Fee Review-notes | 7/14/1998 | | 7/22/1998 | | |
|
|
|
|
Letter of compliance | | | 4/23/1998 | | PASS |
|
|
|
Letter of Compliance #15022 issued 4-23-98.
|
INSP-Final Inspection | 2/4/1998 | 2/4/1998 | 2/4/1998 | A | PASS |
Rick Jackson
|
|
|
final inspection conducted a few weeks ago - updating the permit plan computer log.
|
INSP - Final | 2/3/1998 | 2/4/1998 | 2/4/1998 | A | PASS |
Jim Storey
|
|
|
02/04/98 301 - eric ###-#### FNL -OK FINAL engineer of record actceptance of all decrepicies in speci insp. and field c/n reviewed and actcepted by kent soelberg p.e. with rutherford & chekene. all records to this effect archived at city hall w this bld. permi
|
Code Occupancy Approval | | | 1/29/1998 | | PASS |
|
|
|
Made final site inspection, all landscape, parking improvements in.
|
INSP-Final Inspection | 11/25/1997 | 12/1/1997 | 12/1/1997 | A | PART |
Rick Jackson
|
|
|
PARKING GARAGE retest smoke detectors and elevator recall - passed.
|
INSP-Final Inspection | 10/30/1997 | 10/30/1997 | 10/30/1997 | A | PART |
Rick Jackson
|
|
|
temp c/o approved. c/n issued
|
INSP - Final | 10/30/1997 | 10/30/1997 | 10/30/1997 | P | PART |
Jim Storey
|
|
|
10/30/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED TCO -TEMP C OF O ISSUED
|
INSP-Alarm Testing | 10/29/1997 | 10/29/1997 | 10/29/1997 | P | CANC |
Rick Jackson
|
|
|
attempted test of alarm system. contractor not ready due to water (from leak) in panel and phone line problems.
|
INSP - Final | 10/22/1997 | 10/24/1997 | 10/24/1997 | P | FAIL |
Jim Storey
|
|
|
10/24/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED breakway wrong swing.
|
INSP-Final Inspection | 10/22/1997 | 10/24/1997 | 10/24/1997 | A | FAIL |
Rick Jackson
|
|
|
c/n issued. alarm system not ready.
|
INSP-Alarm Testing | 10/23/1997 | 10/23/1997 | 10/23/1997 | P | PART |
Rick Jackson
|
|
|
contractor requests 2:00 pm for generator and alarm tests. generator passed. alarms not ready.
|
Routing for occupancy | 10/23/1997 | | 10/23/1997 | | PEND |
|
|
|
Temporary signed by: Scott M. Brown (DR-79-96, CU-38-96).
|
INSP - Conference | 10/22/1997 | 10/22/1997 | 10/22/1997 | P | PART |
Rick Jackson
|
|
|
FIRING UP GENERATOR/ set up generator test for 10/23 at 2:00 pm.
|
INSP-Conference | 10/7/1997 | 10/7/1997 | 10/7/1997 | A | PART |
Rick Jackson
|
|
|
conference about smoke detector placement for elevators.
|
INSP-Final Inspection | 10/2/1997 | 10/6/1997 | 10/6/1997 | A | PART |
Rick Jackson
|
|
|
architect requested insp for 8:15 - 409 pre-final inspection. reviewed alarm testing, elevator, generator and standpipe requirements.
|
INSP - Wall cover | 9/29/1997 | 9/29/1997 | 9/30/1997 | P | PASS |
Jim Storey
|
|
|
09/30/97 301 - STEEL STUDS FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 9/17/1997 | 9/17/1997 | 9/17/1997 | A | PART |
Tom Arcoraci
|
|
|
shaft wall discussion, elavator shaft and room discussion ok for one side drywall
|
INSP - Framing/Rough-in | 9/2/1997 | 9/3/1997 | 9/3/1997 | A | PART |
Jim Storey
|
|
|
09/03/97 301 - west wall elavator only. ok.
|
INSP - Framing/Rough-in | 8/25/1997 | 8/25/1997 | 8/25/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - pick up reports
|
INSP - Conference | 8/14/1997 | 8/15/1997 | 8/15/1997 | A | NR |
Jim Storey
|
|
|
08/15/97 301 -
|
INSP-Sprinkler Rough-in/Hydro | 8/12/1997 | 8/12/1997 | 8/12/1997 | P | PART |
|
|
|
hydro ok, c/n issued on hose stations standpipe rough-in/ hydro test
|
INSP - Miscellaneous | 8/11/1997 | 8/11/1997 | 8/11/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED fire proofing of steel at col pt cable pre-cut showing signs of rust not to be used with out engineers aproval.
|
INSP - Conference | 7/21/1997 | 7/21/1997 | 7/21/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - conf. work in progess special insp. on site no word as to a special insp. change as per agreement at brgining of the project.
|
INSP - Conference | 7/18/1997 | 7/18/1997 | 7/18/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED weld lengths of pre-cast atchment.oversized holes of steel baseplate posts. special insp. if redu will requier call for requis
|
INSP - Flatwork | 7/17/1997 | 7/17/1997 | 7/17/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - work in progess special insp. on site. pending report for la floor.
|
INSP - Framing/Rough-in | 7/3/1997 | 7/3/1997 | 7/3/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - special insp. on site work in progess
|
INSP - Conference | 6/26/1997 | 6/26/1997 | 6/26/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - pending s.i. report,
|
INSP - Flatwork | 6/19/1997 | 6/19/1997 | 6/19/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - special insp. in progess pending reports
|
INSP - Conference | 6/3/1997 | 6/3/1997 | 6/3/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - WIP -WORK IN PROGRESS RECIEVED SPECIAL INSP. REPORTS
|
INSP - Conference | 4/22/1997 | 4/22/1997 | 4/22/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED resolve to special insp. repo stamped shop on pt. required.
