VISTA & TARGEE OFFICE/RETAIL COMPLEX BLDG B * (SHELL BUILDING ONLY) TO CONSTRUCT A NEW 22,360 SQ.FT. SINGLE STORY, CONCRETE TILT-UP, TYPE II NONRATED, FULLY FIRE SPRINKLERED, MULTI TENANT, RETAIL/OFFICE SPACE. THE FUTURE RETAIL AREA IS APPROXIMATELY 12,896 SQ.FT. IN AREA, THE FUTURE OFFICE AREA IS APPROXIMATELY 7,576 SQ.FT.IN AREA, APPROXIMATELY 1,728 SQ.FT.IS COVERED ROOF AREA. ALL CONSTRUCTION PER THE APPROVED PLANS ATTACHED COMMENT LIST, CABO/ANSI STANDARDS AND THE 1994 EDITION OF THE UBC. THIS PERMIT DOES NOT ALLOW FOR OCCUPANCY OF THE BUILDING, A SEPARATE PERMIT AND CERTIFICATE OF OCCUPANCIES MUST BE OBTAINED FOR EACH TENANT IMPROVEMENT SPACE. MJP (PC#009-97) DR#128-96
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/8/1997 PASS
Letter of Compliance #13618 issued 12-8-97.
INSP - Final11/25/199711/26/199711/26/1997APART
DetailsJim Storey
11/26/97 301 - READY AT 12:00 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED p.w. sign off required. c/n f relocation of heating units and all others to have prem occ. sign off.
INSP-Final Inspection11/25/199711/26/199711/26/1997APASS
DetailsRick Jackson
11/26/97 409 - PLEASE COME BY AT 11:00 passed shell. sprinkler test passed.
Routing for occupancy11/26/1997 11/26/1997 PASS
Final signed on this bldg. permit only. X-Ref/DR-128-96
INSP-Final Inspection11/25/199711/25/199711/25/1997PCANC
DetailsRick Jackson
rescheduled for 11/26
INSP - Final11/24/199711/25/199711/25/1997PCANC
DetailsJim Storey
11/25/97 301 - cancled by pat.
INSP - Framing/Rough-in8/29/19978/29/19978/29/1997PPASS
DetailsJim Storey
08/29/97 301 - roof framing ok
INSP-Supply line flush8/18/19978/18/19978/18/1997APASS
Details
eric/tvfp rough-in ok, storefront to have dry pendants, south row will be dropped below truss obstruction on ti
90 day tracking............. 1/10/19974/10/1997
(F) Reprint permit  4/10/1997
PLANS/APPL TAKEN TO FRONT DESK  4/8/1997 PASS
Print Occupancy Form  4/8/1997
Telephone call  4/8/1997
PERMIT READY, FEE DUE
Issue PAID IN FULL permit  4/8/1997
Inspection Record Card- Bld  4/8/1997
Plan assigned to (M_P)1/27/1997 4/8/1997 PASS
DetailsMike Phillips
04/08/97 09:33:26 DAR - this action updated by action script from <<>> in Case No. BLD97-0042
Plan Reviewer's activity  4/7/1997 PASS
Print Pending Permit.LaserJet4  4/7/1997 PASS
Plan Reviewer's activity  3/31/1997 PEND
WAITING FOR ACHD FEE RECEIPT & MUSGROVE ENGINEERING SIGNATURE
Routing Off Site - A.C.H.D3/24/1997 3/28/1997 PASS
fees not paid. FEES PAID 4/7/97 DAR
Routing - PUBLIC WORKS3/6/1997 3/14/1997 PASS
PACKAGGE #2
Routing Off Site - STRUCTURAL3/10/1997 3/13/1997 PASS
RESUBS SENT TO CH2MHILL. DAR RESUBS RETURNED FROM CH2M HILL. DAR
Routing - PLAN CHECK1/31/1997 3/6/1997
PACKAGE #2
Routing - PLANNING3/4/1997 3/5/1997 PASS
package #2 X-ref: DR-128-96. Approved by MS.
Routing - FIRE2/11/1997 2/24/1997 PASS
PACKAGE #1
Routing - PLAN CHECK1/27/1997 2/11/1997
PACKAGE #1
Plan Reviewer's activity  2/11/1997 FAIL
SENT CORRECTION NOTICE ALONG WITH OUTSIDE ENGINEERING FIRM'S STRUCTURAL COMMENTS.
Print Pending Permit.LaserJet4  2/11/1997 FAIL
Routing - PLANNING1/23/1997 1/30/1997 FAIL
PACKAGE #2 LANDSCAPE PLAN NEEDS TO BE REVISED PER FORESTER'S COMMENTS. CONTACTED T. SOUTH LANDSCAPE ARCH. DR-128-96
Routing Off Site - STRUCTURAL1/13/1997 1/29/1997 FAIL
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL ATTEN. CRAIG BARRETT
Routing Off Site - A.C.H.D1/13/1997 1/29/1997 FAIL
PACKAGE #4 CONTACTED KELLY VINCENT AT ###-#### TO TAKE PLANS OUT TO ACHD
Routing - ELECTRICAL1/22/1997 1/27/1997 PASS
PACKAGE #1 REJECTED. THIS HAS BEEN TURNED LOOSE, BUT REJECTED, FIELD INSPECTOR WILL REVIEW RESUBMITTLES AT WORK JOB SITE. PERRY PAINE
Plan assigned to (RGG)1/13/1997 1/27/1997
Routing - PUBLIC WORKS1/13/1997 1/23/1997 FAIL
PACKAGE #2 REQUIRES DRAINAGE PLAN REVISIONS FOR BOTH A & B OFFICE BLDGS. BM 1-22-97
Routing - PLUMBING1/21/1997 1/22/1997 PASS
PACKAGE #1
Routing - MECHANICAL1/13/1997 1/21/1997 PASS
PACKAGE #1 NO REVIEW WILL FIELD VERIFY.
Plan routing begun/NEW & ADDTN  1/13/1997 PASS
Plans ACCEPTED BY PLAN CHECK  1/13/1997 PASS
Received Certificate of Value  1/13/1997 PASS
Recd Pcfee & Taken To Pln CK  1/10/1997
Application received  1/10/1997
Gay Receipt For Partial Pay  1/10/1997