Permanent Occupancy | | 9/17/1997 | 9/17/1997 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/17/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #6991 issued 9-17-97 to Washington Mutual Bank.
|
INSP - Final | 9/11/1997 | 9/12/1997 | 9/15/1997 | A | PASS |
|
|
|
09/15/97 338 - signed the perm col cathy will send to the above address
|
INSP - Final | 9/4/1997 | 9/5/1997 | 9/4/1997 | A | NR |
|
|
|
09/04/97 338 - LATE AM STILL NEED ELE AND P/W SIGNOFF STR IS OK OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | FAIL |
Joe Tawney
|
|
|
09/03/97 406 - FINAL FAIL EXIT SIGNS DUCT DETECTOR EXT TAG
|
INSP - Final | 9/4/1997 | 9/4/1997 | 9/4/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
|
Routing for occupancy | 9/3/1997 | 9/3/1997 | 9/3/1997 | | PASS |
|
|
|
Inspected by Scott Brown - meets compliance w/DR-137-96
|
INSP - Temporary occupancy | 9/2/1997 | 9/3/1997 | 9/3/1997 | A | NR |
|
|
|
09/03/97 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Ceiling grid | 8/5/1997 | 8/7/1997 | 8/7/1997 | A | PART |
|
|
|
08/06/97 338 - to cover ceiling done by 804
|
INSP - Ceiling grid | 8/7/1997 | 8/7/1997 | 8/7/1997 | A | PASS |
Tom Arcoraci
|
|
|
|
INSP - Framing/Rough-in | 7/16/1997 | 7/17/1997 | 7/17/1997 | A | PART |
|
|
|
07/17/97 338 - made ok but only with the ele signoff
|
INSP - Framing/Rough-in | 7/15/1997 | 7/16/1997 | 7/17/1997 | A | NR |
|
|
|
07/16/97 338 - cancelled by the builder OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Framing/Rough-in | 7/1/1997 | 7/1/1997 | 7/2/1997 | P | PART |
|
|
|
07/02/97 338 - verbal corrections need paperwork for the rated wall chan
|
INSP - Framing/Rough-in | 6/26/1997 | 6/27/1997 | 6/27/1997 | A | FAIL |
|
|
|
06/27/97 338 - gate locked no access
|
INSP - Flatwork | 6/11/1997 | 6/12/1997 | 6/12/1997 | A | PASS |
|
|
|
06/12/97 338 - interior slab and steel.......bar placed ok to pour
|
INSP - Foundation | 6/4/1997 | 6/4/1997 | 6/4/1997 | P | PASS |
|
|
|
06/04/97 338 - fnd. wall POURED W/O INSP OK WITH SP INSP APPROVAL
|
INSP - Wall cover | 5/22/1997 | 5/22/1997 | 5/22/1997 | P | CANC |
|
|
|
05/22/97 338 - cancelled could not make insp on time
|
INSP - Footings | 5/14/1997 | 5/15/1997 | 5/15/1997 | A | PASS |
|
|
|
05/15/97 338 - north and west corner
|
INSP - Footings | 5/12/1997 | 5/13/1997 | 5/13/1997 | A | PASS |
Russ Owen
|
|
|
BEFORE 11:00 INSPECTED THE SOUTH AND WEST AND PORTION OF THE EAST.
|
90 day tracking............. | | 2/10/1997 | 5/11/1997 | | PEND |
|
|
|
|
(F) Reprint permit | | | 5/2/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/1997 | | |
|
|
|
|
Plan assigned to (PRP) | 4/4/1997 | | 4/29/1997 | | PASS |
|
|
|
routing to fire, corrections required. ALL IN ORDER, ISSUE
|
Plan Reviewer's activity | | | 4/29/1997 | | PASS |
|
|
|
reviewed plans, mark-up, prepare Plan Analyist, Correction list, Fax to Arch, Forward to Fire. Package 1 4/29/97--ASSEMBLE APPROVED PLANS, INPUT TO TIDEMARK, ISSUE
|
Print Occupancy Form | | | 4/29/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/29/1997 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/29/1997 | | PASS |
|
|
|
ISSUE
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/1997 | | PASS |
|
|
|
ISSUE
|
Telephone call | | | 4/29/1997 | | |
|
|
|
LEFT MESSAGE WITH JAMES NORMAN
|
Plan resubmittals received | | | 4/28/1997 | | |
|
|
|
|
Routing - FIRE | 3/7/1997 | | 4/10/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - STRUCTURAL | 3/18/1997 | | 4/8/1997 | | |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO STAPLEY ENGINEERING
|
Routing - PLAN CHECK | 3/24/1997 | | 4/7/1997 | | |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 3/27/1997 | | 4/7/1997 | | PASS |
|
|
|
PACKAGE #2 X-ref: CU-69-96 & DR-137-96. Approved by BB & TKW.
|
Plan resubmittals requested | 4/4/1997 | | 4/4/1997 | | |
|
|
|
|
Plan assigned to (RGG) | 2/11/1997 | | 4/4/1997 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/18/1997 | | 3/27/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing - ELECTRICAL | 3/20/1997 | | 3/24/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLUMBING | 3/18/1997 | | 3/20/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - A.C.H.D | 3/18/1997 | | 3/20/1997 | | PEND |
|
|
|
PACKAGE #4 CONTACTED JAMES NORMAN AT ###-#### TO TAKE PLANS OUT TO ACHD. ACHD FEES NOT PAID.
|
Plan routing begun/NEW & ADDTN | | | 3/17/1997 | | PASS |
|
|
|
ROUTING PACKAGES #3 AND 4. WAITING FOR P-1 SHEETS TO BE STAMPED AND SIGNED FOR PACKAGES #1 AND #2.
|
Plans ACCEPTED BY PLAN CHECK | | | 3/14/1997 | | PASS |
|
|
|
RECEIVED NEW PLANS AS A FOUR PACKAGE SET. CONTACTED DAVID MUSGROVE OF HIS NEED TO SIGN P-1 SHEETS FOR PACKAGES #1 AND #2. 3-18-97 DAVID MUSGROVE CAME IN AND SIGNED P-1 SHEETS. PACKAGES #1 AND #2 ARE NOW READY TO ROUTE. KMM
|
Received Certificate of Value | | | 2/10/1997 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/10/1997 | | HOLD |
|
|
|
CALLED JIM NORMAN AND ADVISED HIN THAT MORE PLANS WERE REQUIRED. MECHANICAL, ELECTRICAL,PLUMBING AND GRADING AND DRAINAGE
|
Gay Receipt For Partial Pay | | | 2/10/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/10/1997 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/10/1997 | | HOLD |
|
|
|
CALLED JIM NORMAN AND ADVISED THAT WE NEEDED PLUMBING, MECHANICAL, ELECTRICAL AND GRADING AND DRAINAGE PLANS.
|
Application received | | | 2/10/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 3/20/1997 | | | | |
|
|
|
PACKAGE #4
|
Routing - PLAN CHECK | 4/10/1997 | | | | |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 4/8/1997 | | | | |
|
|
|
PACKAGE #3
|
Routing - PLAN CHECK | 4/8/1997 | | | | |
|
|
|
PACKAGE #2
|
Routing - MECHANICAL | | | | | |
|
|
|
PACKAGE #1
|