INSP - Final | 11/12/1998 | 11/12/1998 | 11/12/1998 | | PASS |
|
|
|
/ / 338 - SIGNED THE PERM COL OF THE OCC REQ CARD
|
INSP - Final | 11/12/1998 | 11/12/1998 | 11/12/1998 | | PASS |
|
|
|
/ / 338 - SIGNED THE PERM COL OF THE OCC REQ CARD
|
Permanent Occupancy | | 8/28/1997 | 8/28/1997 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/28/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #6958 issued 8-28-97 to Stapley Engineering.
|
INSP - Final | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PART |
|
|
|
08/21/97 338 - signed the occ req card in the temp col
|
INSP - Final | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
|
|
|
/ / 338 - made oksigned the temp col need ele signoff in the final coe
|
INSP - Final | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
|
|
|
/ / 338 - made oksigned the temp col need ele signoff in the final coe
|
INSP - Final | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PART |
|
|
|
08/21/97 338 - signed the occ req card in the temp col
|
INSP-Final Inspection | 8/20/1997 | 8/21/1997 | 8/21/1997 | A | PASS |
Joe Tawney
|
|
|
08/20/97 406 - FINAL OK FOR PERM OCC
|
Temporary occupancy | | | 8/21/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3454 issued 8-21-97 to Stapley Engineering.
|
INSP - Final | 8/20/1997 | 8/20/1997 | 8/20/1997 | | NR |
|
|
|
/ / 338 - page shane at ###-#### not ready OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Final | 8/20/1997 | 8/20/1997 | 8/20/1997 | | CANC |
|
|
|
08/20/97 338 - PAGE SHANE DIG. PAGER ###-#### SO HE CAN MEET YOU
|
INSP - Final | 8/20/1997 | 8/20/1997 | 8/20/1997 | | CANC |
|
|
|
/ / 338 - PAGE SHANE DIG. PAGER ###-#### SO HE CAN MEET YOU
|
Routing for occupancy | 8/19/1997 | 8/19/1997 | 8/19/1997 | | PASS |
|
|
|
Scott Brown inspected - complies w/DR-05-97
|
INSP - Ceiling grid | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | PASS |
|
|
|
08/08/97 338 - ceiling tile
|
INSP-Conference | 8/6/1997 | 8/7/1997 | 8/7/1997 | A | PASS |
Joe Tawney
|
|
|
08/06/97 406 - PRE FINAL CONF WENT OVER PLAN REVIEW LIST
|
INSP - Conference | 7/24/1997 | 7/24/1997 | 7/24/1997 | | PART |
|
|
|
/ / 338 - with the super for the lower elevation soffit details he wil the jobsite shortly and the ner-200 is now on site
|
INSP - Framing/Rough-in | 7/23/1997 | 7/23/1997 | 7/22/1997 | P | NR |
|
|
|
07/23/97 338 - CANCELLED BY SUPER TILL 07/24/97
|
INSP - Conference | 7/22/1997 | 7/22/1997 | 7/22/1997 | | PASS |
|
|
|
/ / 338 - CONTRACTOR/SHANE CALLED WANTS TO MEET FIRST THIN IN THE A.M. DETAILS FOR RESUB AT THAT TIME
|
INSP - Framing/Rough-in | 7/22/1997 | 7/22/1997 | 7/22/1997 | | PART |
|
|
|
/ / 338 - made ok accepted eng and floor ceiling assy from builder and
|
INSP - Framing/Rough-in | 7/15/1997 | 7/16/1997 | 7/16/1997 | A | PART |
|
|
|
07/16/97 338 - CEL PHONE ###-####
|
INSP - Framing/Rough-in | 7/11/1997 | 7/11/1997 | 7/11/1997 | P | PART |
Wes Worcester
|
|
|
walls ok to cover
|
INSP - Framing/Rough-in | 7/10/1997 | 7/11/1997 | 7/11/1997 | P | CANC |
Jim Sly
|
|
|
07/11/97 316 - Gave to Wes W.
|
INSP - Framing/Rough-in | 6/30/1997 | 6/30/1997 | 7/1/1997 | P | PASS |
|
|
|
06/30/97 338 - trusses ok ok to cover ceiling/trusses behind ele insp ok
|
INSP - Framing/Rough-in | 6/27/1997 | 6/30/1997 | 6/30/1997 | A | CANC |
Jim Sly
|
|
|
06/27/97 316 - Cancel...Gave to Perry
|
90 day tracking............. | | 3/17/1997 | 6/15/1997 | | |
|
|
|
|
INSP - Miscellaneous | 6/9/1997 | 6/9/1997 | 6/9/1997 | | PASS |
|
|
|
/ / 338 - reviewed resubmittals 50 min
|
INSP - Footings | 5/22/1997 | 5/22/1997 | 5/22/1997 | P | PASS |
Jim Sly
|
|
|
05/22/97 316 - OK to pour stem walls (South) and small section Mid North
|
INSP - Footings | 5/20/1997 | 5/21/1997 | 5/21/1997 | A | PASS |
Jim Sly
|
|
|
05/20/97 316 - Footings for South and short part of East and West walls.
