Permit Information
Permit NumberBLD97-00044
StatusExpired
Name HEWLETT PACKARD BLDG. #6
Site Address 11311 W CHINDEN BLVD
Project NameHP #6
Customer Number 
ePlanReviewNo
Description
BLD 6 INKJET PROJECT/ STRUCTURAL PCKG IJ07. To perform structural modifications and upgrades as indicated on the approved plans to the interior of the structure only. No exterior modifications or additions are included as a part of this permit. This permit does not cover any interior nonbearing frame wall construction not shown as a part of package IJ07 or any new electrical, mechanical or plumbing. NOTE: This building is fully sprinklered. PC#011/97/ drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final6/3/19986/3/19986/3/1998PPASS
DetailsCarl Dependahl
STRUCT PORTION W/ BLD 97-0401, HP BLDG 6. OK FOR L/C ONLY
INSP - Final5/18/19985/18/19985/18/1998AFAIL
DetailsCarl Dependahl
need verify firestops at replaced section 2hr wall
INSP - Final4/24/19984/24/19984/24/1998ANR
DetailsCarl Dependahl
NO INSP, CONF W/ TIM B. RE FINAL, KEEP C/N. CHEMICAL ISSUES APPEAR TO BE RESOLVED, WILL CHECK W/ FLOYD V.
INSP - Conference11/18/199711/18/199711/18/1997PPASS
DetailsCarl Dependahl
NEED TO COMPLETE PER PLAN FOR C/O....REMOVE CHILLER TANK, ETC.
INSP - Conference11/6/199711/6/199711/6/1997PPASS
DetailsCarl Dependahl
W/ BRIAN PRICE RE: REMOVAL OF CHILLER TANK & REALIGN TEMP. CONDITION OF 2HR WALL AT BSMT. NEED TO COMPLETE BEFORE L/C. STRUCT PERMIT W/ BLD97-0401
INSP - Conference10/28/199710/28/199710/28/1997APASS
DetailsCarl Dependahl
W/ DAN S. RE 2HR WALL AT BGSMT...TEMP JOG AT TANK YET TO BE REMOVED. SHOULD BE DONE SOON AS CHILLER ADDED WILL BE ONLINE.
INSP - Carpentry10/17/199710/16/199710/16/1997PPART
DetailsCarl Dependahl
2 hr wall & structure w/ BLD97-0401... HP 6 FAB
INSP - Conference9/29/19979/29/19979/29/1997PPASS
DetailsCarl Dependahl
W/DAN S. RE FINAL HP6
INSP - Carpentry9/25/19979/25/19979/25/1997 PART
DetailsCarl Dependahl
/ / 340 - 2HR WALL, ETC.
INSP - Carpentry9/23/19979/23/19979/23/1997PPART
DetailsCarl Dependahl
09/23/97 340 - HP 6. NEED TO VERIFY COL. & BEAM WRAP AT 10' FROM 2 HR WA
INSP - Carpentry9/22/19979/22/19979/22/1997PPART
DetailsCarl Dependahl
09/22/97 340 - HP 6
INSP - Carpentry9/18/19979/19/19979/19/1997PPART
DetailsCarl Dependahl
09/19/97 340 -
INSP - Conference9/18/19979/18/19979/18/1997APASS
DetailsCarl Dependahl
W/ BLD97-0401
INSP - Carpentry9/3/19979/3/19979/4/1997PPART
DetailsCarl Dependahl
09/03/97 340 - W/ BLD970401...WIP
INSP - Wall cover8/28/19978/28/19978/28/1997 PART
DetailsCarl Dependahl
/ / 340 - 2HR WALL W/ BLD97-0401, BLDG 6; CHK BEAM WRAP, FIRESTOPS, ET
INSP - Carpentry8/25/19978/25/19978/25/1997PPART
DetailsCarl Dependahl
08/25/97 340 - PROGRESS FOR FINAL
INSP - Carpentry8/22/19978/22/19978/22/1997PPASS
DetailsCarl Dependahl
REC'D SPEC INSP REPORT RE FIREPROOFING AT 2HR WALL
INSP - Conference8/8/19978/8/19978/8/1997PPASS
DetailsCarl Dependahl
KEEP C/N, NEED CARD FOR L/C...W/ BLD97-0401( THIS IS STRUCT PERMIT FOR 2HR & CORR. WALLS, ETC AT BLDG 6, HP
INSP - Conference8/7/19978/7/19978/7/1997APASS
DetailsCarl Dependahl
RE FIRESTOPS SUBMITTED BY HILTI
INSP - Carpentry8/4/19978/4/19978/4/1997 FAIL
DetailsCarl Dependahl
/ / 340 - BLDG 6; KEEP C/N NEED FIRESTOP SPECS
INSP - Conference8/1/19978/1/19978/1/1997 PASS
DetailsCarl Dependahl
/ / 340 - RE SPEC INSP REPORTS NOT COMPLETED FOR 2HR WALL AT BLDG 6
INSP - Carpentry7/29/19977/29/19977/29/1997 PART
DetailsCarl Dependahl
07/29/97 340 - 2 HR WALL W/ 97-0401
INSP - Conference7/22/19977/22/19977/22/1997PPASS
DetailsCarl Dependahl
W/ DAN S. RE FINAL. L/C ONLY ON STRUCT PERMIT
INSP - Masonry7/18/19977/18/19977/18/1997 PART
DetailsCarl Dependahl
/ / 340 - CHILLER, BLDG 6; SPEC INSP REPORT PENDING..SENT TO SLY IN ER
INSP - Carpentry7/18/19977/18/19977/18/1997PPART
DetailsCarl Dependahl
07/18/97 340 - STRUCT AND 2HR WALL, HP BLDG 6, INK JET FAB AREA; AWAITIN CABLE TRAYS, ETC. ALSO SPEC INSP REPORTS FOR SPRAY ON.
