Permanent Occupancy | | 8/28/1997 | 8/28/1997 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/28/1997 | 8/28/1997 | | DONE |
|
|
|
|
INSP - Conference | 8/28/1997 | 8/28/1997 | 8/28/1997 | A | PASS |
Jack Frank
|
|
|
signed off perm. occupancy data system installer made corrections jf ok
|
Permanent occupancy | | | 8/28/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #6956 issued 8-28-97 to Orion Development.
|
Temporary occupancy | | | 8/25/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3456 issued 8-25-97 to Orion Development.
|
Routing for occupancy | 8/22/1997 | 8/22/1997 | 8/22/1997 | | PASS |
|
|
|
Inspected by Scott Brown - complies w/DR-85-96/FINALED
|
INSP - Final | 8/21/1997 | 8/22/1997 | 8/22/1997 | P | PART |
|
|
|
08/22/97 338 - signed the temp col of the occ req card followed ele.
|
INSP-Final Inspection | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | PASS |
Joe Tawney
|
|
|
08/22/97 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP-Final Inspection | 8/19/1997 | 8/19/1997 | 8/19/1997 | P | NR |
Joe Tawney
|
|
|
08/19/97 406 - REINSP FOR FINAL NOT READY
|
INSP - Final | 8/19/1997 | 8/19/1997 | 8/19/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - REISNP FOR FINAL OK FOR TEMP OCC 2 EMERG LIGHTS NOT YET INS
|
INSP - Final | 8/18/1997 | 8/18/1997 | 8/18/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL FAIL FIRE EXT TAGS EMERGENCY LIGHTS
|
INSP - Final | 8/18/1997 | 8/18/1997 | 8/18/1997 | | FAIL |
|
|
|
08/18/97 338 - not ready OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Final | 8/18/1997 | 8/18/1997 | 8/18/1997 | | FAIL |
|
|
|
08/18/97 338 - not ready OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Ceiling grid | 7/15/1997 | 7/16/1997 | 7/17/1997 | A | CANC |
|
|
|
07/16/97 338 - done by 342
|
INSP - Ceiling grid | 7/16/1997 | 7/16/1997 | 7/16/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Ceiling grid | 7/10/1997 | 7/11/1997 | 7/11/1997 | A | NR |
Tom Arcoraci
|
|
|
|
INSP - Conference | 6/16/1997 | 6/16/1997 | 6/16/1997 | | PASS |
|
|
|
/ / 338 - ok to use drywall screws in place of nails on rated wall con
|
INSP - Framing/Rough-in | 6/16/1997 | 6/16/1997 | 6/16/1997 | P | NH |
|
|
|
06/16/97 338 - out of time will do tomorrow am
|
INSP - Framing/Rough-in | 6/16/1997 | 6/16/1997 | 6/16/1997 | | PASS |
|
|
|
/ / 338 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 6/12/1997 | 6/13/1997 | 6/13/1997 | P | CANC |
|
|
|
06/13/97 338 - done by 301
|
INSP - Energy code compliance | 6/12/1997 | 6/13/1997 | 6/12/1997 | A | NH |
|
|
|
06/13/97 338 - not necessary with com building
|
INSP - Framing/Rough-in | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | PASS |
|
|
|
06/05/97 338 - ok for the exterior sheathing only
|
INSP - Framing/Rough-in | 5/30/1997 | 5/30/1997 | 5/30/1997 | P | CANC |
|
|
|
05/30/97 338 - cancelled till #1 monday a.m.
|
INSP - Framing/ Rough-in | 5/30/1997 | 5/30/1997 | 5/30/1997 | | PART |
|
|
|
/ / 338 - ok to drywall the bottom of the trusses only
|
INSP - Framing/Rough-in | 5/28/1997 | 5/28/1997 | 5/28/1997 | P | PASS |
|
|
|
05/28/97 338 - carpentry
|
90 day tracking............. | | 2/25/1997 | 5/26/1997 | | PEND |
|
|
|
|
INSP - Conference | 5/15/1997 | 5/15/1997 | 5/15/1997 | | PASS |
|
|
|
/ / 338 - q,s on the engineered changes for strap sizing etc all are t approved by me 1:00/2:30 pm
|
INSP - Masonry | 5/1/1997 | 5/2/1997 | 5/2/1997 | A | PART |
Carl Dependahl
|
|
|
05/02/97 340 - CONCRETE WALL ì
|
INSP - Foundation | 5/2/1997 | 5/2/1997 | 5/2/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - ENG'G SHOWS 2500 PSI CONC, NO SPEC INSP. OK
|
INSP - Footings | 4/30/1997 | 5/1/1997 | 5/1/1997 | A | PASS |
Carl Dependahl
|
|
|
05/01/97 340 - OK, STEEL TIED
|
INSP - Conference | 5/1/1997 | 5/1/1997 | 5/1/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - QUICK STRUCT CONF W/ SUPT. CHK FRAME DETAILS
|
INSP - Conference | 5/1/1997 | 5/1/1997 | 5/1/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - QUICK STRUCT CONF W/ SUPT. CHK FRAME DETAILS
|
INSP - Conference | 5/1/1997 | 5/1/1997 | 5/1/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - NR TIL 2PM
