Permit NumberBLD97-00494
StatusFinaled
Name HEWLETT PACKARD (BLDG #6)
Site Address 11311 CHINDEN BLVD
Project NameHP #6 - CHILLER ENCLS
Customer Number 
ePlanReviewNo
Description
To construct a 4,680 sq.ft. chiller enclosure which will include a pump room that will house mechanical and electrical equipment per approved plans on file. To demolish chiller units & associated equipment within the basement of building #6. Separate electrical & mechanical permits required. Per approved plans. APPROVAL BY FIRE DEPARTMENT REQUIRED AS CONDITION OF FINAL INSPECTION AND LETTER OF COMPLETION. PC#110-97/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final1/7/19991/7/19991/7/1999PPASS
DetailsCarl Dependahl
change status to "D"...insp notes show final ok.
Office final  1/7/1999 PASS
CHANGE STATUS TO "D"...NOTES SHOW ALL INSP'S DONE, CARD SIGNED,ETC. CARL D.
INSP - Footings6/17/19976/18/19966/18/1998PCANC
DetailsCarl Dependahl
FOOTING REBAR
INSP - Final2/20/19982/19/19982/19/1998PPASS
DetailsCarl Dependahl
CONF W/ CATHY RE L/C ONLY
Code Occupancy Approval  2/13/1998 PASS
Final Insp. made - Final signed
INSP - Final2/9/19982/11/19982/11/1998PPART
DetailsCarl Dependahl
EARLY PM 2:30 CALL ED HESS ###-#### OR ###-####1 STRUCT OK; CARD TO ED HESS
INSP - Final2/6/19982/9/19982/9/1998ACANC
DetailsCarl Dependahl
CALL ED ###-#### OR ###-#### TO MEET YOU--BLDG 6 resched per ed
INSP - Conference2/6/19982/6/19982/6/1998APASS
DetailsCarl Dependahl
re final insps, told to call office.
INSP - Carpentry2/4/19982/4/19982/4/1998PPART
DetailsCarl Dependahl
OK PER JOE
INSP - Conference2/3/19982/3/19982/3/1998APASS
DetailsCarl Dependahl
W/ ERNIE HARPER RE FINAL INSP & TAWNEYS C/N...TOLD TO RECALL WHEN ALL SIGNATURES VERIFIED
INSP - Final2/3/19982/3/19982/3/1998PNR
DetailsCarl Dependahl
BLDG 6--ERNIE SAID HE TALKED TO YOU ABOUT THIS--###-#### OR ###-####--PLEASE CALL HIM FIRST
INSP - Final2/3/19982/3/19982/3/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR CERT OF COMPL
INSP - Conference10/29/199710/29/199710/29/1997PPASS
DetailsCarl Dependahl
W/ MTI RE NON CONFORMING REPORTS
INSP - Conference10/28/199710/28/199710/28/1997PPASS
DetailsCarl Dependahl
W/ SLY; HE REC'D FINAL SPEC. INSP REPORT...WILL FORWARD TO ME.
INSP - Conference10/14/199710/14/199710/14/1997PPASS
DetailsCarl Dependahl
W/ JOE TAWNEY RE FINAL FOR CHILLER....NEED I.D. LABELS ON PRESS. & VALVES FOR CHILLER. PROPERLY SUPPORT VALVES.
INSP - Final10/8/199710/10/199710/10/1997PNR
DetailsCarl Dependahl
HP 6, CHILLER...need fire ok
INSP - Framing/Rough-in10/13/199710/10/199710/10/1997PPASS
DetailsCarl Dependahl
INSP - Carpentry10/9/199710/9/199710/9/1997PPART
DetailsCarl Dependahl
HP 6 CHILLER BLDG
INSP - Final10/8/199710/9/199710/9/1997PFAIL
DetailsJoe Tawney
10/09/97 406 - HP 6, CHILLER BLDG; JULIO OF K2 WILL CONTACT YOU FINAL FAIL FIRE EXT SUPPORT OF STOP VLVS LABELING OF VLVS
INSP - Conference9/26/19979/26/19979/26/1997PPASS
DetailsCarl Dependahl
09/26/97 340 - CON JULIO
INSP - Carpentry9/22/19979/22/19979/22/1997PPART
DetailsCarl Dependahl
09/22/97 340 - INK JET PROJ. CHILLER.
