Permit Information
Permit NumberBLD97-00413
StatusFinaled
Name ORION DEVELOPMENT
Site Address 8880 W BARNES ST
Project NameOFFICE BUILDING
Customer Number 
ePlanReviewNo
Description
ORION DEVELOPMENT * TO CONSTRUCT A NEW SINGLE STORY, WOOD FRAMED TYPE V-NONRATED 5080 SQ.FT.OFFICE BUILDING AND STORAGE/STOCK ROOM. THE OFFICE AREA IS APPROXIMATELY 3964 SQ.FT. THE STORAGE AREA IS APPROXIMATELY 936 SQ.FT. WITH A 180 SQ.FT. COVERED ENTRY. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST CABO/ANSI STANDARDS A-117.1, AND THE 1994 EDITION OF THE UBC. THIS PERMIT INCLUDES THE RELATED SITE IMPROVEMENTS. MJP (PC# 090-97) DR-85-96,
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/28/19978/28/1997 DONE
Details
Permanent Occupancy 8/28/19978/28/1997 DONE
Details
INSP - Conference8/28/19978/28/19978/28/1997APASS
DetailsJack Frank
signed off perm. occupancy data system installer made corrections jf ok
Permanent occupancy  8/28/1997 PASS
Perm. Occ. Cert. #6956 issued 8-28-97 to Orion Development.
Temporary occupancy  8/25/1997 PASS
Temp. Occ. Cert. #3456 issued 8-25-97 to Orion Development.
Routing for occupancy8/22/19978/22/19978/22/1997 PASS
Inspected by Scott Brown - complies w/DR-85-96/FINALED
INSP - Final8/21/19978/22/19978/22/1997PPART
Details
08/22/97 338 - signed the temp col of the occ req card followed ele.
INSP-Final Inspection8/22/19978/22/19978/22/1997PPASS
DetailsJoe Tawney
08/22/97 406 - REINSP FOR FINAL OK FOR PERM OCC
INSP-Final Inspection8/19/19978/19/19978/19/1997PNR
DetailsJoe Tawney
08/19/97 406 - REINSP FOR FINAL NOT READY
INSP - Final8/19/19978/19/19978/19/1997 PART
DetailsJoe Tawney
/ / 406 - REISNP FOR FINAL OK FOR TEMP OCC 2 EMERG LIGHTS NOT YET INS
INSP - Final8/18/19978/18/19978/18/1997 FAIL
DetailsJoe Tawney
/ / 406 - FINAL FAIL FIRE EXT TAGS EMERGENCY LIGHTS
INSP - Final8/18/19978/18/19978/18/1997 FAIL
Details
08/18/97 338 - not ready OTH-OTHER AGENCIES NOT APPROVED
INSP - Final8/18/19978/18/19978/18/1997 FAIL
Details
08/18/97 338 - not ready OTH-OTHER AGENCIES NOT APPROVED
INSP - Ceiling grid7/15/19977/16/19977/17/1997ACANC
Details
07/16/97 338 - done by 342
INSP - Ceiling grid7/16/19977/16/19977/16/1997PPASS
DetailsWes Worcester
INSP - Ceiling grid7/10/19977/11/19977/11/1997ANR
DetailsTom Arcoraci
INSP - Conference6/16/19976/16/19976/16/1997 PASS
Details
/ / 338 - ok to use drywall screws in place of nails on rated wall con
INSP - Framing/Rough-in6/16/19976/16/19976/16/1997PNH
Details
06/16/97 338 - out of time will do tomorrow am
INSP - Framing/Rough-in6/16/19976/16/19976/16/1997 PASS
Details
/ / 338 - FRAM-OK FRAMING
INSP - Framing/Rough-in6/12/19976/13/19976/13/1997PCANC
Details
06/13/97 338 - done by 301
INSP - Energy code compliance6/12/19976/13/19976/12/1997ANH
Details
06/13/97 338 - not necessary with com building
INSP - Framing/Rough-in6/5/19976/5/19976/5/1997PPASS
Details
06/05/97 338 - ok for the exterior sheathing only
INSP - Framing/Rough-in5/30/19975/30/19975/30/1997PCANC
Details
05/30/97 338 - cancelled till #1 monday a.m.
