Permanent occupancy | | | 12/9/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7529 issued 12-9-98 to Timberline High School (additions).
|
Permanent Occupancy | | 11/30/1998 | 11/30/1998 | | DONE |
|
|
|
|
SUPER- Supervisor's review | 10/8/1998 | 10/7/1998 | 10/7/1998 | | |
|
|
|
reviewed final letter from engineer archiving so that varification of acceptance of special inspection can be varified.
|
INSP - Final | 10/7/1998 | 10/7/1998 | 10/7/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - achrived final letter from engineer of reccord and special i
|
CHANGE STATUS TO (I) | | | 10/7/1998 | | |
|
|
|
|
Receive PAYMENT IN FULL | | | 9/28/1998 | | |
|
|
|
|
INSP-Final Inspection | 9/10/1998 | 9/10/1998 | 9/10/1998 | P | PASS |
Rick Jackson
|
|
|
KEITH ###-#### occ approved
|
INSP - Final | 9/10/1998 | 9/10/1998 | 9/10/1998 | P | PASS |
Jim Storey
|
|
|
09/10/98 301 - keith ###-#### FNL -OK FINAL
|
INSP-Final Inspection | 9/8/1998 | 9/9/1998 | 9/9/1998 | P | FAIL |
Rick Jackson
|
|
|
KEITH ###-#### FN PER RICK AT 3:00 no access for dampers - retest after doors installed
|
(F) Reprint permit | | | 9/9/1998 | | |
|
|
|
|
(F) Reprint permit | | | 9/8/1998 | | |
|
|
|
|
CHANGE STATUS TO (F) | | | 9/8/1998 | | |
|
|
|
|
(F) Reprint permit | | | 9/8/1998 | | |
|
|
|
|
Fee Review-notes | 9/8/1998 | | 9/8/1998 | | FEES |
|
|
|
INITIAL VALUE 5,038,097.00 FINAL VALUE 5,132,261.00 DIFFERECE WITH SUB.. 138,065.00 TOTAL OF 232,229.00 LH
|
(F) Reprint permit | | | 9/8/1998 | | |
|
|
|
|
INSP - Final | 8/28/1998 | 8/28/1998 | 8/28/1998 | | PART |
Jim Storey
|
|
|
08/28/98 301 - TEMP OCC /KEITH ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OK FOR TEMP OCC. ON GYM AND 2 FLOOR CLASS ROMMS ONLY. A2.1 IS NOT TO BE OCCUPIED AND HAS SEPERATE OCC
|
INSP-Final Inspection | 8/20/1998 | 8/20/1998 | 8/20/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved for gym/classroom only. strobes in classrooms 301 and 307 need repair
|
INSP - Final | 8/18/1998 | 8/18/1998 | 8/18/1998 | P | FAIL |
Jim Storey
|
|
|
08/18/98 301 - Scheduled by Hello!. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
Code Occupancy Approval | | | 8/18/1998 | | PASS |
|
|
|
SITE HAS 4 AREAS PERTAINING TO PLANNING, PARKING, BUILDING ADDITIONS AND A SPORT COMPLEX, ALL LANDSCAPE IN PER PLANS BUT SOME TREES WERE PLANTED WHILE TEMPS WERE HIGH, THEY HAVE A FEW GREEN LEAVES BUT IT IS NOT CLEAR IF THEY WILL LAST A YEAR, I NOTIFIED BUILDER OF THIS AND HE INFORMED ME IF THEY DIE THEY WOULD BE REPLACED, I SIGNED OFF ON THE ADDITIONS AS THEY ARE COMPLETE AND PARKING IS PROVIDED FOR IN COMPLIANCE WITH THE CODE, AS FOR THE SPORT COMPLEX, SEVERAL TREES ARE MISSING AND ARE TO BE PLANTED LATER. I GAVE CONTRACTOR COPY OF OUR BONDING INFO SHEET AND HE WILL CALL FOR THIS INSPECTION/ SIGOFF AT A LATER DATE.
|
INSP - Final | 8/5/1998 | 8/6/1998 | 8/6/1998 | P | PASS |
Jim Storey
|
|
|
08/06/98 301 - stage curtin release test 21 sec meets code and listing f verified 165* assembley approved.
|
INSP-Final Inspection | 8/6/1998 | 8/6/1998 | 8/6/1998 | P | PART |
Rick Jackson
|
|
|
tested stage curtain - 21 second drop time. installed per manufacturers instructions.
