INSP - Final | 6/3/1998 | 6/3/1998 | 6/3/1998 | P | PASS |
Carl Dependahl
|
|
|
STRUCT PORTION W/ BLD 97-0401, HP BLDG 6. OK FOR L/C ONLY
|
INSP - Final | 5/18/1998 | 5/18/1998 | 5/18/1998 | A | FAIL |
Carl Dependahl
|
|
|
need verify firestops at replaced section 2hr wall
|
INSP - Final | 4/24/1998 | 4/24/1998 | 4/24/1998 | A | NR |
Carl Dependahl
|
|
|
NO INSP, CONF W/ TIM B. RE FINAL, KEEP C/N. CHEMICAL ISSUES APPEAR TO BE RESOLVED, WILL CHECK W/ FLOYD V.
|
INSP - Conference | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | PASS |
Carl Dependahl
|
|
|
NEED TO COMPLETE PER PLAN FOR C/O....REMOVE CHILLER TANK, ETC.
|
INSP - Conference | 11/6/1997 | 11/6/1997 | 11/6/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ BRIAN PRICE RE: REMOVAL OF CHILLER TANK & REALIGN TEMP. CONDITION OF 2HR WALL AT BSMT. NEED TO COMPLETE BEFORE L/C. STRUCT PERMIT W/ BLD97-0401
|
INSP - Conference | 10/28/1997 | 10/28/1997 | 10/28/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ DAN S. RE 2HR WALL AT BGSMT...TEMP JOG AT TANK YET TO BE REMOVED. SHOULD BE DONE SOON AS CHILLER ADDED WILL BE ONLINE.
|
INSP - Carpentry | 10/17/1997 | 10/16/1997 | 10/16/1997 | P | PART |
Carl Dependahl
|
|
|
2 hr wall & structure w/ BLD97-0401... HP 6 FAB
|
INSP - Conference | 9/29/1997 | 9/29/1997 | 9/29/1997 | P | PASS |
Carl Dependahl
|
|
|
W/DAN S. RE FINAL HP6
|
INSP - Carpentry | 9/25/1997 | 9/25/1997 | 9/25/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - 2HR WALL, ETC.
|
INSP - Carpentry | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PART |
Carl Dependahl
|
|
|
09/23/97 340 - HP 6. NEED TO VERIFY COL. & BEAM WRAP AT 10' FROM 2 HR WA
|
INSP - Carpentry | 9/22/1997 | 9/22/1997 | 9/22/1997 | P | PART |
Carl Dependahl
|
|
|
09/22/97 340 - HP 6
|
INSP - Carpentry | 9/18/1997 | 9/19/1997 | 9/19/1997 | P | PART |
Carl Dependahl
|
|
|
09/19/97 340 -
|
INSP - Conference | 9/18/1997 | 9/18/1997 | 9/18/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ BLD97-0401
|
INSP - Carpentry | 9/3/1997 | 9/3/1997 | 9/4/1997 | P | PART |
Carl Dependahl
|
|
|
09/03/97 340 - W/ BLD970401...WIP
|
INSP - Wall cover | 8/28/1997 | 8/28/1997 | 8/28/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - 2HR WALL W/ BLD97-0401, BLDG 6; CHK BEAM WRAP, FIRESTOPS, ET
|
INSP - Carpentry | 8/25/1997 | 8/25/1997 | 8/25/1997 | P | PART |
Carl Dependahl
|
|
|
08/25/97 340 - PROGRESS FOR FINAL
|
INSP - Carpentry | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | PASS |
Carl Dependahl
|
|
|
REC'D SPEC INSP REPORT RE FIREPROOFING AT 2HR WALL
|
INSP - Conference | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | PASS |
Carl Dependahl
|
|
|
KEEP C/N, NEED CARD FOR L/C...W/ BLD97-0401( THIS IS STRUCT PERMIT FOR 2HR & CORR. WALLS, ETC AT BLDG 6, HP
|
INSP - Conference | 8/7/1997 | 8/7/1997 | 8/7/1997 | A | PASS |
Carl Dependahl
|
|
|
RE FIRESTOPS SUBMITTED BY HILTI
|
INSP - Carpentry | 8/4/1997 | 8/4/1997 | 8/4/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - BLDG 6; KEEP C/N NEED FIRESTOP SPECS
|
INSP - Conference | 8/1/1997 | 8/1/1997 | 8/1/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE SPEC INSP REPORTS NOT COMPLETED FOR 2HR WALL AT BLDG 6
|
INSP - Carpentry | 7/29/1997 | 7/29/1997 | 7/29/1997 | | PART |
Carl Dependahl
|
|
|
07/29/97 340 - 2 HR WALL W/ 97-0401
|
INSP - Conference | 7/22/1997 | 7/22/1997 | 7/22/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ DAN S. RE FINAL. L/C ONLY ON STRUCT PERMIT
|
INSP - Masonry | 7/18/1997 | 7/18/1997 | 7/18/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CHILLER, BLDG 6; SPEC INSP REPORT PENDING..SENT TO SLY IN ER
|
INSP - Carpentry | 7/18/1997 | 7/18/1997 | 7/18/1997 | P | PART |
Carl Dependahl
|
|
|
07/18/97 340 - STRUCT AND 2HR WALL, HP BLDG 6, INK JET FAB AREA; AWAITIN CABLE TRAYS, ETC. ALSO SPEC INSP REPORTS FOR SPRAY ON.
