BLD-Final | 4/2/2001 | 4/2/2001 | 4/2/2001 | A | PASS |
Tony Young
|
|
|
Added by Inspector: 415 On 4/2/2001 11:38:09 AM
|
Plan resubmittals received | | | 9/5/2000 | | PASS |
|
|
|
Shell plan resubmittal received changing second floor rated corridor to a NON-RATED Exit Corridor per UBC Section 1004.3.4.3 Exception #5. (Office space floor occupant load of 100 or less and a fully fire sprinklered building.)
|
BLD-Final | 8/24/2000 | 8/25/2000 | 8/25/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 13:45:51. Contact: ###-####.
C/N left on site w/ contractor. met w/ 338, project not built per approved plans,( upper corridor) 8/25/2000 4:47:56 PM
|
BLD-Final | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 13:23:34. Contact: ###-####. need to answer the last c/n 8/17/2000 3:26:37 PM
|
BLD-Final | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | NH |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 12:10:22. Contact: ###-####.
|
INSP - Framing/Rough-in | 9/14/1998 | 9/14/1998 | 9/14/1998 | P | PASS |
Wes Worcester
|
|
|
09/14/98 342 - BOB ###-#### FR-INSP LATE PM IF POSSIBLE?
|
INSP - Final | 8/11/1998 | 8/11/1998 | 8/11/1998 | P | NR |
Carl Dependahl
|
|
|
rec'd eng's letter re spec. insp reports...ok. 342 area.
|
INSP - Final | 8/5/1998 | 8/5/1998 | 8/5/1998 | P | FAIL |
Carl Dependahl
|
|
|
still need eng's letter, firestops, & resolution to 1st fl corridor...spoke w/ Dan Johnson of BRS.
|
INSP - Final | 7/22/1998 | 7/22/1998 | 7/23/1998 | P | FAIL |
Carl Dependahl
|
|
|
07/22/98 340 - need p&z, struct for shell final c/n...need 1st fl corridor, firestops, etc
|
INSP - Final | 7/22/1998 | 7/22/1998 | 7/22/1998 | P | FAIL |
Carl Dependahl
|
|
|
07/22/98 340 - gene benton ###-#### c...need p&z, etc.
|
INSP - Final | 7/22/1998 | 7/22/1998 | 7/22/1998 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - SHELL ONLY, NEED P&Z, STRUCT OK'S. C/N
|
INSP - Framing/Rough-in | 3/18/1998 | 3/19/1998 | 3/19/1998 | A | PART |
Wes Worcester
|
|
|
03/19/98 342 - ###-####--THEY ONLY WORK UNTIL 3:00...deflection tract no cover corridor wall, called dan about plan change
|
INSP - Framing/Rough-in | 3/18/1998 | 3/18/1998 | 3/18/1998 | P | NH |
Wes Worcester
|
|
|
03/18/98 342 - partial inspection dan ###-#### reinspection
|
INSP - Framing/Rough-in | 3/17/1998 | 3/17/1998 | 3/17/1998 | P | NR |
Wes Worcester
|
|
|
03/17/98 342 - PARTIAL METAL STUD--DAN PAGER ###-####
|
INSP - Final | 3/4/1998 | 3/5/1998 | 3/5/1998 | A | FAIL |
Wes Worcester
|
|
|
/ / 342 - ###-#### Dan need address numbers
|
INSP-Final Inspection | 3/5/1998 | 3/5/1998 | 3/5/1998 | A | PASS |
Rick Jackson
|
|
|
address still needed, Wes will verify at his inspection. alarms monitored and tested okay. dampers operated properly. smoke detector in elevator shaft will be removed.
|
INSP - Framing/Rough-in | 1/23/1998 | 1/26/1998 | 1/26/1998 | P | NR |
Wes Worcester
|
|
|
01/26/98 342 - YOU SCHEDULED THIS FOR 1:30--JEAN--###-####
|
INSP - Final | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | NR |
Wes Worcester
|
|
|
01/15/98 342 - MARK WILL CALL TO SCHEDULE A TIME..PROBLEMS CALL PAGER AT
|
INSP - Conference | 1/15/1998 | 1/15/1998 | 1/15/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - need detail for fire stopping at flutes above corridor wall
|
Code Occupancy Approval | | | 1/15/1998 | | PEND |
|
|
|
Temporary Occupancy Requested: Mark-###-####.
