Permit Information
Permit NumberBLD97-00247
StatusFinaled
Name A T & T
Site Address 619 W BANNOCK ST
Project NameAT&T BUILDING
Customer Number 
ePlanReviewNo
Description
To remodel the existing entrance lobby facing Bannock Street for a new security guard station per approved plans on file. Work to include noncombustible frame, fire code sheetrock, "Class 1" finish ceiling materials, and security observation / operation equipment. This building is to have all areas fully fire sprinklered by August 20, 1997 per letter fo agreement on file with allowed exception for sprinklers per sec. 3804(d), 1991 UBC as agreed. Separate electrical, plumbing & mechanical permits are required. Fire Dept. review and approval required, to be done in field. (P.C.#052-97)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  3/23/1998 PASS
Letter of Compliance #15006 issued 3-23-98.
INSP - Final3/20/19983/20/19983/20/1998PPASS
Details
03/20/98 333 - card signed for perm
INSP-Final Inspection3/16/19983/16/19983/16/1998PPASS
DetailsRick Jackson
contractor was told through Kim M. to resubmit changes to heat penetrating 2 hour wall. Kim will have final occ. approval when resubmit is approved
INSP-Final Inspection3/13/19983/13/19983/13/1998PFAIL
DetailsRick Jackson
PLEASE CALL DICK AT ###-#### TO MEET YOU THERE. need to verify smoke fire damper location in lobby. will call for reinspection
Plan Reviewer's activity  10/30/1997
Kim Maurer stopped by to see me. I explained what was occuring in the enclosure corridor with the electrical panel and then asked that he try and close out some old permits. The sixth floor remodel by US WEST involved a letter of agreement for building upgrades and a sprinkler system, stair enclosre, etc. as part of the permit. This permit has been voided, BLD1044360, after several inspections had been recorded as partial finals. We need to know what part of this project was completed and make unfinished items are finished per the aproved plans & notes. Kim will check this out for me and I will contact Mr.Mehr for US West response.
Plan Reviewer's activity  10/29/1997
Recieved response from Jim Hernandez, AT&T Project Manager concerning outstanding permits for the AT&T/US West Building. Several of the outstanding projects were credited to US West, Fritz T. Mehr, Project Manager for US West - he has not yet responded to my inquiry of of September 8, 1997. One area of concern that is a part of an AT&T project is a new electrical panel that has been installed in the existing stair enclosure exit passageway in the vicinity of the security guard station remodel. This was not a part of any approved plan we have on file. Mr. Hernandez said it was done per approved plan. I walked over to see how the work was done and talked to Dennis Fisher, Electric Service Contracting, the general for the project installing the electrical panel. He said it was an addendum to the project BLD97-0072, electrical upgrade moving the panel from the restroom to the corridor. Mr. Fisher did not have an approved plan for the change which should have gone through the structural inspector nor did he have the approved set of plans and attachments at the job sight for reference and review. I suggested that the approved plans & attachments be brought to the job site and then they should call the structural inspector to review the new panel & cable tray penetration fire stops at the basement fire walls. I returned to the office at wrote a cover letter to Kim Maurer, structural inspector, to explain my concerns and asking him to come see me and that I would put a copy of Mr. Hernandez response in his project pick up slot.
INSP - Framing/Rough-in6/3/19976/4/19976/3/1997PPASS
Details
06/04/97 333 - FRAM-OK FRAMING
INSP - Framing/Rough-in5/29/19975/30/19975/29/1997ANR
Details
05/30/97 333 - ASAP ON THE 1ST FLOOR OTH-OTHER AGENCIES NOT APPROVED
90 day tracking............. 2/10/19975/11/1997
Issue PAID IN FULL permit  3/5/1997
Print Occupancy Form  3/5/1997
Inspection Record Card- Bld  3/5/1997
Telephone call  3/5/1997
TALKED TO GEM STATE BUILDER WILL BE IN TO PICK UP PERMIT
PLANS/APPL TAKEN TO FRONT DESK  3/5/1997 PASS
Plan assigned to (DRS)2/10/1997 3/4/1997 PASS
DetailsDan Stuart
03/04/97 13:12:04 DRS - this action updated by action script from <<>> in Case No. BLD97-0247
Routing - PLAN CHECK2/25/1997 3/4/1997 PASS
Plans approved for permit based on meeting with AT&T Personel, Architects & associates working on project & building depart. plan review staff as agreed by Mr. Garrison at the meeting. Terms of August 20, 1992 letter of agreement on file to be met by Aug. 20, 1997.