INSP - Carpentry7/17/19977/17/19977/18/1997PFAIL
DetailsCarl Dependahl
07/17/97 340 - 2HR WALL...MET HILTI REP RE FIRESTOPS. NEED ENG'S RECOMEN PENETRATIONS.
INSP - Carpentry7/16/19977/16/19977/16/1997PPART
DetailsCarl Dependahl
2HR AREA SEP WALL...W/ BLD97-0401, IJ14; HP BLDG 6
INSP - Conference7/15/19977/14/19977/14/1997PPASS
DetailsCarl Dependahl
W/ CONT. RE 2HR WALL REQ'S FOR T/O
INSP - Carpentry7/10/19977/10/19977/10/1997PPART
DetailsCarl Dependahl
07/10/97 340 - 2HR WALL RESUB...WIP
INSP - Carpentry7/8/19977/8/19977/8/1997 PART
DetailsCarl Dependahl
/ / 340 - firestops at 2hr
INSP - Carpentry7/1/19977/1/19977/1/1997 PART
DetailsCarl Dependahl
/ / 340 - 2 HR WALL AT 6 BSMT; WILL SUBMIT FOR TEMP MOD AT WALL/ TANK
INSP - Conference6/25/19976/25/19976/25/1997APASS
DetailsCarl Dependahl
W JOHN KERR RE FIRESTOPS
INSP - Framing/Rough-in6/23/19976/23/19976/23/1997 FAIL
DetailsCarl Dependahl
/ / 340 - BLDG 6 2HR WALL PHASE; C/N W/ FRAME INSP BLD 97-0401
INSP - Conference6/11/19976/11/19976/11/1997 PASS
DetailsCarl Dependahl
/ / 340 - bldg 6, ink jet proj; w/ Dan Stuart
INSP - Conference6/10/19976/10/19976/10/1997 PART
DetailsCarl Dependahl
/ / 340 - STRUCT FOR 2HR WALL OK
INSP - Conference6/10/19976/10/19976/10/1997 PART
DetailsCarl Dependahl
/ / 340 - STRUCT FOR 2HR WALL OK
INSP - Conference5/13/19975/13/19975/13/1997 PASS
DetailsCarl Dependahl
/ / 340 - RE BLDG 6 ; INK JET PROJ.
INSP - Conference5/7/19975/7/19975/7/1997 PASS
DetailsCarl Dependahl
/ / 340 - W/ DAN STUART RE INK JET PROJ
INSP - Carpentry5/5/19975/6/19975/6/1997PPART
DetailsCarl Dependahl
05/06/97 340 -
INSP - Carpentry5/6/19975/6/19975/6/1997 PART
DetailsCarl Dependahl
05/06/97 340 - #6
INSP - Carpentry5/5/19975/5/19975/5/1997PNR
DetailsCarl Dependahl
05/05/97 340 - BLDG #6 NO CONTACT PERSON, CALLED TIM BASHFORD, NO RESPON
INSP - Carpentry4/22/19974/23/19974/23/1997PPASS
DetailsCarl Dependahl
04/22/97 340 - BLDG. #6 PAUL HESKETH -###-#### NEED FURTHER PERMIT TO CO CHK WIP
90 day tracking............. 1/13/19974/13/1997
Issue PAID IN FULL permit  3/25/1997
Plan assigned to (DRS)1/15/1997 3/21/1997 PASS
DetailsDan Stuart
03/21/97 13:42:32 DRS - this action updated by action script from <<>> in Case No. BLD97-0044
PLANS/APPL TAKEN TO FRONT DESK  3/21/1997 PASS
Routing - PLAN CHECK3/17/1997 3/21/1997 PASS
Reviewing responses to structural plan review & additional added plans. 3/21/97 - Received fax from Mark Elliot, Architect of Record, stating that the exterior modifications are requested to be removed as a part of this project and be included as a part of Package IJ14, giving HP time to get approval from P&Z for modifications and not delay the issuance of the structural upgrade permit. This is noted on permit and a copy of request is attached to the plans.