INSP - Carpentry9/18/19979/19/19979/19/1997PPART
DetailsCarl Dependahl
09/19/97 340 - W/JULIO, K2
INSP - Conference9/18/19979/18/19979/18/1997 PASS
DetailsCarl Dependahl
/ / 340 - W/ JULIO RE CHILLER PROJECT.
INSP - Carpentry7/29/19977/29/19977/29/1997 PART
DetailsCarl Dependahl
07/29/97 340 - BLDG 6 CHILLERPENDING SPEC INSP REPORTS
INSP - Masonry7/18/19977/21/19977/21/1997ACANC
DetailsJim Sly
07/18/97 316 - Gave To Carl D.
INSP - Masonry7/18/19977/18/19977/18/1997PPART
DetailsCarl Dependahl
07/18/97 340 - SENT TO SLY IN ERROR, ADDED BY 340 ..SPEC INSP REPORT PEN
INSP - Masonry7/14/19977/18/19977/18/1997PCANC
DetailsJim Sly
07/17/97 316 - Gave to Carl D.
INSP - Masonry7/14/19977/16/19977/16/1997PCANC
DetailsJim Sly
07/16/97 316 - Gave to Carl D.
INSP - Conference7/16/19977/16/19977/16/1997PPASS
DetailsCarl Dependahl
W/ JULIO OF K2 RE SPEC INSP REPORTS
INSP - Masonry7/10/19977/14/19977/14/1997APART
DetailsCarl Dependahl
07/14/97 340 - looks ok, pending spec insp report
INSP - Masonry7/9/19977/9/19977/9/1997PPART
DetailsCarl Dependahl
07/09/97 340 - ###-#### digital pager Julio HP; PENDING SPEC INSP, MET W
INSP - Conference7/8/19977/8/19977/8/1997 PASS
DetailsCarl Dependahl
/ / 340 - bldg 6 chiller w/ K-2, Julio
INSP - Framing/Rough-in7/1/19977/2/19977/2/1997PPART
DetailsCarl Dependahl
07/02/97 340 - RE-BAR BLD 6 SLAB; PEND SPEC INSP REPORT
INSP - Footings7/1/19977/1/19977/1/1997PPART
DetailsCarl Dependahl
07/01/97 340 - RE-BAR CHILLER. BLD 6 SOUTH SIDE; PART, PENDING SPEC INSP
INSP - Footings6/25/19976/26/19976/26/1997PCANC
DetailsTom Arcoraci
WALL
INSP - Foundation6/24/19976/25/19976/25/1997PPART
DetailsCarl Dependahl
06/25/97 340 - pend spec insp report
INSP - Footings6/24/19976/25/19976/25/1997PPART
DetailsCarl Dependahl
06/25/97 340 - REBAR SOUTH SIDE OF BLDG 6
INSP - Foundation6/24/19976/24/19976/24/1997APART
DetailsCarl Dependahl
CHILLER FND; PENDING SPEC INSP REPORT
INSP - Foundation6/18/19976/20/19976/20/1997APART
DetailsCarl Dependahl
06/20/97 340 - FND.WALL EARLY A.M.... pend spec insp
INSP - Foundation6/19/19976/20/19976/20/1997APART
DetailsCarl Dependahl
06/20/97 340 - pend spec insp
INSP - Conference6/19/19976/19/19976/19/1997APASS
DetailsCarl Dependahl
W/ JULIO OF K-2; RE SPEC INSP.REQ'S...I'D BEEN AT SITE 6-17 & MISSED HIM...WORK APPEARED OK
INSP - Foundation6/17/19976/17/19976/17/1997PPART
DetailsCarl Dependahl
06/17/97 340 - FND. WALL REBAR; PENDING SPEC INSP, LOOKS OK
INSP - Foundation6/17/19976/17/19976/17/1997PPART
DetailsCarl Dependahl
06/17/97 340 - FND WALL REBAR ...FTG NO. & WEST; PENDING SPEC INSP REPOR
INSP - Foundation6/17/19976/18/19966/17/1997P
DetailsJim Sly
FND. REBAR
INSP - Footings6/16/19976/16/19976/16/1997PCANC
DetailsJim Sly
06/16/97 316 - Gave to Carl D...