|
INSP-Sprinkler Rough-in/Hydro | 7/22/1998 | 7/23/1998 | 7/23/1998 | P | PASS |
Rick Jackson
|
|
|
doug ###-#### hydro and rough-in for auditorium - NE riser hydro okay. gaurds still needed in pit area (auditorium).
|
INSP - Framing/Rough-in | 7/15/1998 | 7/16/1998 | 7/16/1998 | A | PASS |
Jim Storey
|
|
|
07/16/98 301 - Scheduled by Hello!. FRAM-OK FRAMING ceilling at adatormum north east corner ok for cover at exterior vestabual. ì
|
INSP - Framing/Rough-in | 7/8/1998 | 7/9/1998 | 7/9/1998 | A | FAIL |
Jim Storey
|
|
|
07/09/98 301 - Scheduled by Hello!. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED stair internint hand rail req
|
INSP - Framing/Rough-in | 7/2/1998 | 7/2/1998 | 7/3/1998 | P | PART |
|
|
|
07/02/98 333 - bathrooms ok
|
INSP - Framing/Rough-in | 6/29/1998 | 6/30/1998 | 6/30/1998 | A | PART |
|
|
|
framing ok insp. done 6/29/98 301 c/n posted for insp. at ceilling.
|
INSP - Framing/Rough-in | 6/24/1998 | 6/25/1998 | 6/26/1998 | P | PART |
Jim Storey
|
|
|
06/24/98 301 - Scheduled by Hello!. FRAM-OK FRAMING
|
INSP-Alarm Testing | 6/16/1998 | 6/16/1998 | 6/16/1998 | P | FAIL |
Rick Jackson
|
|
|
wrong strobes (15/75 instead of 75) in numerous areas. c/n issued with list of items needed for temp occ.
|
INSP-Final Inspection | 6/12/1998 | 6/15/1998 | 6/15/1998 | P | NR |
Rick Jackson
|
|
|
FINAL READY AT 1 DOUG/ ###-#### N.PAGER NR for alarm test. conducted rough-in of auditorium and associated rooms - not complete. alarm test scheduled for 6/16 by electrical contractor
|
INSP - Framing/Rough-in | 6/8/1998 | 6/9/1998 | 6/9/1998 | A | PART |
Jim Storey
|
|
|
06/09/98 301 - entry to adatorum fire rated const. and opening ok
|
INSP - Framing/Rough-in | 5/15/1998 | 5/18/1998 | 5/18/1998 | A | PASS |
Jim Storey
|
|
|
05/18/98 301 - recieved resubmital for detail e1/bs7.3 to reduce welding
|
INSP - Framing/Rough-in | 5/13/1998 | 5/14/1998 | 5/14/1998 | A | FAIL |
Jim Storey
|
|
|
05/14/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED welds at curti
|
INSP - Framing/Rough-in | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Jim Storey
|
|
|
05/05/98 301 - FRAM-OK FRAMING strucral wall east side of audatotim
|
INSP - Framing/Rough-in | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | PASS |
Jim Storey
|
|
|
05/05/98 301 - FRAM-OK FRAMING struc. east of adatoraum
|
INSP - Framing/Rough-in | 4/28/1998 | 4/28/1998 | 4/28/1998 | A | PART |
Jim Storey
|
|
|
04/28/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok for celling
|
INSP - Framing/Rough-in | 4/27/1998 | 4/27/1998 | 4/28/1998 | P | PASS |
Jim Storey
|
|
|
04/27/98 301 - SCLG-OK SUSPENDED CEILING
|
INSP-Sprinkler Rough-in/Hydro | 4/22/1998 | 4/22/1998 | 4/22/1998 | A | PASS |
Rick Jackson
|
|
|
rough-in for gym and class areas. okay to cover with tiles. told contractor to leave access for dampers.
|
INSP-Sprinkler Rough-in/Hydro | 4/21/1998 | 4/21/1998 | 4/21/1998 | | PART |
|
|
|
witnessed at 205 after 2 hrs...pump was left connected during test. told Doug NOT to do this again. Not testing from control valve to system connection.
