Permanent Occupancy | | 9/19/1997 | 9/19/1997 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/18/1997 | 9/19/1997 | 9/19/1997 | A | PASS |
Joe Tawney
|
|
|
09/19/97 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Final | 9/18/1997 | 9/19/1997 | 9/19/1997 | P | PASS |
|
|
|
09/19/97 338 - made ok signed final col of the occreq card //copy of sam office
|
INSP - Final | 9/12/1997 | 9/15/1997 | 9/15/1997 | P | PART |
|
|
|
09/15/97 338 - other agencies ok for the temp col of the 0
|
Temporary occupancy | | | 9/15/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3470 issued 9-15-97 to Strata.
|
INSP-Final Inspection | 9/11/1997 | 9/12/1997 | 9/12/1997 | A | PART |
Joe Tawney
|
|
|
09/12/97 406 - FINAL OK FOR TEMP OCC PULL STATION & HORN/STROBE CURB S
|
INSP-Sprinkler Rough-in/Hydro | 8/27/1997 | 8/27/1997 | 8/27/1997 | P | PART |
Joe Tawney
|
|
|
08/27/97 406 - said 1:00 and 2:00 OK ON HYDRO TESTS FOR WET AND DRY SYSTEMS
|
INSP-Supply line flush | 8/26/1997 | 8/26/1997 | 8/26/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Ceiling grid | 8/14/1997 | 8/15/1997 | 8/15/1997 | A | PASS |
|
|
|
08/15/97 338 - made ok to drop tiles
|
INSP - Framing/Rough-in | 7/21/1997 | 7/22/1997 | 7/22/1997 | A | PASS |
|
|
|
07/22/97 338 - made ok
|
INSP - Framing/Rough-in | 7/8/1997 | 7/8/1997 | 7/8/1997 | P | PART |
|
|
|
07/08/97 338 - ok to cover the walls only with the ele insp approval
|
INSP - Conference | 6/25/1997 | 6/25/1997 | 6/25/1997 | | PASS |
|
|
|
/ / 338 - CONTR WILL CALL IF THEY GET READY IN THE PM
|
INSP - Framing/Rough-in | 6/25/1997 | 6/25/1997 | 6/25/1997 | | PART |
|
|
|
/ / 338 - made ok for the lab section only
|
INSP - Framing/Rough-in | 6/24/1997 | 6/25/1997 | 6/25/1997 | P | NR |
|
|
|
06/25/97 338 - not ready
|
INSP-Sprinkler Rough-in/Hydro | 6/23/1997 | 6/23/1997 | 6/23/1997 | P | PART |
Joe Tawney
|
|
|
06/23/97 406 - SUPT IS BOB, ATTIC DRY SYSTEM FOR COVER ROUGH IN OF PART OF DRY SYSTEM IN ATTIC AREA OK TO COVER
|
INSP - Carpentry | 6/13/1997 | 6/13/1997 | 6/13/1997 | | PASS |
|
|
|
/ / 338 - check the shear nailing
|
INSP - Carpentry | 6/13/1997 | 6/13/1997 | 6/13/1997 | P | NH |
|
|
|
06/13/97 338 - out of time will do 6/17/97
|
INSP - Conference | 6/6/1997 | 6/6/1997 | 6/6/1997 | P | PASS |
|
|
|
06/06/97 338 - madeok questions on the tunnel assy for the small corrido
|
90 day tracking............. | | 2/25/1997 | 5/26/1997 | | PEND |
|
|
|
|
INSP - Flatwork | 5/12/1997 | 5/12/1997 | 5/12/1997 | P | PASS |
Jim Storey
|
|
|
05/12/97 301 - slab ok covered by si
|
INSP - Footings | 5/8/1997 | 5/9/1997 | 5/9/1997 | A | PASS |
Jim Storey
|
|
|
05/09/97 301 - LATE AM FTG -OK FOOTING
|
INSP - Foundation | 4/24/1997 | 4/25/1997 | 4/25/1997 | A | PART |
|
|
|
04/25/97 338 - wall inspection partial sofit framing will call for 4/28
|
INSP - Footings | 4/22/1997 | 4/23/1997 | 4/23/1997 | P | PASS |
|
|
|
04/23/97 338 - sp insp ok r-bar placed FTG -OK FOOTING
|
(F) Reprint permit | | | 4/23/1997 | | |
|
|
|
|
Plan assigned to (M_O) | 3/18/1997 | | 4/22/1997 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/1997 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 4/22/1997 | | |
|
|
|
|
Telephone call | | | 4/22/1997 | | PASS |
|
|
|
LENORD IS ON HIS WAY DOWN.