|
INSP - Conference | 3/25/1997 | 3/25/1997 | 3/25/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - WIP -WORK IN PROGRESS
|
INSP - Flatwork | 3/18/1997 | 3/18/1997 | 3/18/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - WIP -WORK IN PROGRESS
|
testing condition printout | | | 3/14/1997 | | |
|
|
|
|
INSP - Conference | 3/10/1997 | 3/11/1997 | 3/11/1997 | A | PASS |
Jim Storey
|
|
|
03/11/97 301 - cover placement and control isues in special insp. qc, ba set of rebar and pt configuration as well as shop drawing from strucuarl engineer.
|
(F) Reprint permit | | | 2/24/1997 | | |
|
|
|
|
INSP - Foundation | 2/20/1997 | 2/21/1997 | 2/21/1997 | P | PART |
Jim Storey
|
|
|
02/21/97 301 - REBAR
|
INSP - Footings | 2/20/1997 | 2/21/1997 | 2/21/1997 | P | PART |
Jim Storey
|
|
|
02/21/97 301 - REBAR WORK IN PROGESS WHAT IS SET IS OK SPECIAL INSP. ON REPORTS.
|
(F) Reprint permit | | | 2/20/1997 | | |
|
|
|
|
Print Occupancy Form | | | 2/18/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/18/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/18/1997 | | |
|
|
|
PAID BY JOURNAL ENTRY BOISE AIR TERMINAL/619607159699506
|
Plan assigned to (JCM) | 12/24/1996 | | 2/14/1997 | | PASS |
John Menard
|
|
|
|
testing condition printout | | | 2/14/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/1997 | | PASS |
|
|
|
|
Routing - FIRE | 1/15/1997 | | 2/3/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Plan resubmittals received | | | 2/3/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/24/1997 | | 1/27/1997 | | PASS |
|
|
|
PACKAGE #2. REQUESTED BY BRAD.
|
Routing - PLAN CHECK | 1/16/1997 | | 1/24/1997 | | |
|
|
|
PACKAGE #2
|
testing condition printout | | | 1/24/1997 | | |
|
|
|
|
Routing - PLANNING | 12/20/1996 | | 1/16/1997 | | PASS |
|
|
|
PACKAGE #2 APPROVED CU-38-96 DR-79-96 RICHARD COOK / TKW
|
Plan resubmittals requested | | | 1/15/1997 | | PEND |
|
|
|
CORRECTION LIST SENT TO GREG ALLEN AT HUMMEL ARCHITECTS FOR REQUESTED PLAN REVISIONS.
|
Routing Off Site - STRUCTURAL | 12/3/1996 | | 1/2/1997 | | PEND |
|
|
|
PACKAGE #3 ON HOLD WAITING STRUCTURAL SHEETS. CONTACTED GREG ALLEN AT ###-#### TO INFORM HIM OF THIS NEED. KMM STRUCTURAL SHEETS RECIEVED FROM GREG ALLEN 1:45 12-03-96 KMM PLANS SENT TO STAPLEY ENGINEERING VIA PDQ KMM CORRECTIONS AND REREVIEW WAS REQUESTED BY STAPLEY ENGINEERING-CONTACT PERSON - CHRISTOPHER B. MERRILL, P.E.
|
Routing - ELECTRICAL | 12/16/1996 | | 12/24/1996 | | PASS |
|
|
|
PACKAGE #1
|
Plan assigned to (RGG) | 12/3/1996 | | 12/24/1996 | | |
|
|
|
FOUR PACKAGE SUBMITTAL
|
Routing - PUBLIC WORKS | 12/3/1996 | | 12/20/1996 | | FAIL |
|
|
|
PACKAGE #2
|
Routing - AIRPORT | 12/18/1996 | | 12/19/1996 | | FAIL |
|
|
|
PACKAGE #2 REVISIONS REQUIRED
|
Routing - PLUMBING | 12/11/1996 | | 12/16/1996 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - A.C.H.D | 12/3/1996 | | 12/11/1996 | | PASS |
|
|
|
PACKAGE #4 ON HOLD WAITING FOR STRUCTURAL SHEETS FOR PACKAGE #4. KMM GREG ALLEN DELIVERED STRUCTURAL SHEETS FOR PACKAGE #4 1:45PM KMM PLANS TAKEN OUT TO ACHD. KMM 12-03-96
|
Routing - MECHANICAL | 12/3/1996 | | 12/11/1996 | | PASS |
|
|
|
PACKAGE #1 FIELD REVIEW ONLY NO PLAN CHECK PER
|
Plan routing begun/NEW & ADDTN | | | 12/3/1996 | | PASS |
|
|
|
|
Received Certificate of Value | | | 11/29/1996 | | PASS |
|
|
|
|
Application received | | | 11/27/1996 | | |
|
|
|
|
Routing - PLAN CHECK | 12/24/1996 | | | | |
|
|
|
|
Routing - PLAN CHECK | 12/11/1996 | | | | |
|
|
|
PACKAGE #4
|
Routing - PLAN CHECK | 1/27/1997 | | | | |
|
|
|
PACKAGE #2
|
Routing - PLAN CHECK | 2/3/1997 | | | | |
|
|
|
PACKAGE #1
|