|
INSP-Final Inspection | 12/8/1997 | 12/9/1997 | 12/9/1997 | P | FAIL |
Rick Jackson
|
|
|
HYDROSTATIC TEST AND ALARMS/ WOULD LIKE AROUND 1:00 hydro/flow passed. alarms tested for shell. told gen con that fire can't sign off until alarms/sprinkler are monitored.
|
INSP - Framing/Rough-in | 10/31/1997 | 10/31/1997 | 10/31/1997 | P | PASS |
Wes Worcester
|
|
|
10/31/97 342 - chase draft stop ok
|
INSP - Framing/Rough-in | 10/16/1997 | 10/17/1997 | 10/17/1997 | A | PART |
Wes Worcester
|
|
|
10/16/97 342 -
|
INSP - Framing/Rough-in | 10/14/1997 | 10/15/1997 | 10/15/1997 | A | PART |
Wes Worcester
|
|
|
10/15/97 342 - 8:30 AM APPOINTMENT
|
INSP - Conference | 10/8/1997 | 10/8/1997 | 10/8/1997 | A | PART |
Wes Worcester
|
|
|
roof membrane is designed to flex and gwb is tight to deck for corridor 1 hr const. need flex 1 hr assy
|
INSP - Framing/Rough-in | 10/8/1997 | 10/8/1997 | 10/8/1997 | P | CANC |
Wes Worcester
|
|
|
CANCELLED INSPECTION
|
INSP - Framing/Rough-in | 10/1/1997 | 10/2/1997 | 10/2/1997 | A | FAIL |
Wes Worcester
|
|
|
METAL STUDS....1 HR WALL PENETRATIONS NEED TO BE ADDRESSED
|
INSP - Carpentry | 9/30/1997 | 10/1/1997 | 10/1/1997 | A | PART |
Wes Worcester
|
|
|
TRASH ENCLOSURE/ MASONARY WALL...cells grouted w/o inspection, cells were grouted flush to top, super verified rebar in bond beam and stated it was not structural so special inspector was not called. I asked to be called in the future on any cell w/rebar.
|
INSP-Sprinkler Rough-in/Hydro | 9/25/1997 | 9/25/1997 | 9/25/1997 | P | FAIL |
Rick Jackson
|
|
|
underground leak
|
INSP - Footings | 8/15/1997 | 8/18/1997 | 8/20/1997 | P | PART |
Wes Worcester
|
|
|
08/20/97 342 - rebar for slab on deck on roof
|
INSP - Framing/Rough-in | 8/1/1997 | 8/5/1997 | 8/5/1997 | A | NR |
Wes Worcester
|
|
|
08/04/97 342 - REBAR ON DECK not placed.....special inspector on site at
|
INSP - Framing/Rough-in | 8/5/1997 | 8/5/1997 | 8/5/1997 | | NR |
Wes Worcester
|
|
|
/ / 342 - deck rebar still not ready
|
INSP - Framing/Rough-in | 8/5/1997 | 8/5/1997 | 8/5/1997 | | NR |
Wes Worcester
|
|
|
/ / 342 - deck rebar still not ready
|
INSP - Flatwork | 8/5/1997 | 8/5/1997 | 8/5/1997 | | NH |
Wes Worcester
|
|
|
/ / 342 - no special inspector on site....no super or project mgr on s
|
INSP - Flatwork | 8/5/1997 | 8/5/1997 | 8/5/1997 | | NH |
Wes Worcester
|
|
|
/ / 342 - no special inspector on site....no super or project mgr on s
|
INSP - Framing/Rough-in | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | PART |
Jim Storey
|
|
|
07/25/97 301 - METAL DECK WELDING INSPECTION SAID HE TALKED TO YOU AND Y covered by special insp. report pending.
