Permit Information
Permit NumberBLD97-00110
StatusFinaled
Name GST TELECOM
Site Address 199 N CAPITOL BLVD
Project NameWASHINGTON MUTUAL
Customer Number 
ePlanReviewNo
Description
(WASHINGTON MUTUAL - 3RD FLR) To construct and finish an office support area of 1860 sq. feet on the 3rd floor, A 3,671 sq. ft. Switch Gear Room with support areas on the fourth floor and a 140 sq. ft. Fuel Tank Storage room in the basement for emergency generator additional fuel supply. Construction to be of noncombustible frame with fire resistive protection of framing, suspended ceiling system and structural upgrade of floor system under battery storage area per engineering, all per approved plans. Separate electrical, mechanical & plumbing permits are required. Contractor responsible for full compliance with attached Fire Dept. plan review comments. NOTE: This building is fully fire sprinklered. Sprinkler system is used to comply with high-rise requirements. PC#021-97/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/30/19974/30/1997 DONE
Details
INSP - Final4/29/19974/30/19974/30/1997PCANC
DetailsJim Storey
04/29/97 301 - trans to kim 4th south end.
Permanent occupancy  4/30/1997 PASS
Perm. Occ. Cert. #6846 issued 4-30-97 to GST Telecom.
INSP-Final Inspection4/28/19974/29/19974/29/1997APASS
Details
ALARMS TESTED, BASEMENT SEPARATION OF TANK TESTED, PASS
90 day tracking............. 1/21/19974/21/1997
INSP-Final Inspection4/17/19974/17/19974/17/1997AFAIL
Details
3rd floor corridor requirements and basement diesel tank requirements NOT MET
INSP-Sprinkler Rough-in/Hydro4/16/19974/16/19974/16/1997PPASS
Details
1pm pre-action system test system trip test ok, need to connect fm 200 smoke detectors to building supervisory since panel location is not constantly attended and signal is not sent to approved central station. will check w/ final
INSP - Framing/Rough-in4/8/19974/9/19974/8/1997PPASS
Details
04/09/97 333 - GRID 3 RD FLOOR SCLG-OK SUSPENDED CEILING
INSP-Conference3/26/19973/26/19973/26/1997APART
Details
delivered notice of violation to roger of merrill. Discussed possible ways to correct.
INSP - Final3/21/19973/25/19973/25/1997AFAIL
Details
gst 4th flr not complete, want to use fm 200 in place of sprinklers, plans called for fm200 to be additional. alarms not connected, corridor doors not installed. advised Roger w/ Merrill to drop sprinklers into space or request approval of fm200 as a replacement system from the fire chief.
INSP - Ceiling grid3/6/19973/7/19973/6/1997APASS
Details
03/07/97 333 - 4TH FLOOR SCLG-OK SUSPENDED CEILING
INSP - Framing/Rough-in2/24/19972/24/19972/23/1997PPASS
Details
02/24/97 333 -
Plan assigned to (DRS)2/3/1997 2/21/1997 PASS
DetailsDan Stuart
02/21/97 15:36:12 DRS - this action updated by action script from <<>> in Case No. BLD97-0110
Inspection Record Card- Bld  2/21/1997
Print Occupancy Form  2/21/1997
Issue PAID IN FULL permit  2/21/1997
PLANS/APPL TAKEN TO FRONT DESK  2/21/1997 PASS
Approved with notes and attachments to contractor
Print Pending Permit.LaserJet4  2/21/1997 PASS
Telephone call  2/21/1997
Phone call to Brett Cato concerning a fire stop assembly that was not noted in his response. I sent him a copy of one since he did not have the 1995 UL Directory, for him to approve and send back. I also noted to him by phone that the fire dept. concerns about spill control and ventilation within the battery storage room. Brett said he had knowledge of ways to accompolish this and would comply if required.
Plan resubmittals received  2/21/1997
Received resubmittals for mechanical plans, fire stop fax from Brett Cato and comments on preliminary plan review items.