Telephone call  3/21/1997
CALLED JOHN KURR AT ###-####/ PERMIT READY, FEE DUE
Print Occupancy Form  3/21/1997
Inspection Record Card- Bld  3/21/1997
Telephone call  3/20/1997
Call to Mark Elliot to have him contact Mike Hall P&Z directly to find out what is needed for P&Z approval. Mark was not available so I left a phone message with information of who to call and the number.
Print Pending Permit.LaserJet4  3/20/1997
Telephone call  3/20/1997
Call from Mr. Kerr of the Anderson construction co. wanting to know the progress on the permit. I told him I still needed the information as outlined in the plan review done by Jan Welch, stapley Eng. that I faxed a copy of to his firm on 3/16/97. I understood that Mark Elliot has some of the information but has asked for further clarification before he can submit it to the building dept. for approval review.
Plan Reviewer's activity  3/20/1997
Called and talked with Mark Elliot. The following items were discussed. 1) - Since there are no interior non-bearing wall framing systems shown or a necessary part of this structural up grade package for IJ07 I will make the statement a part of the building permit that no interior nonbearing wall system are included in the scope of this permit. The requirement for the wall frame system design, gauge, connections, etc. called out as part of the Structural Review by Jan Welch of Stapley Engineering , will be provided for approval as part of package IJ14 for the remaining tenant improvement package. Mark is also going to let me know if the exterior modifications and addition of mechanical pads, equipment and exhaust stacks stacks can be removed as a part of this permit and included as part of IJ14 because it is necessary to have P&Z approval of the exterior modifications & additions. the exterior modification came as part of additional plans that were submitted in response to the structural plan review and not originally shown as part of this project. This would allow issuance of a building permit for this project with the above noted limitations if this is ok with H-P & Mark Elliot.
Plan Reviewer's activity  3/17/1997
Inserting plan resubmittals into the plans. 03/19/97 Additional plans submitted that show work on the exterior of the building. Tried to review what was needed with Mike Hall of P&Z on the 19th but we couldn't get together because of the busy day. Got with Mike Hall at 8 A.M. on the 20th. He ask that I have the architect call him direct so they can review what is to be done. Made phone call to Mark Elliots office but he was not available. Left message on phone to call Mike Hall and gave phone number.
Telephone call  3/14/1997
Mark returned phone call concerning his response to the structural plan review. Information needed to provide details & verifications is to be provided from the contractor and the engineer at CH2M HILL, Craig Barrett. I asked if he intended to list the response as a "deferred submittal" under section 106.3.4.2. If he did this would cause a delay at the time of a framing inspection because one could not be done until the plans were submitted and approved by the architect of record and then the plan check div. Mark said that would be fine with him and he would list a response to me requesting this view. This could cause some major problems at framing if corrections were needed. I will call the contractor to see if they will provide plans.
Telephone call  3/14/1997
Call to Anderson Const. in Portland, Or. Talked with Dan Cato
Additional plans submitted  3/10/1997
Plans submitted on this date from architect in response to structural engineers plan review comments and a meeting with Mark Elliot on Feb. 24, 1997 when Mr. Elliot discovered that the city did not have the latest structural plans.
Plan resubmittals received  3/10/1997
Received response from Mark Elliot to structural engineers review comments. Comment were incomplete as Mr. Elliot had said that the contractor was going to provide information for "...metal stud framing sizes, spacing, gauge, connection details, fasteners and design calcs demonstrating proposed construction meets AISI and metal stud manufacture's requirements."
Plan resubmittals requested  2/24/1997
Resonse required from architect to plan review of Jan Welch of Stapley Engineering
Routing - PLAN CHECK2/14/1997 2/24/1997 FAIL
Reviewed response of structural engineer plan review evaluation. Faxed and mailed copy of clarifications needed to Mark Elliot, architect of record and Craig Barrett, structural design engineer. Waiting for response.
Meeting  2/24/1997
Met with Mark Elliot in town today for separate project. I explained there were some concerns that would need to be addressed before a permit could be issued. Mr. Elliot told me that new plans had been issued for the structural portion toward the first of February. I told him I had not received them. Such changes would need to be routed back to Jan Welch of stapley Engineering for another review. Mark Elliot and I looked at the project package for HP #6 being submitted shortly and saw that the new structural plans were included. Mark said he would send me a new set along with the responses to the first structural plan review. We will continue to handle as a separate permit since it will be faster.
Routing Off Site - STRUCTURAL1/28/1997 2/14/1997
Telephone call  2/11/1997
CALL BACK FROM MARK ELLIOT TO LET ME KNOW THAT PLANS FOR STRUCTURAL REVIEW BY STAPLEY ENGINEERING HAD BEEN FEDEXED OUT TODAY AND JAN WELCH SHOULD HAVE THEM BY TOMMORROW. I CALLED JAN TO LET HER KNOW THEY WERE COMING.
Print Pending Permit.LaserJet4  1/28/1997
Routing - PLAN CHECK1/9/1997 1/28/1997
Routing plans to outside engineering firm for structural review.
Application received  1/13/1997
Gay Receipt For Partial Pay  1/13/1997
Recd Pcfee & Taken To Pln CK  1/13/1997