|
INSP - Masonry | 7/16/1997 | 7/17/1997 | 7/17/1997 | P | PART |
|
|
|
07/17/97 333 - WELDING STEEL SPECIAL INSPECTOR ON JOB SITE. ok pending specila insp reports
|
INSP - Masonry | 7/8/1997 | 7/9/1997 | 7/9/1997 | A | PASS |
|
|
|
07/09/97 333 - pending special insp report
|
INSP - Masonry | 7/2/1997 | 7/7/1997 | 7/7/1997 | A | PART |
Wes Worcester
|
|
|
REBAR special inspector on site, ok to last lift
|
INSP - Masonry | 7/3/1997 | 7/3/1997 | 7/3/1997 | P | PART |
Wes Worcester
|
|
|
went by in am and special inspectore will be on site
|
INSP - Masonry | 7/1/1997 | 7/2/1997 | 7/2/1997 | A | PASS |
|
|
|
07/02/97 333 - pending specilal insp reports
|
INSP - Masonry | 7/2/1997 | 7/2/1997 | 7/2/1997 | P | PART |
Wes Worcester
|
|
|
special inspector to update log, poured 4' lift, spec insp on site
|
INSP - Masonry | 6/26/1997 | 6/27/1997 | 6/27/1997 | A | PASS |
|
|
|
06/27/97 333 - pending special inspection reports
|
INSP - Masonry | 6/24/1997 | 6/25/1997 | 6/25/1997 | A | FAIL |
|
|
|
06/25/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPL
|
INSP - Masonry | 6/23/1997 | 6/24/1997 | 6/24/1997 | A | PART |
Tom Arcoraci
|
|
|
REBAR OK PER SPEC INSPEC
|
INSP - Footings | 6/12/1997 | 6/13/1997 | 6/13/1997 | P | PASS |
Jim Storey
|
|
|
06/13/97 301 - ALSO SLAB ON GRADE. FDN -OK FOUNDATION COVERED W/SPECIAL INSP.
|
INSP - Foundation | 6/4/1997 | 6/6/1997 | 6/6/1997 | A | PART |
Jim Storey
|
|
|
06/06/97 301 - COVERED WITH SPECIAL INSP. PENDING REPORT.
|
INSP - Footings | 6/2/1997 | 6/3/1997 | 6/3/1997 | A | PART |
Jim Storey
|
|
|
06/03/97 301 - early a.m. WIP -WORK IN PROGRESS COVERED UNDER SPECIAL INSP.
|
INSP - Foundation | 5/29/1997 | 6/2/1997 | 6/2/1997 | A | PART |
Jim Storey
|
|
|
06/02/97 301 - COVEDER WITH SPECIAL INSP.
|
INSP - Footings | 5/29/1997 | 5/30/1997 | 5/30/1997 | A | PART |
Jim Storey
|
|
|
05/30/97 301 - FRMS-OK FORMS-REBAR SPECIAL INSP REQ.
|
INSP - Footings | 5/23/1997 | 5/27/1997 | 5/27/1997 | P | PART |
Jim Storey
|
|
|
05/27/97 301 - COVERED UNDER SPECIAL INSP.
|
INSP - Footings | 5/21/1997 | 5/22/1997 | 5/22/1997 | P | PART |
Jim Storey
|
|
|
05/22/97 301 - COVERED BY SPECIAL INSP BAR OK WORK IN PROGESS
|
(F) Reprint permit | | | 5/14/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/13/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/12/1997 | | |
|
|
|
|
Print Occupancy Form | | | 5/12/1997 | | |
|
|
|
|
Telephone call | | | 5/12/1997 | | PASS |
|
|
|
PAM SAYS SHE WILL HAVE SOMEONE COME AND GET IT.
|
Plan assigned to (JCM) | 12/23/1996 | | 5/9/1997 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 12/27/1996 | | 5/9/1997 | | PASS |
|
|
|
PACKAGE #3
|
Routing - PLAN CHECK | 3/6/1997 | | 5/9/1997 | | PASS |
|
|
|
package #1
|
Routing - PLAN CHECK | 3/7/1997 | | 5/9/1997 | | PASS |
|
|
|
PACKAGE #2
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/1997 | | PASS |
|
|
|
|
testing condition printout | | | 5/9/1997 | | |
|
|
|
|
testing condition printout | | | 5/9/1997 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 12/5/1996 | | 5/8/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED DAN JOHNSON AT ###-#### TO TAKE PLANS OUT TO ACHD. KMM IMPACT FEES PAID 04/23/97 CERT. #97-1068 JCM PACKAGE #4 IS STILL AT A.C.H.D..
