Case Summary (BLD) | | | 7/23/2010 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/28/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8412 issued 9-28-00 to Affordable Storage.
|
Permanent Occupancy | | 9/22/2000 | 9/22/2000 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 5/2/2000 | | PASS |
|
|
|
Meets compliance with DR - PASS
|
INSP - Final | 10/21/1998 | 10/21/1998 | 10/21/1998 | | PART |
|
|
|
/ / 338 - BOND FOR P/Z RECIEVED ; SIGNED THE TEMP COL FOR P/Z AND STR.
|
INSP-Final Inspection | 8/24/1998 | 8/24/1998 | 8/24/1998 | P | |
Joe Tawney
|
|
|
BUTCH ###-#### FIRE INSPECTON ON SHEET ROCK SCREW PATTERN
|
INSP - Framing/Rough-in | 7/13/1998 | 7/14/1998 | 7/14/1998 | P | NR |
|
|
|
07/13/98 338 - r-bar placed
|
INSP - Framing/Rough-in | 7/8/1998 | 7/9/1998 | 7/9/1998 | P | PART |
|
|
|
07/09/98 338 - FRMS-OK FORMS-REBAR for precast headers and bond beams
|
Plan resubmittals received | | | 3/18/1998 | | |
|
|
|
RECEIVED TWO COPIES OF REPLACEMENT WALL BRACE CALCULATIONS FOR BUILDINGS WITH TOP OF MASONRY WALL ELEVATIONS OVER 9'-0" TWO COPIES OF REVISED PLANS. ROUTED TO PERRY PAINE. ONE COPY OF LETTER ROUTED TO RON HILL. KMM
|
Plan resubmittals received | | | 2/27/1998 | | |
|
|
|
RECEIVED 2 COPIES OF REPLACEMENT WALL BRACE CALCULATIONS FOR BUILDINGS 1-5 2 COPIES OF REVISED PLANS. ROUTED TO RON HILL.
|
(F) Reprint permit | | | 2/23/1998 | | |
|
|
|
|
(F) Reprint permit | | | 2/5/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/5/1998 | | |
|
|
|
|
Plan assigned to (R_H) | 4/7/1997 | | 1/22/1998 | | PASS |
|
|
|
01/22/98 11:36:24 R_H - this action updated by action script from <<>> in Case No. BLD97-0405
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 1/22/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/22/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 1/22/1998 | | |
|
|
|
|
Plan Reviewer's activity | | | 1/14/1998 | | PEND |
|
|
|
NOTE: ORIGINAL PLANS SUBMITTED UNDER ARCHITECT; CHARLES LOYD #6349; HAVE BEEN WITH DRAWN AND RESUBMITTED UNDER A NEW ENGINEER OF RECORD DEAN BRIGGS DEC. 23 1997. PERFORMED PLAN REVIEW OF NEW PLANS AND WILL ISSUE SEPARATE PERMITS FOR EACH STRUCTURE. TOTAL OF 12.
|
Routing - FIRE | 12/31/1997 | | 1/6/1998 | | PASS |
|
|
|
|
Telephone call | | | 12/2/1997 | | FAIL |
|
|
|
Spoke with Dean Briggs, he has indicated that he will be designated as the engineer of record and that he is going to do all the required changes to the plans. I faxed him a copy of our form for him to have the owner designate him as the engineer of record, and a letter stating what he has to do see file for letter.
|
Plan Reviewer's activity | | | 11/5/1997 | | HOLD |
|
|
|
Spoke with Dirk Marcum He indicated that Briggs Engineering would be the engineer of record and would submit the whole set of complying plans. I told him that he still needed to meet the fire department requirements. And Submit a complete set of plans that tie the whole buildings together.
|
Plan Reviewer's activity | | | 10/23/1997 | | HOLD |
|
|
|
HAD MEETING WITH OWNER DIRK DISCUSSED RESUBMITTED ENGINEERING. INFORMED HIM THAT HE STILL HAD TO CHANGE THE UL#LISTING, AND MEET THE FIRE DEPARTMENTS REQUIREMENTS.