|
INSP-Final Inspection | 4/21/1998 | 4/21/1998 | 4/21/1998 | P | CANC |
Joe Tawney
|
|
|
04/21/98 406 - doug ###-#### pager put in your number CANCELLED TO BE DONE BY 405
|
INSP - Framing/Rough-in | 4/13/1998 | 4/13/1998 | 4/14/1998 | P | FAIL |
Jim Storey
|
|
|
04/13/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETEDOTHER INSP. REQ
|
Print Occupancy Form | | | 4/10/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 3/25/1998 | 3/26/1998 | 3/26/1998 | A | PART |
Jim Storey
|
|
|
03/26/98 301 - STEEL STUDED FOR AUDITORIUM RADIUS-WES ###-#### VOICE PAGER 10:00 appointment with arch. discuss fire door isue framing ok at west s
|
INSP - Framing/Rough-in | 3/18/1998 | 3/19/1998 | 3/20/1998 | A | PART |
Jim Storey
|
|
|
03/20/98 301 - ceiling inspection wes ###-#### pager south entry ok for cover and west stair at landing
|
INSP-Sprinkler Rough-in/Hydro | 3/19/1998 | 3/19/1998 | 3/19/1998 | P | PART |
Rick Jackson
|
|
|
DOUG PAGER ###-####--LES BOIS--HE WILL CALL YOU rough-in only. okay to cover 1st floor corridor and stairwell.
|
INSP - Framing/Rough-in | 2/23/1998 | 2/24/1998 | 2/24/1998 | P | FAIL |
Jim Storey
|
|
|
02/24/98 301 - wes cell ###-#### grid ceiling insp
|
INSP - Framing/Rough-in | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | NR |
Bob Archibald
|
|
|
###-#### HARD CEILING
|
INSP - Framing/Rough-in | 2/11/1998 | 2/12/1998 | 2/12/1998 | A | PART |
Jim Storey
|
|
|
02/11/98 301 - WES PAGER ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to proceed can verify at n insp.
|
INSP-Sprinkler Rough-in/Hydro | 2/4/1998 | 2/5/1998 | 2/5/1998 | A | PASS |
Rick Jackson
|
|
|
02/05/98 409 - READY AT 11:00--DOUG AT ###-#### PAGER approved sprinkler plans on site. completed hydro and rough-in.
|
INSP - Framing/Rough-in | 2/4/1998 | 2/5/1998 | 2/5/1998 | A | PASS |
Jim Storey
|
|
|
02/05/98 301 - CEILING IN DOWNSTAIR HARD LID AREAS--WES AT ###-#### PAGE FRAM-OK FRAMING /pending mti fireproofing approval.
|
INSP - Conference | 2/2/1998 | 2/2/1998 | 2/2/1998 | | PART |
Jim Storey
|
|
|
/ / 301 - fire stopping for 2hr area wall submital not complet work is requier investagation of proper assembly upon submital of product listin contractor and bldg. dept..// fire stopping for one hour roof/ceilling assembly not done at this t
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/22/1998 | P | PART |
Jim Storey
|
|
|
01/21/98 301 - ###-#### WES\LES BOIS HIGH SCHOOL trans to tom he called and said that gyp nailling ok
|
INSP - Framing/Rough-in | 1/14/1998 | 1/15/1998 | 1/15/1998 | A | PART |
Jim Storey
|
|
|
01/14/98 301 - LES BOIS JUNIOR HIGH--KEITH ###-#### 2nd floor class rooms and coridor ok for cover up to stairs. drinking fo and door assem. not instaled or insp for membrane penatrations of corido
|
INSP - Framing/Rough-in | 1/8/1998 | 1/13/1998 | 1/13/1998 | A | PART |
Jim Storey
|
|
|
01/13/98 301 - rein WIP -WORK IN PROGRESS ok to gyp corrodor one side before reinsp.
|
INSP - Wall cover | 1/7/1998 | 1/8/1998 | 1/9/1998 | A | PART |
Russ Owen
|
|
|
01/08/98 407 - Went with 301 to job and left corrections.
|
INSP - Framing/Rough-in | 1/8/1998 | 1/8/1998 | 1/8/1998 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to one side only.
|
INSP - Framing/Rough-in | 12/19/1997 | 12/19/1997 | 12/19/1997 | | PART |
Jim Storey
|
|
|
12/19/97 301 - 2 nd floor gym rated ceilling and shafts ok all but 2 wer flue.
|
INSP - Framing/Rough-in | 12/19/1997 | 12/19/1997 | 12/19/1997 | | PART |
Jim Storey
|
|
|
12/19/97 301 - 2 nd floor gym rated ceilling and shafts ok all but 2 wer flue.