|
(F) Reprint permit | | | 4/30/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/29/1997 | | |
|
|
|
|
Plan assigned to (M_P) | 3/19/1997 | | 4/28/1997 | | |
Mike Phillips
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/1997 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/28/1997 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/28/1997 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/1997 | | |
|
|
|
|
Telephone call | | | 4/28/1997 | | |
|
|
|
PERMIT READY, FEE DUE
|
Print Occupancy Form | | | 4/28/1997 | | |
|
|
|
|
Plan resubmittals received | | | 4/25/1997 | | |
|
|
|
RESUBS RECEIVED SHEETS A-1,A-2,A-3,A-4,A-5,A-6, (4 SETS OF EACH). GIVEN TO MIKE P. KMM
|
Routing - PLANNING | 4/22/1997 | | 4/22/1997 | | PASS |
|
|
|
x-ref: DR-89-96 Approved by: MGS
|
Routing - PUBLIC WORKS | 4/8/1997 | | 4/21/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing Off Site - STRUCTURAL | 4/8/1997 | | 4/16/1997 | | PASS |
|
|
|
SENT PACKAGE #3 OUT FOR STRUCTURAL REVIEW
|
Plan resubmittals received | | | 4/8/1997 | | |
|
|
|
RESUBMITTALS FOR PACKAGES #1 AND #3. RESUBS FOR PACKAGE #3 SENT BACK OUT TO STAPLEY, AND #1 GIVEN TO MIKE P. KMM
|
Routing - FIRE | 3/31/1997 | | 4/4/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 3/17/1997 | | 3/31/1997 | | |
|
|
|
PACKAGE #1
|
Print Pending Permit.LaserJet4 | | | 3/28/1997 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 3/28/1997 | | FAIL |
|
|
|
|
Routing Off Site - A.C.H.D | 3/4/1997 | | 3/28/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED MIKE FALASH AT ###-#### TO TAKE PLANS OUT TO ACHD CONTACTED MARCUS GREEN TO INFORM HIM THAT I AM SENDING A REVISED SITE PLAN SHEET (S-1) VIA PDQ (2 SHEETS SENT) KMM 1-13-97 FEES PAID. CALLED TO SEE IF HE SAW RESUBMITTED S-1 SHEETS BECAUSE THEY WERE NOT IN THE PLANS I RECEIVED BACK FROM ACHD. I WILL CALL MONDAY 3-31-97 AND CONFIRM. 3-28-97 KMM 4-1-97 RECEIVED APPROVED RESUBMITTED SITE PLAN SHEET (S-1) FROM MARCUS GREEN. GAVE THEM TO MIKE P. TO PUT WITH PACKAGE #4
|
Routing - PUBLIC WORKS | 3/19/1997 | | 3/25/1997 | | FAIL |
|
|
|
SAME AS BEFORE ON REQUIREMENTS.
|
Plan assigned to (RGG) | 3/3/1997 | | 3/19/1997 | | |
|
|
|
|
Routing - PLANNING | 3/13/1997 | | 3/18/1997 | | FAIL |
|
|
|
PACKAGE #2 Applicant needs to comply with setback & forestry requirements. See leeter in file dated 3/18/97. X-ref: DR-85-96. Reviewed by MS.
|
Routing - PLUMBING | 3/12/1997 | | 3/17/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plan resubmittals received | | | 3/13/1997 | | |
|
|
|
RECEIVED 6 REVISED SITE PLAN SHEETS (S-1) and 1 REVISED LANDSCAPE PLAN. WE STILL NEED ONE MORE LANDSCAPE SHEET. KMM PUT 2 REVISED SITE PLAN SHEETS (S-1) WITH PACKAGE #4 AND SENT OUT TO ACHD VIA PDQ ATTEN: MARCUS GREEN 3-13-97 PUT 2 REVISED SITE PLAN SHEETS (S-1) WITH PACKAGE #1 WHEN BACK FROM PLUMB. KMM 3-13-97 PUT 2 REVISED SITE PLAN SHEETS (S-1) WITH PACKAGE #2 AND 2 LANDSCAPE PLAN SHEETS WITH PACKAGE 2 3-13-97
|
Routing - PLANNING | 3/11/1997 | | 3/12/1997 | | FAIL |
|
|
|
PACKAGE #2 Applicant needs to provide revised landscape plans & comply with parking lot setback @ SE corner. (phoned applicant 3/12/97) X-ref: DR-85-96. Reviewed by MS.
|
Routing - ELECTRICAL | 3/5/1997 | | 3/12/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 3/4/1997 | | 3/10/1997 | | FAIL |
|
|
|
PACKAGE #2 NEEDS DRAINAGE PLAN & STREET LIGHT PLAN. BRIAN MURPHY AND BILL COLSON
|
Routing Off Site - STRUCTURAL | 3/5/1997 | | 3/7/1997 | | FAIL |
|
|
|
PACKAGE #3 PLANS SENT OUT TO STAPLEY ENG. VIA PDQ
|
Routing - MECHANICAL | 3/5/1997 | | 3/5/1997 | | PASS |
|
|
|
PACKAGE #1 NO REVIEW WILL FIELD VERIFY
|
Plans ACCEPTED BY PLAN CHECK | | | 3/4/1997 | | PASS |
|
|
|
RECEIVED DRAINAGE CALCS. 03-03-97 PACKAGE #2 AND #4 READY TO ROUTE. PACKAGE #1 AND #3 STILL NEED TRUSS CALCS. RECEIVED TRUSS CALCS. FOR PACKAGES #1 AND #3. PLANS READY FOR ROUTING. KMM 03-05-97
|
Plans ACCEPTED BY PLAN CHECK | | | 3/3/1997 | | HOLD |
|
|
|
PACKAGE #2 REQUIRES DRAINAGE CACULATIONS. PACKAGE #3 REQUIRES TRUSS DESIGN AND CACULATIONS.
|
Recd Pcfee & Taken To Pln CK | | | 2/25/1997 | | |
|
|
|
|
Application received | | | 2/25/1997 | | |
|
|
|
|