Print Pending Permit.LaserJet4  2/21/1997 PASS
Plan resubmittals requested  2/11/1997
Finsihed preliminary plan review for the project and faxed a copy to Brett Cato as well as mailing him a hard copy. Plans will be forwarded to Fire Dept. for review while waiting for architects response.
Print Pending Permit.LaserJet4  2/11/1997 FAIL
Waiting for response from architect on plan review items needing details and or clarification.
Additional plans submitted  2/11/1997
Roger of Merrill Contractors brought in two copies of the mechanical plans and left with Dave Radford. The plans were unstamped - noted because this had been the problem causing delays of permit review per the contractor when the he had tried to turn the plans in a week ago ????
Routing - PLAN CHECK1/24/1997 2/11/1997
Routing to Fire dept. Comments for architect response faxed and mailed to architect.
Telephone call  2/10/1997
Late A.M. Call to Brett Cato of Fraley/Stricker Architects to clarify detail on plan for wall construction at the H3 Fuel Tank Storage Room Occupancy in the basement and to let him know I had not received the mechanical plans on Friday, Feb. 7, 1997 as I had been told I would. He was not available at the time of my call but his secretary said she would have him call.
Telephone call  2/10/1997
Brett Cato returned my call. I asked about the wall detail on Sheet A4, which walls the detail applied to represented? Not the rated walls - they would run from floor to deck. The use of the switch room was mechanical with possibly two staff personel. I told him I had not received the mechanical plans and I had not been able to find out who had rejected them and that at this time a mechanical stamp by a licensed Idaho Mech Eng was not required. Brett said he woild follow up on getting the mechanical plans turned in.
Telephone call  2/7/1997
Call to Brett Cato concerning the specific uses of the 4th flor switch gear rooms, what the FM200 Tanks were, information on the battery storage units and the call out on the plans for a 2-hour wall arounf the new room - reason for requirement and how the wll was to be protected at openings and penetrations. Also discussed with Brett that there may be future complications with exiting from the balcony area adjoining the East end of the tenant space depending on the use of the area by his customer or a possible future restaurant. If the restaurant uses all the space then they amy not want his office to have access to the area. If a means to prevent access to the restaurant area is installed in line with the tenants North wall accross the terrace, a n exit will have to be available back through the tenant space and a door will have to have proper hardware per section 1004.3 UBC. Mr. Cato said he understood and would make his client aware of the circumstances.
Plan resubmittals received  2/7/1997
Recieved written clarrification from Brett Cato on the uses of the rooms in the Switch Room, information on the batteries (for fire dept. review) and the FM200 Fire Suppression Tanks.
Plan resubmittals received  2/4/1997
Received revision to plans concernign seismic bracing from Brett.
Plan resubmittals received  2/3/1997
Received fax note from Brett with cut sheet for fuel tank, clarification on location of mechanical equipment in relationship to new vestibule entry from garage to 3rd floor, and a note that the mechanical engineer had applied to Idaho for a temporary license so he could stamp the plans.
Telephone call  2/3/1997
Call to Brett Cato concerning specifications on the fuel tank, location of mechanical equipment in parking garage in relation to the new vestibule access from the third floor to the parking garage, mechanical plans for the project and a note on the plans concerning seismic bracing at 8 feet o.c. - I refered him to UBC Standard 25-2 for review for ceiling bracing. Brett said he would respond ASAP.
Plan assigned to (CJW)1/22/1997 2/3/1997
DetailsCarl Westfall
Routing - PUBLIC WORKS1/22/1997 1/24/1997 PASS
Plan routing begun/TENANTS  1/22/1997
Route to PUBLIC WORKS then back to PLAN CHECK. After Plan Check route to FIRE DEPARTMENT.
Application received  1/21/1997
Recd Pcfee & Taken To Pln CK  1/21/1997
Gay Receipt For Partial Pay  1/21/1997
Routing - PLAN CHECK2/21/1997 1/21/1997 PASS
Plan review done by Fire dept. Mechanical plan resubmittals and notes & plans from architect inserted into plans and reviewed for compliance with plan review comments.