Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberBLD97-00438
StatusFinaled
Name CIRCUIT CITY
Site Address 542 N MILWAUKEE
Project NameBOISE TOWNE PLAZA
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW 39,183 SQUARE FOOT BUILDING FOR THE SALE OF ELECTRONICS EQUIPMENT AND APPLIANCES. WORK TO INCLUDE ONE-HOUR OCCUPACY SEPARATIONS AROUND WAREHOUSE AREA AND CAR STEREO INSTALLATION AREA. CONSTRUCTION OF A ONE-HOUR EXIT CORRIDOR. INSTALATION OF SUSPENDED CEILING. CONSTRUCTION OF TWO HANDICAP ACCESSIBLE RESTROOMS. THE INSTALLATION OF A FIRE SPRINKLER SYSTEM THROUGH OUT BUILDING. MECHANICAL, ELECTRICAL, AND PLUMBING. DR 27-96, CU 97-95 AND PC#099-97(RMH). 6-13-97:THE EAST WALL ALONG GRIDLINE (1) IS TO BE CONSTRUCTED AS A TWO-HOUR RATED AREA SEPARATION WALL AS PER APPROVED PLANS AND ATTACHMENTS: NO ADDITIONAL VALUE (RMH)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/26/2010 DONE
Code Occupancy Approval  2/3/1998 PASS
Bond posted for $6,600.00 for Temporary Occupancy (11/13/97) Inspected for Final - All o.k. 02/03/98 - Pass.
INSP-Final Inspection10/30/199710/31/199710/31/1997APASS
DetailsJoe Tawney
10/31/97 406 - OK FOR PERM OCC
INSP - Final10/30/199710/31/199710/31/1997PPASS
Details
MADE OK OK FOR FRONT DESK TO SIGN FOR ME
Permanent Occupancy 10/31/199710/31/1997 DONE
Details
Permanent occupancy  10/31/1997 PASS
Perm. Occ. Cert. #7044 issued 10-31-97 to Circuit City Stores, Inc.
INSP - Final10/23/199710/24/199710/24/1997PNR
Details
CIRCUIT CITY need pplmg approval
INSP-Final Inspection10/23/199710/24/199710/24/1997APART
DetailsJoe Tawney
10/24/97 406 - CIRCUIT CITY/ REINSPECTION/ SAYS YOU HAVE 8:00 APT OK FOR TEMP OCC DUCT DET SMOKE SEALS FIRE DOOR ADJ EXT MARKING
INSP - Final10/23/199710/23/199710/23/1997 FAIL
DetailsJoe Tawney
/ / 406 - FINAL FAIL FIRE DOOR AND SPKLR SUPERVISION
INSP-Sprinkler Rough-in/Hydro10/20/199710/21/199710/21/1997ANR
DetailsJoe Tawney
10/21/97 406 - FINAL NOT READY ALARM SYSTEM
INSP-Sprinkler Rough-in/Hydro10/20/199710/20/199710/20/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON HYDRO TESTS FOR TWO WET PIPE SYSTEMS
INSP-Conference10/7/199710/7/199710/7/1997 PASS
DetailsJoe Tawney
/ / 406 - CONF TO DISCUSS LOCATION OF FIRE EXT
INSP-Supply line flush9/16/19979/17/19979/17/1997APART
DetailsJoe Tawney
09/17/97 406 - SPKLR ROUGH IN OK ON SPKLR ROUGH IN AND OK TO COVER
INSP - Wall cover9/16/19979/17/19979/17/1997APASS
Details
09/17/97 338 - CEILING GRID made ok to drop in tiles with the ele insp approval
INSP - Carpentry8/27/19978/28/19978/28/1997APASS
Details
08/28/97 338 - Scheduled by Hello! on 08/27/97 at 16:52:22. CONFERENCE O USING ARMSTRONG INTERMEDIATE LOOKING GOOD ALL IS ON SCHEDULU
INSP-Supply line flush8/28/19978/28/19978/28/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Framing/Rough-in8/26/19978/27/19978/28/1997ACANC
Details
08/28/97 338 - cancelledwill recall
INSP-Supply line flush8/25/19978/26/19978/26/1997ANR
DetailsJoe Tawney
08/26/97 406 - NOT READY FOR UNDERGROUND FLUSH
INSP - Framing/Rough-in8/15/19978/15/19978/15/1997 PASS
Details
08/15/97 338 - FRAM-OK FRAMING
INSP - Framing/Rough-in8/12/19978/13/19978/13/1997APASS
Details
08/13/97 338 - made ok to insulate