|
INSP - Carpentry | 7/17/1997 | 7/17/1997 | 7/18/1997 | P | FAIL |
Carl Dependahl
|
|
|
07/17/97 340 - 2HR WALL...MET HILTI REP RE FIRESTOPS. NEED ENG'S RECOMEN PENETRATIONS.
|
INSP - Carpentry | 7/16/1997 | 7/16/1997 | 7/16/1997 | P | PART |
Carl Dependahl
|
|
|
2HR AREA SEP WALL...W/ BLD97-0401, IJ14; HP BLDG 6
|
INSP - Conference | 7/15/1997 | 7/14/1997 | 7/14/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ CONT. RE 2HR WALL REQ'S FOR T/O
|
INSP - Carpentry | 7/10/1997 | 7/10/1997 | 7/10/1997 | P | PART |
Carl Dependahl
|
|
|
07/10/97 340 - 2HR WALL RESUB...WIP
|
INSP - Carpentry | 7/8/1997 | 7/8/1997 | 7/8/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - firestops at 2hr
|
INSP - Carpentry | 7/1/1997 | 7/1/1997 | 7/1/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - 2 HR WALL AT 6 BSMT; WILL SUBMIT FOR TEMP MOD AT WALL/ TANK
|
INSP - Conference | 6/25/1997 | 6/25/1997 | 6/25/1997 | A | PASS |
Carl Dependahl
|
|
|
W JOHN KERR RE FIRESTOPS
|
INSP - Framing/Rough-in | 6/23/1997 | 6/23/1997 | 6/23/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - BLDG 6 2HR WALL PHASE; C/N W/ FRAME INSP BLD 97-0401
|
INSP - Conference | 6/11/1997 | 6/11/1997 | 6/11/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - bldg 6, ink jet proj; w/ Dan Stuart
|
INSP - Conference | 6/10/1997 | 6/10/1997 | 6/10/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - STRUCT FOR 2HR WALL OK
|
INSP - Conference | 6/10/1997 | 6/10/1997 | 6/10/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - STRUCT FOR 2HR WALL OK
|
INSP - Conference | 5/13/1997 | 5/13/1997 | 5/13/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE BLDG 6 ; INK JET PROJ.
|
INSP - Conference | 5/7/1997 | 5/7/1997 | 5/7/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ DAN STUART RE INK JET PROJ
|
INSP - Carpentry | 5/5/1997 | 5/6/1997 | 5/6/1997 | P | PART |
Carl Dependahl
|
|
|
05/06/97 340 -
|
INSP - Carpentry | 5/6/1997 | 5/6/1997 | 5/6/1997 | | PART |
Carl Dependahl
|
|
|
05/06/97 340 - #6
|
INSP - Carpentry | 5/5/1997 | 5/5/1997 | 5/5/1997 | P | NR |
Carl Dependahl
|
|
|
05/05/97 340 - BLDG #6 NO CONTACT PERSON, CALLED TIM BASHFORD, NO RESPON
|
INSP - Carpentry | 4/22/1997 | 4/23/1997 | 4/23/1997 | P | PASS |
Carl Dependahl
|
|
|
04/22/97 340 - BLDG. #6 PAUL HESKETH -###-#### NEED FURTHER PERMIT TO CO CHK WIP
|
90 day tracking............. | | 1/13/1997 | 4/13/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/25/1997 | | |
|
|
|
|
Plan assigned to (DRS) | 1/15/1997 | | 3/21/1997 | | PASS |
Dan Stuart
|
|
|
03/21/97 13:42:32 DRS - this action updated by action script from <<>> in Case No. BLD97-0044
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/1997 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/17/1997 | | 3/21/1997 | | PASS |
|
|
|
Reviewing responses to structural plan review & additional added plans. 3/21/97 - Received fax from Mark Elliot, Architect of Record, stating that the exterior modifications are requested to be removed as a part of this project and be included as a part of Package IJ14, giving HP time to get approval from P&Z for modifications and not delay the issuance of the structural upgrade permit. This is noted on permit and a copy of request is attached to the plans.
|
Telephone call | | | 3/21/1997 | | |
|
|
|
CALLED JOHN KURR AT ###-####/ PERMIT READY, FEE DUE
|
Print Occupancy Form | | | 3/21/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/1997 | | |
|
|
|
|
Telephone call | | | 3/20/1997 | | |
|
|
|
Call to Mark Elliot to have him contact Mike Hall P&Z directly to find out what is needed for P&Z approval. Mark was not available so I left a phone message with information of who to call and the number.