|
Print Occupancy Form | | | 4/22/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/22/1997 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/28/1997 | | 4/21/1997 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/16/1997 | | FAIL |
|
|
|
REVISIONS FOR PKG # 2 AND 3 MO.
|
Routing Off Site - A.C.H.D | 2/27/1997 | | 4/11/1997 | | PASS |
|
|
|
CONTACTED STEVE PARDEW AT ###-#### TO TAKE PLANS OUT TO ACHD PACKAGE #4 ACHD FEES PAID. DAR
|
Plan resubmittals received | | | 3/28/1997 | | FAIL |
|
|
|
This resubmittal is for addendums per owner and do not reflect plan review corrections for UBC. MO
|
Routing - FIRE | 3/27/1997 | | 3/28/1997 | | PASS |
|
|
|
PACKAGE #1 APPROVED FOR GRADING 3-12-97
|
Plan resubmittals requested | | | 3/26/1997 | | FAIL |
|
|
|
corrections mailed and faxed to the architect 3-26-97. MO
|
Routing - PUBLIC WORKS | 3/17/1997 | | 3/19/1997 | | PASS |
|
|
|
|
Routing - PLUMBING | 3/17/1997 | | 3/18/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plan assigned to (RGG) | 2/27/1997 | | 3/18/1997 | | |
|
|
|
|
Plan resubmittals received | | | 3/17/1997 | | PASS |
|
|
|
RECEIVED 4 SHEETS OF P-1. PUT 2 SHEETS WITH PACKAGE #2 AND 2 SHEETS IN WALL FILE WAITING FOR PACKAGE #2 TO COME BACK FROM PW. KMM
|
Routing - ELECTRICAL | 3/17/1997 | | 3/17/1997 | | PASS |
|
|
|
NO REVIEW WILL FIELD VERIFY.
|
Routing - PLANNING | 3/11/1997 | | 3/17/1997 | | PASS |
|
|
|
PACKAGE #2 X-ref: DR-9-97. Approved by MS.
|
Routing Off Site - STRUCTURAL | 2/27/1997 | | 3/11/1997 | | FAIL |
|
|
|
PACKAGE #3 WILL CONT.PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN & JONES CONTACTED STEVE PARDEW REQUESTING A SOIL REPORT. PLANS STATE A SOIL BEARING PRESSURE OF 2500 PSF received soils report sent to Atwood, Hinzman & Jones via mail. 03-03-97
|
Routing - PLUMBING | 3/6/1997 | | 3/10/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Received Certificate of Value | | | 3/6/1997 | | PASS |
|
|
|
RECEIVED REVISED CERTIFICATES VALUE STATING $127,000 FOR A GRADING AND DRAINAGE PERMIT AND ONE STATING $846,000 FOR BLDG.
|
Routing - ELECTRICAL | 2/27/1997 | | 3/5/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Routing - MECHANICAL | 2/27/1997 | | 2/27/1997 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW FIELD VERIFY
|
Plan routing begun/NEW & ADDTN | | | 2/27/1997 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/1997 | | |
|
|
|
|
Received Certificate of Value | | | 2/25/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/25/1997 | | PASS |
|
|
|
|
Application received | | | 2/25/1997 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/27/1997 | | 2/11/1997 | | FAIL |
|
|
|
PACKAGE #2 NEEDS DRAINAGE PLAN REVISION AND STREET LIGHT PLAN. BM & B. COLESON
|