INSP - Framing/Rough-in8/8/19978/11/19978/11/1997PPASS
Details
08/11/97 336 - made ok for the furred walls at the perimeter as there is
INSP - Roof8/8/19978/11/19978/11/1997APART
Details
08/11/97 336 - made ok
INSP - Framing/Rough-in8/7/19978/8/19978/8/1997ANR
Details
08/07/97 338 - not ready conference only with drywall for and pro manage
INSP - Conference8/8/19978/8/19978/8/1997 PASS
Details
/ / 338 - with drywall super Keith and stan the project manager
INSP - Foundation7/31/19978/1/19977/31/1997PPASS
Details
08/01/97 338 - CONCRETE RE-BAR MASN-REBAR OK
INSP - Masonry7/25/19977/29/19977/28/1997APASS
Details
07/29/97 338 - REBARmade ok with sp insp approval
INSP - Footings7/25/19977/29/19977/28/1997APASS
Details
07/29/97 338 - REBAR FOR FOOTING made ok with sp insp app
INSP - Masonry7/25/19977/28/19977/28/1997APASS
Details
07/28/97 338 - made ok with the sp insp approval
INSP - Masonry7/11/19977/18/19977/18/1997APART
DetailsTom Arcoraci
spec inspect on site report pending
INSP - Masonry7/11/19977/17/19977/17/1997APASS
Details
/ / 338 - made ok with sp insp approval
INSP - Masonry7/11/19977/16/19977/16/1997APASS
Details
07/16/97 338 - made ok with sp insp approval
INSP - Masonry7/11/19977/15/19977/15/1997APASS
Details
07/15/97 338 - MASN-REBAR OK
INSP - Masonry7/11/19977/14/19977/14/1997APASS
Details
07/14/97 338 - GROUT MASN-REBAR OK
INSP - Masonry7/7/19977/11/19977/11/1997APART
DetailsTom Arcoraci
INSP - Masonry7/7/19977/10/19977/10/1997APASS
Details
07/10/97 338 - made ok with sp insp approval MASN-REBAR OK
INSP - Masonry7/7/19977/9/19977/9/1997APASS
Details
07/10/97 338 - MADE OK WITH SP INSP APPROVAL MASN-REBAR OK
INSP - Footings7/7/19977/9/19977/9/1997APASS
Details
07/10/97 338 - OTHER AGENCIES AIGNED OFF ON THE SLAB MADE OK
INSP - Masonry7/7/19977/8/19977/8/1997APASS
Details
07/08/97 338 - made okwith sp insp ok
INSP - Masonry6/30/19977/3/19977/3/1997APASS
Details
07/03/97 338 - concrete and a.m. and p.m. masonry inspection made ok wit approvals
INSP - Masonry6/30/19977/3/19977/3/1997PPASS
Details
07/03/97 338 - made ok
INSP - Conference7/3/19977/3/19977/3/1997 PASS
Details
/ / 338 - conf on cleanup of the streets
INSP - Masonry6/30/19977/2/19977/2/1997PPASS
Details
07/02/97 338 - made ok with sp insp ok
INSP - Masonry6/30/19977/2/19977/2/1997APASS
Details
07/02/97 338 - concrete and a.m. and p.m. masonry inspection made ok wit
INSP - Masonry6/30/19977/1/19977/1/1997APASS
Details
07/01/97 338 - concrete and a.m. and p.m masonry inspection made ok with
INSP - Masonry6/30/19977/1/19977/1/1997PPASS
Details
07/01/97 338 - made ok with sp insp approval
INSP - Masonry6/24/19976/26/19976/26/1997PPASS
Details
06/26/97 338 - made ok with sp insp approvalCEMENT, ETC. SPECIAL INSPEC
INSP - Masonry6/24/19976/25/19976/25/1997APASS
Details
/ / 338 - POURING MASONRY GROUT REBAR & SLAB 9 A.M. SPECIAL INSPECTOR ON BOARD. MASN-REB
INSP - Masonry6/24/19976/24/19976/24/1997PPASS
Details
06/24/97 338 - 1 o'clock special inspection on site, re-bar made ok with
INSP - Masonry6/20/19976/23/19976/23/1997APASS
Details
06/23/97 338 - made ok with sp insp approval
INSP - Masonry6/19/19976/20/19976/20/1997APART
DetailsTom Arcoraci
MASONRY REBAR...part, pend spec insp
