 6/24/1997 | 6/24/1997 | A | NR |
|
|
|
06/24/97 338 - not ready need sp insp letter/and work to be ready when c
|
(F) Reprint permit | | | 5/27/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/23/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/1997 | | PASS |
|
|
|
|
testing condition printout | | | 5/20/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 5/20/1997 | | 5/20/1997 | | PASS |
|
|
|
PACKAGE #4
|
Print Occupancy Form | | | 5/20/1997 | | |
|
|
|
|
Telephone call | | | 5/20/1997 | | |
|
|
|
CALLED MARK..PERMIT READY
|
Inspection Record Card- Bld | | | 5/20/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 3/31/1997 | | 5/20/1997 | | PASS |
|
|
|
PACKAGE #2
|
Plan assigned to (JCM) | 12/11/1996 | | 5/20/1997 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 12/17/1996 | | 5/20/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - A.C.H.D | 12/2/1996 | | 5/20/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED RICK TOEWS AT ###-#### TO TAKE PLANS OUT TO ACHD IMPACT FEES PAID 5/19/97 - CERTIFICATE #97-1228 - APPROVED PLANS WERE NOT RETURNED FROM ACHD. 5/19/97-4:00 I CONTACTED RICK TOEWS TO REQUEST THAT THE APPROVED PLANS (PACKAGE #4) BE PICKED UP AND DELIVERED TO THE BUILDING DEPARTMENT. JCM PLANS RETURNED TO BUILDING DEPT. KMM 5-20-97
|
Routing - PUBLIC WORKS | 3/27/1997 | | 3/31/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing - PLAN CHECK | 3/11/1997 | | 3/27/1997 | | PEND |
|
|
|
PACKAGE #2
|
Routing - PLAN CHECK | 1/23/1997 | | 3/11/1997 | | PEND |
|
|
|
PACKAGE #2
|
Routing - PUBLIC WORKS | 3/4/1997 | | 3/11/1997 | | FAIL |
|
|
|
PACKAGE #2 NEEDS DRAINAGE PLAN REVISION BM
|
Routing Off Site - STRUCTURAL | 3/4/1997 | | 3/5/1997 | | PASS |
|
|
|
STRUCTURAL PACKAGE #3 WAS SENT TO ATWOOD-HINZMAN-JONES FOR REVIEW OF THE STRUCTURAL RESUBMITTED PLANS AND THE BUTLER STEEL BUILDING PLANS. RECEIVED LETTER APPROVING RESUBMITTED PLANS; BUTLER PLANS AND SPECIFICATIONS WERE NOT RETURNED WITH APPROVAL LETTER.
|
90 day tracking............. | | 11/27/1996 | 2/25/1997 | | |
|
|
|
|
Plan resubmittals received | | | 2/4/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/17/1997 | | 1/22/1997 | | FAIL |
|
|
|
PACKAGE #2 CONTACT WEST BOISE SEWER DIST. FOR PRETREATMENT INFO ###-####. WB
|
Routing - PLANNING | 12/17/1996 | | 1/16/1997 | | PASS |
|
|
|
PACKAGE#2 DR-80-96 WAS HELD FOR REVISED PLANS.
|
Routing - FIRE | 12/16/1996 | | 12/17/1996 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 12/3/1996 | | 12/17/1996 | | FAIL |
|
|
|
PACKAGE #2 REQUIRES DRAINAGE PLAN REVISION. PER BM. KMM
|
Routing - PLAN CHECK | 12/11/1996 | | 12/16/1996 | | PEND |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | | | 12/16/1996 | | PEND |
|
|
|
PRELIMINARY PLAN REVEIW COMPLETED - 12/16/96 A.M. CORRECTION LIST MAILED TO RICK TOEWS AT BRS ARCHITECTS. THE CORRECTION LIST ALSO INCLUDED THE STRUCTURAL COMMENTSS LIST FROM ATWOOD-HINZMAN-JONES.
|
Routing Off Site - STRUCTURAL | 12/2/1996 | | 12/12/1996 | | |
|
|
|
PACKAGE #3 CALLED PDQ TO TAKE PLANS TO ATTWOOD, HINZEMAN, JONES FOR OUT SIDE ENG. KMM
|
Plan assigned to (RGG) | 12/3/1996 | | 12/11/1996 | | |
|
|
|
ASSIGNED TO JOHN M.
|
Routing - MECHANICAL | 12/6/1996 | | 12/11/1996 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FIELD VERIFY ONLY PER 337. DAR 12/11/96
|
Routing - ELECTRICAL | 11/20/1996 | | 12/6/1996 | | PASS |
|
|
|
PACKAGE #1 WILL FIELD VERIFY
|
Routing - PLUMBING | 12/2/1996 | | 12/5/1996 | | PASS |
|
|
|
PACKAGE#1
|
Plan routing begun/NEW & ADDTN | | | 12/2/1996 | | PASS |
|
|
|
|
Received Certificate of Value | | | 11/27/1996 | | PASS |
|
|
|
|
Gay Receipt For Partial Pay | | | 11/27/1996 | | |
|
|
|
|
Application received | | | 11/27/1996 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/27/1996 | | |
|
|
|
|