|
INSP - Footings | 5/16/1997 | 5/19/1997 | 5/19/1997 | A | PASS |
Jim Sly
|
|
|
05/19/97 316 - N. wall east end and E. wall north end...Found walls OK..
|
INSP - Footings | 5/13/1997 | 5/14/1997 | 5/14/1997 | P | PART |
Jim Sly
|
|
|
05/13/97 316 - Inspection of foundation walls...Basement...OK
|
INSP - Footings | 5/9/1997 | 5/9/1997 | 5/9/1997 | P | PART |
Jim Sly
|
|
|
05/09/97 316 - Basement footings and pads only....OK
|
INSP - Footings | 5/6/1997 | 5/6/1997 | 5/6/1997 | P | PASS |
|
|
|
05/06/97 338 - ok with sp insp ok
|
(F) Reprint permit | | | 4/28/1997 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/25/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/1997 | | |
|
|
|
|
Telephone call | | | 4/25/1997 | | CALL |
|
|
|
RENAE WILL LET BILL KNOW
|
Print Occupancy Form | | | 4/25/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 4/10/1997 | | 4/24/1997 | | PASS |
|
|
|
PACKAGE #4 issued
|
Routing - PLAN CHECK | 4/7/1997 | | 4/24/1997 | | PASS |
|
|
|
PACKAGE #3 issued
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/1997 | | PASS |
|
|
|
issue
|
Print Pending Permit.LaserJet4 | | | 4/24/1997 | | PASS |
|
|
|
files
|
Plan Reviewer's activity | | | 4/24/1997 | | PASS |
|
|
|
received "signed" resubs, insert all sheets to plans and issue.
|
Routing - PLAN CHECK | 4/22/1997 | | 4/24/1997 | | PASS |
|
|
|
PACKAGE #2 Issued
|
Routing - PLAN CHECK | 4/23/1997 | | 4/24/1997 | | PASS |
|
|
|
PACKAGE #1 issued
|
Routing - PLAN CHECK | 4/11/1997 | | 4/23/1997 | | PEND |
|
|
|
PACKAGE #1 to fire for final review. issued- 4/24/97
|
Routing - FIRE | 4/22/1997 | | 4/23/1997 | | PASS |
|
|
|
PACKAGE #1 RESUBS TO FLOYD VARLEY.
|
Routing - PLANNING | 4/15/1997 | | 4/21/1997 | | PASS |
|
|
|
PACKAGE #2 X-ref: DR-5-97. Approved by MGS.
|
Routing Off Site - STRUCTURAL | 3/18/1997 | | 4/17/1997 | | PASS |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL STRUCTURAL REVIEW FOR STAPLEY GIVEN TO DICK PIERCE. KMM 4/17/97--RECEIVED RESUBS ADDRESSING THE CORRECTIONS REQUIRED BY CH2MHILL.
|
Plan resubmittals received | | | 4/17/1997 | | PEND |
|
|
|
Recieved corrections on structural, plan check and Fire requirements for review. All pages of BRS not signed by Arch.
|
Routing - PUBLIC WORKS | 4/9/1997 | | 4/15/1997 | | PASS |
|
|
|
PACKAGE #2
|
Routing - FIRE | 4/8/1997 | | 4/11/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Routing Off Site - A.C.H.D | 3/18/1997 | | 4/10/1997 | | PASS |
|
|
|
PACKAGE #4 CONTACTED BRYCE STAPLEY AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES PAID.
|
Routing - PLANNING | 4/1/1997 | | 4/9/1997 | | FAIL |
|
|
|
PACKAGE #2 X-ref: DR-5-97. Plans do not comply with conditions of approval 1a thru 1c. Reviewed by MGS.
|
Plan Reviewer's activity | | | 4/8/1997 | | PEND |
|
|
|
Reviewed plans and attachments, prepare and complete two Plan Analysist inputs to reflect one review for each side of the proposed location of the tenant demising wall. The review still required exiting and corridor protection on one side and may result in the relocation of the wall to equally divide the occupant load, thus eliminating the fire protection, corridor, and exiting requirements per correction notice. Fax correction list and Engineers comments to Arch. Forward to Fire.
|
Plan resubmittals requested | 4/8/1997 | | 4/8/1997 | | |
|
|
|
|
Routing - PLAN CHECK | 3/27/1997 | | 4/8/1997 | | PEND |
|
|
|
PACKAGE #1 To fire for review
|
Plan assigned to (RGG) | 3/18/1997 | | 4/4/1997 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/18/1997 | | 3/30/1997 | | FAIL |
|
|
|
PACKAGE #2 REQUIRES STREET LIGHT PLAN PER BILL COLSON. REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY.
|
Routing - PLUMBING | 3/26/1997 | | 3/27/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - ELECTRICAL | 3/18/1997 | | 3/26/1997 | | PASS |
|
|
|
PACKAGE #1
|
Plan routing begun/NEW & ADDTN | | | 3/18/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 3/17/1997 | | 3/18/1997 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/18/1997 | | PASS |
|
|
|
|
Received Certificate of Value | | | 3/17/1997 | | PASS |
|
|
|
|
Application received | | | 3/17/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/17/1997 | | |
|
|
|
|
Routing - MECHANICAL | | | | | |
|
|
|
PACKAGE #1
|