INSP - Masonry6/18/19976/19/19976/19/1997APASS
Details
06/19/97 338 - made ok with sp insp approval the r-bar is placed at this
INSP - Masonry6/17/19976/17/19976/17/1997PPASS
Details
06/17/97 338 - MASONARY GROUT AND CONCRETE REINFORCEMENT. ..LATE P.M.MAD APPROVAL POURING COMPLETED AT MY ARRIVAL
(F) Reprint permit  6/13/1997
Print Occupancy Form  6/13/1997
Inspection Record Card- Bld  6/13/1997
(F) Reprint permit  6/13/1997
INSP - Footings6/11/19976/12/19976/12/1997PPASS
Details
06/12/97 338 - LINES B G & 1 made ok r-bar placed
INSP - Masonry6/11/19976/12/19976/12/1997PPASS
Details
06/12/97 338 - made ok GROUT - GRID LINES B & G
INSP - Masonry6/10/19976/11/19976/12/1997PPASS
Details
06/11/97 338 - made ok for the west wall to slab height
INSP - Footings6/5/19976/5/19976/5/1997PPASS
Details
06/05/97 338 - LATE PM west 1/2 ok with sp insp approvel
(F) Reprint permit  6/5/1997
Issue PAID IN FULL permit  6/4/1997
Telephone call  6/4/1997 PASS
CALLED AND TOLD STAN IT IS READY WILL BE IN TO PICK THIS UP IN TWO OR THREE DAYS
Print Occupancy Form  6/4/1997
Inspection Record Card- Bld  6/4/1997
Plan assigned to (R_H)3/21/1997 6/3/1997 PASS
Details
06/03/97 16:39:53 R_H - this action updated by action script from <<>> in Case No. BLD97-0438
Print Pending Permit.LaserJet4  6/3/1997 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/3/1997 PASS
All resubmitals received and reviewed /ready to issue.
Routing Off Site - STRUCTURAL5/27/1997 5/29/1997 PEND
TO ATWOOD, HINZMAN, JONES 5/27/97 PACKAGE #1 Recieved plans back from engineer he does not have to see them again. I am waiting for the details from job engineer to be added to approved set of plans.
90 day tracking............. 2/27/19975/28/1997 PEND
Plan Reviewer's activity  5/27/1997 PEND
Received resubmittals for engineering/Routed plans to David Haugland for review.
Routing - PLANNING5/13/1997 5/16/1997 PASS
PACKAGE #2 X-REF: DR-27-96 & CU-97-95/MOD. APPROVED BY MGS & BB.
Routing Off Site - STRUCTURAL5/8/1997 5/14/1997 FAIL
PACKAGE #1 SEE A216 04-07-97
Routing - PLAN CHECK4/16/1997 5/13/1997
PACKAGE #2
Routing Off Site - A.C.H.D3/10/1997 5/13/1997 PASS
PACKAGE #4 CONTACTED ROGER ROZELLE AT ###-#### SENT VIA PDQ TWO SETS OF STAMPED AND SIGNED CIVIL AND LANDSCAPE PLANS. FEES PAID RECEIPT #97-1187
Plan Reviewer's activity  5/13/1997 FAIL
Received structural review back failing. Engineer reviewer requested more information. Faxed request to (Roger Rozelle) applicant.
Plan Reviewer's activity  5/8/1997 PEND
Routed plans (office copy) back to Engineering for there review of their corricton list.
Plan Reviewer's activity  4/22/1997 HOLD
Sent letter to architect (Roger Rozelle) informing him that no further review will be performed on plan resubmitals until the issue with P&Z is taken care of.
Routing - PLANNING4/8/1997 4/16/1997 FAIL
PACKAGE #2 X-ref: CU-97-95 & DR-27-96. As result of denial of floor space increase request under CU-97-95/mod the plans will need to be revised to eliminate one store. Revised plans are required showing deletions and, landscape plans. Landscape plans must in clude area where building will be deleted will be grassed and landscaped. Reviewed by BB.