|
Received Certificate of Value | | | 5/2/1997 | | PASS |
|
|
|
RECEIVED CERTIFICATE OF VALUE AND NAME OF CONTRACTOR (KREIZENBECK CONSTRUCTORS)
|
Telephone call | | | 3/10/1997 | | PASS |
|
|
|
CALLED DAN JOHNSON, AT BRS ARCHITECTS, TO NOTIFY HIM THAT APPROVALS HAD BEEN DONE AND THAT THE PERMIT WOULD BE READY TO ISSUE AFTER THE CONTRACTOR HAD BEEN CHOSEN, A NEW CERTIFICATE OF VALUE WAS SUBMITTED AND THE ACHD IMPACT FEES HAD BEEN PAID.
|
Routing - PUBLIC WORKS | 3/4/1997 | | 3/7/1997 | | |
|
|
|
PACKAGE #2
|
Routing - FIRE | 3/4/1997 | | 3/6/1997 | | PASS |
|
|
|
PACKAGE #1
|
90 day tracking............. | | 12/4/1996 | 3/4/1997 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 2/24/1997 | | 3/4/1997 | | PEND |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 12/24/1996 | | 3/4/1997 | | PEND |
|
|
|
PACKAGE #2
|
Routing - FIRE | 2/11/1997 | | 2/22/1997 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 1/8/1997 | | 2/14/1997 | | PEND |
|
|
|
package #1
|
Plan resubmittals received | | | 2/14/1997 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 2/11/1997 | | PEND |
|
|
|
FAXED DAN JOHNSON AT BRS A REQUESTED FOR REVISED FIRE-RESISTIVE ASSEMBLIES FOR THE SPRAYED APPLIED FIREPROOFING.
|
Plan resubmittals received | | | 2/10/1997 | | PEND |
|
|
|
|
Routing - FIRE | 1/3/1997 | | 1/8/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 12/19/1996 | | 1/3/1997 | | |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | | | 1/2/1997 | | PEND |
|
|
|
CORRECTION LIST SENT TO ARCHITECT FOR REQUESTED REVISIONS.
|
Routing Off Site - STRUCTURAL | 12/5/1996 | | 12/27/1996 | | |
|
|
|
PACKAGE #3 PLANS TAKEN TO ATWOOD, HINZEMAN, AND JONES VIA PDQ FOR OUT SIDE ENGINEERING.
|
Routing - PLANNING | 12/13/1996 | | 12/24/1996 | | PASS |
|
|
|
PACKAGE #2 X-ref: DR-110-96. Approved by MGH.
|
Plan assigned to (RGG) | 12/5/1996 | | 12/23/1996 | | |
|
|
|
|
Routing - MECHANICAL | 12/12/1996 | | 12/19/1996 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FIELD VERIFY
|
Routing - PUBLIC WORKS | 12/5/1996 | | 12/12/1996 | | FAIL |
|
|
|
PACKAGE #2 REQUIRES PROOF OF LEGAL LAND DIVISION.
|
Routing - PLUMBING | 12/9/1996 | | 12/11/1996 | | PASS |
|
|
|
PACKAGE #1
|
Routing - ELECTRICAL | 12/5/1996 | | 12/9/1996 | | PASS |
|
|
|
PACKAGE #1
|
Plan routing begun/NEW & ADDTN | | | 12/5/1996 | | PASS |
|
|
|
|
Received Certificate of Value | | | 12/4/1996 | | PASS |
|
|
|
WAITING FOR A SIGNED CERT. OF VALUE. CONTACED DAN JOHNSON AT ###-#### AND TOLD HIM OF THIS NEED. KMM RECEIVED SIGNED CERT. OF VALUE 10:45 12-05-96 KMM
|
Recd Pcfee & Taken To Pln CK | | | 12/4/1996 | | PEND |
|
|
|
|
Application received | | | 12/4/1996 | | |
|
|
|
|
Gay Receipt For Partial Pay | | | 12/4/1996 | | |
|
|
|
|
INSP - Masonry | 7/2/1997 | 7/3/1997 | 7/3/1907 | A | PART |
Wes Worcester
|
|
|
REBAR
|
Print permit w/o conditions | | | | | |
|
|
|
|