|
INSP - Framing/Rough-in | 12/18/1997 | 12/18/1997 | 12/18/1997 | P | PART |
Jim Storey
|
|
|
12/18/97 301 - 2 hr celling work in progess.
|
INSP - Conference | 8/18/1997 | 8/18/1997 | 8/18/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - meet with special insp. and decused the out standing reports recieved. jan welsh w/ staply engeering, special insp. and myself to mee site as soon as fix for all isues is perposed. pending
|
INSP - Foundation | 7/3/1997 | 7/3/1997 | 7/3/1997 | P | PART |
Jim Storey
|
|
|
07/03/97 301 - pouring at 11:30placed with special insp. pending report.
|
INSP - Framing/Rough-in | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | CANC |
Jim Storey
|
|
|
07/01/97 301 - drain thumps???? He will call you public works insp.
|
INSP - Foundation | 6/30/1997 | 6/30/1997 | 6/30/1997 | P | PART |
Jim Storey
|
|
|
06/30/97 301 - pouring at 2 o'clock covered by special insp. pewnding report
|
INSP - Footings | 6/27/1997 | 6/27/1997 | 6/27/1997 | P | PART |
Jim Storey
|
|
|
06/27/97 301 - REBAR EARLY PM POURING AT 2 P.M. FRMS-OK FORMS-REBAR covered by special insp report pending.
|
Issue PAID IN FULL permit | | | 6/11/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/9/1997 | | |
|
|
|
|
Telephone call | | | 6/9/1997 | | |
|
|
|
TOLD SCOTT PERMIT READY ###-####
|
Print Occupancy Form | | | 6/9/1997 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/1997 | | PASS |
|
|
|
|
Plan assigned to (M_O) | 2/18/1997 | | 6/6/1997 | | PASS |
|
|
|
|
Routing - FIRE | 3/8/1997 | | 4/4/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/6/1997 | | 3/28/1997 | | PASS |
|
|
|
SENT ONE OF THE FILE SETS TO ATTWOOD, HINZMAN, JONES FOR REVIEW. THIS SET NEEDS TO BE RETURNED UPON COMPLETION OF REVIEW. MO
|
Plan Reviewer's activity | | | 3/27/1997 | | PEND |
|
|
|
RESUBMITTALS OK BUT STILL HAVE NOT RECEIVED STRUCTURAL REVIEW COMMENTS. PLAN TO GO TO FIRE. MO
|
Plan resubmittals received | | | 3/21/1997 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 3/18/1997 | | 3/21/1997 | | PASS |
|
|
|
|
90 day tracking............. | | 12/17/1996 | 3/17/1997 | | |
|
|
|
|
Routing - FIRE | 3/6/1997 | | 3/7/1997 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 3/6/1997 | | FAIL |
|
|
|
Had meeting with architect on 3-5-97 went over correction list. MO
|
Plan assigned to (RGG) | 12/20/1996 | | 2/18/1997 | | |
|
|
|
|
Routing - MECHANICAL | 2/5/1997 | | 2/6/1997 | | PASS |
|
|
|
NO RREVIEW, FIELD VERIFY ONLY PER MECHANICAL DIVISION
|
Routing - PLUMBING | 1/31/1997 | | 2/4/1997 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/13/1997 | | 1/31/1997 | | FAIL |
|
|
|
GYMNASIUM PASS, SPORTS COMPLEX FAIL-01/31/97
|
Routing Off Site - A.C.H.D | 1/3/1997 | | 1/10/1997 | | PASS |
|
|
|
|
Routing Off Site - C.D.H | 12/23/1996 | | 1/3/1997 | | PASS |
|
|
|
CALLED SCOTT HENSON TO TAKE PLANS TO CDH. ###-####
|
Plan routing begun/NEW & ADDTN | | | 12/20/1996 | | PASS |
|
|
|
|
Routing - PLANNING | 12/20/1996 | | 12/20/1996 | | PASS |
|
|
|
X-ref CU-151-91/mod. Approved by RC.
|
Plan assigned to (MYS) | 12/17/1996 | | 12/20/1996 | | PEND |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 12/18/1996 | | PASS |
|
|
|
|
Application received | | | 12/17/1996 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/17/1996 | | |
|
|
|
|
Gay Receipt For Partial Pay | | | 12/17/1996 | | |
|
|
|
|
Routing - ELECTRICAL | 2/6/1997 | | 2/14/1907 | | PASS |
|
|
|
NO PLAN REVIEW FIELD REVIEW ONLY PER 324
|