Routing - PLAN CHECK4/7/1997 4/8/1997
PACKAGE #1 RON HILL IS SENDING PACKAGE #1 OFFICE COPY OUT TO ATWOOD, HINZMAN & JONES BECAUSE HE PUT RESUBMITTALS INTO PACKAGE #1 AND THEY NEED STRUCTURAL REVIEW. A MEMO WAS SENT WITH THE PLANS EXPLAINING THE IMPORTANCE OF RECEIVEING THESE PLANS BACK WHEN THEY ARE DONE WITH THEM. CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD. KMM 5-8-97
Routing - PUBLIC WORKS3/27/1997 4/8/1997 PASS
PACKAGE #2 I SPOKE WITH BRIAN MURPHY ABOUT CIVIL SHEETS. HE WILL CALL AND ORDER ME 4 SETS STAMPED AND SIGNED. 3-18-97 KMM RECEIVED STAMPED AND SIGNED CIVIL SHEETS 3-27-97 READY TO ROUTE TO PW.
Routing - FIRE3/28/1997 4/7/1997 PASS
PACKAGE #1
Routing - PLAN CHECK3/12/1997 3/28/1997
PACKAGE #1
Plan resubmittals requested  3/27/1997 FAIL
Received engineers plan review corrections list. Mailed my plan review and engineers plan reveiw requirements to applicant.
Routing Off Site - STRUCTURAL3/10/1997 3/26/1997
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN, AND JONES
Plan Reviewer's activity  3/21/1997 PEND
Received plans began review.
Plan assigned to (RGG)3/3/1997 3/21/1997
Routing - ELECTRICAL3/7/1997 3/12/1997 PASS
PACKAGE #1 3
Routing - PLUMBING3/6/1997 3/7/1997 PASS
PACKAGE #1
Routing - MECHANICAL3/3/1997 3/3/1997 PASS
PACKAGE #1 NO REVIEW FIELD VERIFY
Plan routing begun/NEW & ADDTN  3/3/1997
SEE ACTION 007
Plans ACCEPTED BY PLAN CHECK  3/3/1997 PASS
PACKAGE #1 NEED 2 SETS OF CIVIL SHEETS. WILL WAIT FOR RESUBMITTALLS ON THEIR GRADING PERMIT FOR BLD97-0255 PACKAGE #2 NEED 2 SETS OF A2.1 & A3.1 THEY WERE NOT STAMPED OR SIGNED NEED 2 SETS OF CIVIL SHEETS, SAME AS FOR PACKAGE #1 NEED DRAINAGE CALCS. PACKGE #3 NEED 3 SETS OF STAMPED AND SIGNED PLANS NEED 3 SETS OF STRUCTURAL CALCS PACKAGE #4 NEED 2 SETS OF STAMPED AND SIGNED CIVIL SHEETS ALL CIVIL SHEETS ARE TO BE RESUBMITTED WITHOUT FOR REFERENCE ONLY AND ARE TO BE STAMPED AND SIGNED. 03-06-97 RECEIVED 2 STAMPED AND SIGNED FLOOR PLANS AND EXTERIOR ELEV. FOR PKG. #2. RECEIVED 2 SETS OF PKG. #3 ARCH. AND STRUC. SHEETS RECEIVED 2 ADDITIONAL SIGNED COPIES STRUCT. CALCS. KMM STARTED ROUTING PACKAGE #1 3-10-97 RECEIVED FOR PACKAGE #4 2 STAMPED AND SIGNED TITLE SHEETS. WILL ROUTE TO ACHD. ALSO RECEIVED 3RD SET FOR PACKAGE #3 HOWERVER THE STRUCTURAL SHEETS ARE MISSING. CONT.ROGER ROZELLE TO LET HIM KNOW OF THIS NEED. 3-11-97 received 3rd. set of structural sheets. Package #3 is now ready for routing Atwood, Hinzman, and Jones. 3-27-97 RECEIVED 4 SETS OF CIVIL AND LANDSCAPE PLANS. ALL STAMPED AND SIGNED. PUT TWO WITH PAKCAGE #2 AND SENT TO PW. SENT TWO SETS WITH PACKAGE #4 AND NOTIFIED MARCUS GREEN THAT I WAS SENDING THEM TO HIM VIA PDQ.
Application received  2/27/1997
Received Certificate of Value  2/27/1997 PASS
Recd Pcfee & Taken To Pln CK  2/27/1997 PEND
Routing - PLANNING5/15/1997  
Routed both sets of plans (Office Copy and the approved set with the new resubmittals) back to Robert Brown
Routing - PLAN CHECK5/20/1997  
PACKAGE #2
Routing - PLAN CHECK3/27/1997  
PACKAGE #3
Routing - PLAN CHECK5/30/1997  
package #1
Routing - PLAN CHECK5/30/1997  
package #3
Routing - PLAN CHECK5/13/1997  
PACKAGE #4