Telephone call  6/10/1997
TALKED TO ED HESS/ PERMIT READY, FEE DUE
Issue PAID IN FULL permit  6/10/1997
Print Occupancy Form  6/10/1997
Routing - PLAN CHECK6/9/1997 6/10/1997 PASS
Inspection Record Card- Bld  6/10/1997
PLANS/APPL TAKEN TO FRONT DESK  6/10/1997 PASS
Plan assigned to (DRS)3/5/1997 6/10/1997 PASS
DetailsDan Stuart
06/10/97 08:33:18 DRS - this action updated by action script from <<>> in Case No. BLD97-0494
Routing - FIRE6/3/1997 6/9/1997 PASS
Plan resubmittals received  6/9/1997
Architect & Structural Engineer came over and stamped the previously submitted sheet for exit stair design.
90 day tracking............. 3/5/19976/3/1997 PEND
Routing - PLANNING5/28/1997 6/2/1997 PASS
Approved by: TKW
Routing - PUBLIC WORKS5/21/1997 5/28/1997 PASS
Plan resubmittals received  5/27/1997
Received written response from architect that he has reviewed the plan review requirements & will comply and provide direction to contractor. Also stipulated the special inspection agency and requirements.
Telephone call  5/21/1997
Have received calls from Ed Hess one or more times a week since middle of April to check on progress of plans and permit status. He requests that I call him at any change of status. This generally is a message left on his machine.
Print Pending Permit.LaserJet4  5/21/1997 PEND
Routing to Fire, PW & Zoning for review & approval.
Plan resubmittals requested  5/21/1997 PEND
Finished preliminary review. Faxed and mailed comments to John Maulin, CSHQA for response. Routing to Fire , PW & PZ for review and approval.
Routing Off Site - STRUCTURAL5/14/1997 5/20/1997 PASS
Resubmittal from John Maulin, CSHQA, in response to structural review of 5/8/97, routed back to Atwood- Hinzman-Jones for review and approval. Revieved plans back with note that response & resubmittals are approved on 5/20/97.
Routing - PLAN CHECK5/15/1997 5/20/1997 PEND
Routed resubmittal for structural review back to Atwood, Hinsman & Jones. Called Scott to let him know they were coming and to ask for return of second set of plans. Plans have not been signed off buy P&Z nor routed to PW. Sent preliminary review comments to architect for response. Checked with Dave Miller, Fire Dept Plan Reviewer to see if he wanted to see the plans - he did. Routing to P&Z, PW & Fire Dept.
Routing - PLAN CHECK5/8/1997 5/15/1997
Received resubmittals from CSHQA for structural engineering comments. Routing back to engineer for review.
Plan resubmittals received  5/12/1997
Received response to structural review, new sheet A-1, engineers calc/design sheet and the engineer's stamp on calcs & plan. Routing to structural engineer for re-review.
Telephone call  5/12/1997
Call to John Maulin concerning progress on response to structural review comments. Said plans were at HP and they were working on submittals then plans will come back to CSHQA Engineer, Michael Brown, for review and comment then back to city. Thought we should have plans back on the 13th.
Plan resubmittals requested  5/8/1997
Received plan & comment back from Attwood- Hinzman- Jones with comments needing response. Faxed copy to John Maulin for response.
Routing Off Site - STRUCTURAL4/21/1997 5/8/1997 FAIL
SENT 2 SETS OF PLANS TO ATWOOD, HINZMAN, JONES FOR STRUCTURAL REVIEW. DAR 5/8/97 - reveived comments from structural plan reviewer with items needing addressed by CSHQA. Faxed copy to John Maulin for response.
Routing - PLAN CHECK3/13/1997 4/10/1997
REQUIRES DESIGN REVIEW BY PLANNING AND ZONING. 5/31/97 - DR-50-97 Conditions of Approval issued to Ed Hess, HP Chiller Project. Appeal period end at 5:00 p.m. on April 10 1997.
Routing - PLANNING3/6/1997 3/12/1997 FAIL
Requires Design Review approval. Contacted John Maulin Architect. Reviewed by MGH.
Plan routing begun/TENANTS  3/6/1997
Route to PLANNING, to STRUCTURAL ENGINEER, to PUBLIC WORKS then back to PLAN CHECK. Provide a copy of plan review and permit to Fire Department.
Application received  3/5/1997
Recd Pcfee & Taken To Pln CK  3/5/1997