Print Pending Permit.LaserJet4  3/4/1997 PASS
Print Pending Permit.LaserJet4  3/4/1997 PASS
Approved based on meeting of August 27, 1997 and agreement thereto.
Telephone call  2/28/1997
Matt Grillo returned my call from Friday, March 28, 1997, concerning what condition existed for the mechanical remodel indicated on plans. Matt had included the Mechanical Eng., Mike Meints on a conference call. The large duct running through the exit enclosure is existing as well as other ducts shown. the only mechnaical work within the exit enclosure is a new mechanical unit to be in new location within the enclosure to help circulate air and heat to the guard station. I explained that I would issue the permit for the guard station security upgrade as agreed in our meeting of Aug. 27, 1997 but it would be necessary to review the existing construction conditions under the original code used to design the area and see if requirments for enclosure corridor extension have been met. I will follow up with a letter to all concerned as a part of this permit comments.
Telephone call  2/28/1997
Called Jay Watkins of MCB Architects, architect for this project to see if he had reviewed the existing conditions within the stair enclosure extension serving the stair enclosure and elevators per Sec. 1009, 1994 UBC & original code under which the area was designed for compliance with 2-hour construction, opening protection & penetration protection. Jay said he was not sure of existing conditions since the scope of the project was for a security station remodel within the existing exit enclosure. Jay was ask to find out existing conditions for code compliance fo exiting and to provide me with a report of his findings.
Telephone call  2/28/1997
Called Matt Grillo of Cator, Ruma & Assoc. Co. concerning the existing construction of the existing exit enclosure serving the interior stair enclosure and elevator lobby. Matt was not sure how the facility was reviewed for the guard station remodel or what existing conditions are. matt suggested I contact Jay Watkins of MCB Architects, since he had prepared the plans.
Telephone call  2/28/1997
talked to bob edwards at esco, permit ready, fee due
Meeting  2/27/1997
Meeting with Matt Garillo & Mike Meints of Cator, Ruma & Assocs. Co., Jim Hernandez and Dawn Logan, all representing AT&T and US West and Dick Pierce, Marlene Southard, Bob Garrison & Dan Stuart, representing the paln check div., building dept. Dick is working on a permit for a remodel in the basement for a new generator room, fuel supply and assocciated separations and I am working on the Security Guard upgrade permit. Ther is a descrepincy between groups as to what areas of the facility require fire sprinkler protection under an august 20, 1992 agreement between AT&T, US WEST, Bldg. Dept. & Fire Depts per exception 3804(d), 1991 UBC. Work has been going on within the facility to provide a sprinkler system and smoke detection system per the agreement. As near as we can determine the work has been done without inspections for final approval and the work appears to have been done as part of a 6th floor remodel building permit, issued in 1992, that created a habitable use on the sixth floor thus making the building a high-rise. The building dept. contendes that the sprinkler system needs to extend into the battery and generator room and any other area not specifically exempted by the above noted exception. Dawn Logan said she would work with the company's involved to determine if they wopuld comply with the requirement or apeal the decision to an appeals board. Based on this comment, Bob Garrison said the city would issued both permits currenntly in review process. Dawn said she would check the stair enclosure's to see if the sprinkler system had been installed within in them as required by code and call and let me know what she finds.
Recd Pcfee & Taken To Pln CK  2/10/1997
Plan routing begun/TENANTS  2/10/1997
This plan to be reviewed by PLAN CHECK only. Provide a copy of permit and plan review to the Fire Department for their records.
Gay Receipt For Partial Pay  2/10/1997
Application received  2/10/1997