INSP - Framing/ Rough-in5/30/19975/30/19975/30/1997 PART
Details
/ / 338 - ok to drywall the bottom of the trusses only
INSP - Framing/Rough-in5/28/19975/28/19975/28/1997PPASS
Details
05/28/97 338 - carpentry
90 day tracking............. 2/25/19975/26/1997 PEND
INSP - Conference5/15/19975/15/19975/15/1997 PASS
Details
/ / 338 - q,s on the engineered changes for strap sizing etc all are t approved by me 1:00/2:30 pm
INSP - Masonry5/1/19975/2/19975/2/1997APART
DetailsCarl Dependahl
05/02/97 340 - CONCRETE WALL ì
INSP - Foundation5/2/19975/2/19975/2/1997 PART
DetailsCarl Dependahl
/ / 340 - ENG'G SHOWS 2500 PSI CONC, NO SPEC INSP. OK
INSP - Footings4/30/19975/1/19975/1/1997APASS
DetailsCarl Dependahl
05/01/97 340 - OK, STEEL TIED
INSP - Conference5/1/19975/1/19975/1/1997 PASS
DetailsCarl Dependahl
/ / 340 - QUICK STRUCT CONF W/ SUPT. CHK FRAME DETAILS
INSP - Conference5/1/19975/1/19975/1/1997 PASS
DetailsCarl Dependahl
/ / 340 - QUICK STRUCT CONF W/ SUPT. CHK FRAME DETAILS
INSP - Conference5/1/19975/1/19975/1/1997 PASS
DetailsCarl Dependahl
/ / 340 - NR TIL 2PM
(F) Reprint permit  4/30/1997
Issue PAID IN FULL permit  4/29/1997
Plan assigned to (M_P)3/19/1997 4/28/1997
DetailsMike Phillips
PLANS/APPL TAKEN TO FRONT DESK  4/28/1997 PASS
Print Pending Permit.LaserJet4  4/28/1997 PASS
Plan Reviewer's activity  4/28/1997 PASS
Inspection Record Card- Bld  4/28/1997
Telephone call  4/28/1997
PERMIT READY, FEE DUE
Print Occupancy Form  4/28/1997
Plan resubmittals received  4/25/1997
RESUBS RECEIVED SHEETS A-1,A-2,A-3,A-4,A-5,A-6, (4 SETS OF EACH). GIVEN TO MIKE P. KMM
Routing - PLANNING4/22/1997 4/22/1997 PASS
x-ref: DR-89-96 Approved by: MGS
Routing - PUBLIC WORKS4/8/1997 4/21/1997 PASS
PACKAGE #2
Routing Off Site - STRUCTURAL4/8/1997 4/16/1997 PASS
SENT PACKAGE #3 OUT FOR STRUCTURAL REVIEW
Plan resubmittals received  4/8/1997
RESUBMITTALS FOR PACKAGES #1 AND #3. RESUBS FOR PACKAGE #3 SENT BACK OUT TO STAPLEY, AND #1 GIVEN TO MIKE P. KMM
Routing - FIRE3/31/1997 4/4/1997 PASS
PACKAGE #1
Routing - PLAN CHECK3/17/1997 3/31/1997
PACKAGE #1
Print Pending Permit.LaserJet4  3/28/1997 FAIL
Plan Reviewer's activity  3/28/1997 FAIL
Routing Off Site - A.C.H.D3/4/1997 3/28/1997 PASS
PACKAGE #4 CONTACTED MIKE FALASH AT ###-#### TO TAKE PLANS OUT TO ACHD CONTACTED MARCUS GREEN TO INFORM HIM THAT I AM SENDING A REVISED SITE PLAN SHEET (S-1) VIA PDQ (2 SHEETS SENT) KMM 1-13-97 FEES PAID. CALLED TO SEE IF HE SAW RESUBMITTED S-1 SHEETS BECAUSE THEY WERE NOT IN THE PLANS I RECEIVED BACK FROM ACHD. I WILL CALL MONDAY 3-31-97 AND CONFIRM. 3-28-97 KMM 4-1-97 RECEIVED APPROVED RESUBMITTED SITE PLAN SHEET (S-1) FROM MARCUS GREEN. GAVE THEM TO MIKE P. TO PUT WITH PACKAGE #4
Routing - PUBLIC WORKS3/19/1997 3/25/1997 FAIL
SAME AS BEFORE ON REQUIREMENTS.
Plan assigned to (RGG)3/3/1997 3/19/1997
Routing - PLANNING3/13/1997 3/18/1997 FAIL
PACKAGE #2 Applicant needs to comply with setback & forestry requirements. See leeter in file dated 3/18/97. X-ref: DR-85-96. Reviewed by MS.
Routing - PLUMBING3/12/1997 3/17/1997 PASS
PACKAGE #1
Plan resubmittals received  3/13/1997
RECEIVED 6 REVISED SITE PLAN SHEETS (S-1) and 1 REVISED LANDSCAPE PLAN. WE STILL NEED ONE MORE LANDSCAPE SHEET. KMM PUT 2 REVISED SITE PLAN SHEETS (S-1) WITH PACKAGE #4 AND SENT OUT TO ACHD VIA PDQ ATTEN: MARCUS GREEN 3-13-97 PUT 2 REVISED SITE PLAN SHEETS (S-1) WITH PACKAGE #1 WHEN BACK FROM PLUMB. KMM 3-13-97 PUT 2 REVISED SITE PLAN SHEETS (S-1) WITH PACKAGE #2 AND 2 LANDSCAPE PLAN SHEETS WITH PACKAGE 2 3-13-97
Routing - PLANNING3/11/1997 3/12/1997 FAIL
PACKAGE #2 Applicant needs to provide revised landscape plans & comply with parking lot setback @ SE corner. (phoned applicant 3/12/97) X-ref: DR-85-96. Reviewed by MS.
Routing - ELECTRICAL3/5/1997 3/12/1997 PASS
PACKAGE #1
Routing - PUBLIC WORKS3/4/1997 3/10/1997 FAIL
PACKAGE #2 NEEDS DRAINAGE PLAN & STREET LIGHT PLAN. BRIAN MURPHY AND BILL COLSON
Routing Off Site - STRUCTURAL3/5/1997 3/7/1997 FAIL
PACKAGE #3 PLANS SENT OUT TO STAPLEY ENG. VIA PDQ
Routing - MECHANICAL3/5/1997 3/5/1997 PASS
PACKAGE #1 NO REVIEW WILL FIELD VERIFY
Plans ACCEPTED BY PLAN CHECK  3/4/1997 PASS
RECEIVED DRAINAGE CALCS. 03-03-97 PACKAGE #2 AND #4 READY TO ROUTE. PACKAGE #1 AND #3 STILL NEED TRUSS CALCS. RECEIVED TRUSS CALCS. FOR PACKAGES #1 AND #3. PLANS READY FOR ROUTING. KMM 03-05-97
Plans ACCEPTED BY PLAN CHECK  3/3/1997 HOLD
PACKAGE #2 REQUIRES DRAINAGE CACULATIONS. PACKAGE #3 REQUIRES TRUSS DESIGN AND CACULATIONS.
Recd Pcfee & Taken To Pln CK  2/25/1997
Application received  2/25/1997