|
Print Pending Permit.LaserJet4 | | | 3/20/1997 | | |
|
|
|
|
Telephone call | | | 3/20/1997 | | |
|
|
|
Call from Mr. Kerr of the Anderson construction co. wanting to know the progress on the permit. I told him I still needed the information as outlined in the plan review done by Jan Welch, stapley Eng. that I faxed a copy of to his firm on 3/16/97. I understood that Mark Elliot has some of the information but has asked for further clarification before he can submit it to the building dept. for approval review.
|
Plan Reviewer's activity | | | 3/20/1997 | | |
|
|
|
Called and talked with Mark Elliot. The following items were discussed. 1) - Since there are no interior non-bearing wall framing systems shown or a necessary part of this structural up grade package for IJ07 I will make the statement a part of the building permit that no interior nonbearing wall system are included in the scope of this permit. The requirement for the wall frame system design, gauge, connections, etc. called out as part of the Structural Review by Jan Welch of Stapley Engineering , will be provided for approval as part of package IJ14 for the remaining tenant improvement package. Mark is also going to let me know if the exterior modifications and addition of mechanical pads, equipment and exhaust stacks stacks can be removed as a part of this permit and included as part of IJ14 because it is necessary to have P&Z approval of the exterior modifications & additions. the exterior modification came as part of additional plans that were submitted in response to the structural plan review and not originally shown as part of this project. This would allow issuance of a building permit for this project with the above noted limitations if this is ok with H-P & Mark Elliot.
|
Plan Reviewer's activity | | | 3/17/1997 | | |
|
|
|
Inserting plan resubmittals into the plans. 03/19/97 Additional plans submitted that show work on the exterior of the building. Tried to review what was needed with Mike Hall of P&Z on the 19th but we couldn't get together because of the busy day. Got with Mike Hall at 8 A.M. on the 20th. He ask that I have the architect call him direct so they can review what is to be done. Made phone call to Mark Elliots office but he was not available. Left message on phone to call Mike Hall and gave phone number.
|
Telephone call | | | 3/14/1997 | | |
|
|
|
Mark returned phone call concerning his response to the structural plan review. Information needed to provide details & verifications is to be provided from the contractor and the engineer at CH2M HILL, Craig Barrett. I asked if he intended to list the response as a "deferred submittal" under section 106.3.4.2. If he did this would cause a delay at the time of a framing inspection because one could not be done until the plans were submitted and approved by the architect of record and then the plan check div. Mark said that would be fine with him and he would list a response to me requesting this view. This could cause some major problems at framing if corrections were needed. I will call the contractor to see if they will provide plans.
|
Telephone call | | | 3/14/1997 | | |
|
|
|
Call to Anderson Const. in Portland, Or. Talked with Dan Cato
|
Additional plans submitted | | | 3/10/1997 | | |
|
|
|
Plans submitted on this date from architect in response to structural engineers plan review comments and a meeting with Mark Elliot on Feb. 24, 1997 when Mr. Elliot discovered that the city did not have the latest structural plans.
|
Plan resubmittals received | | | 3/10/1997 | | |
|
|
|
Received response from Mark Elliot to structural engineers review comments. Comment were incomplete as Mr. Elliot had said that the contractor was going to provide information for "...metal stud framing sizes, spacing, gauge, connection details, fasteners and design calcs demonstrating proposed construction meets AISI and metal stud manufacture's requirements."
|
Plan resubmittals requested | | | 2/24/1997 | | |
|
|
|
Resonse required from architect to plan review of Jan Welch of Stapley Engineering
|
Routing - PLAN CHECK | 2/14/1997 | | 2/24/1997 | | FAIL |
|
|
|
Reviewed response of structural engineer plan review evaluation. Faxed and mailed copy of clarifications needed to Mark Elliot, architect of record and Craig Barrett, structural design engineer. Waiting for response.
|
Meeting | | | 2/24/1997 | | |
|
|
|
Met with Mark Elliot in town today for separate project. I explained there were some concerns that would need to be addressed before a permit could be issued. Mr. Elliot told me that new plans had been issued for the structural portion toward the first of February. I told him I had not received them. Such changes would need to be routed back to Jan Welch of stapley Engineering for another review. Mark Elliot and I looked at the project package for HP #6 being submitted shortly and saw that the new structural plans were included. Mark said he would send me a new set along with the responses to the first structural plan review. We will continue to handle as a separate permit since it will be faster.
|
Routing Off Site - STRUCTURAL | 1/28/1997 | | 2/14/1997 | | |
|
|
|
|
Telephone call | | | 2/11/1997 | | |
|
|
|
CALL BACK FROM MARK ELLIOT TO LET ME KNOW THAT PLANS FOR STRUCTURAL REVIEW BY STAPLEY ENGINEERING HAD BEEN FEDEXED OUT TODAY AND JAN WELCH SHOULD HAVE THEM BY TOMMORROW. I CALLED JAN TO LET HER KNOW THEY WERE COMING.
|
Print Pending Permit.LaserJet4 | | | 1/28/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 1/9/1997 | | 1/28/1997 | | |
|
|
|
Routing plans to outside engineering firm for structural review.
|
Application received | | | 1/13/1997 | | |
|
|
|
|
Gay Receipt For Partial Pay | | | 1/13/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/13/1997 | | |
|
|
|
|