|
Routing - FIRE | 8/18/1997 | | 8/28/1997 | | FAIL |
|
|
|
|
Telephone call | | | 8/19/1997 | | FAIL |
|
|
|
Called engineer at RABCO asked for ICBO ES Report was told the person I need to talk to will not be in untill Thursday 8-21-97. Left message for him to call me.
|
Plan Reviewer's activity | | | 8/18/1997 | | FAIL |
|
|
|
Met with owner Dirk Marcum. Explained the items that were needed to continue plan check./ Routed to fire department.
|
Routing - ELECTRICAL | 8/11/1997 | | 8/15/1997 | | PASS |
|
|
|
ELECTRICAL SHEETS RECEIVED 4-23-97. KMM
|
Telephone call | | | 8/14/1997 | | FAIL |
|
|
|
Talked to engineer Charles Loyd of Rabco Buildings and asked if he had received my plan check requirements he indicated he had not.
|
Plan Reviewer's activity | | | 8/14/1997 | | FAIL |
|
|
|
Met with owner Dirk Marlum, we discussed the plan check requirements and what was needed to continue the plan check. He indicated that he was going to hire a local engineer to complete the design requirements.
|
Plan Reviewer's activity | | | 8/11/1997 | | FAIL |
|
|
|
Plans are incomplete mailed requirements to Tracey Pearson project manager and Engineer Charles Loyd on 8-08-97. Need engineering, masonry plans, foundation plans, and new UL# design for one-hour rated exterior walls. Routed to Electrical division for review.
|
Routing - PLANNING | 7/24/1997 | | 7/31/1997 | | FAIL |
|
|
|
X-REF: RZ-12-94/DA & DR-29-96. APPLICANT NEED TO SUBMIT A REVISED LANDSCAPE PLAN WHICH COMPLIES WITH DR CONDITIONS OF APPROVAL. LEFT TWO MESSAGES FOR TRACEY PERSONS. REVIEWED BY RC & MGS.
|
Routing - PUBLIC WORKS | 5/5/1997 | | 7/23/1997 | | PASS |
|
|
|
|
90 day tracking............. | | 2/25/1997 | 5/26/1997 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 3/31/1997 | | 4/23/1997 | | PASS |
|
|
|
CONTACTED TRACEY PERSONS AT ###-#### TO TAKE PLANS OUT TO ACHD
|
Plans ACCEPTED BY PLAN CHECK | | | 3/31/1997 | | PASS |
|
|
|
I AM STILL WAITING FOR ELEC. PLANS BUT AM GOING TO ROUTE.
|
Plan routing begun/NEW & ADDTN | | | 3/31/1997 | | PASS |
|
|
|
STILL REQUIRE ELECTRICAL SHEETS.
|
Plan assigned to (RGG) | 3/5/1997 | | 3/5/1997 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/25/1997 | | HOLD |
|
|
|
NEED DRAINAGE CALCS, SITE PLAN, SOIL BEARING AND CIVIL SHEETS. ALSO WAITING ELEC. SHEETS RECEIVED SITE PLAN, AND CIVIL SHEETS 02-27-97 RECEIVED DRAINAGE CALCS, AND SOIL BEARING LETTER 3-24-97 CALLED TRACEY TO LET HER KNOW THAT ALL I NEED NOW ARE MY ELEC. SHEETS.3-25-97 ELECTRICAL SHEETS RECEIVED 4-23-97. KMM
|
Received Certificate of Value | | | 2/25/1997 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/1997 | | |
|
|
|
|
Application received | | | 2/25/1997 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Routing - PLAN CHECK | 1/6/1998 | | | | |
|
|
|
|
Routing - PLAN CHECK | 7/31/1997 | | | | |
|
|
|
|
Routing - PLAN CHECK | 8/28/1997 | | | | |
|
|
|
|
Routing - PLAN CHECK | 8/15/1997 | | | | |
|
|
|
|