Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD97-00597
StatusFinaled
Name BRYCE STAPLEY
Site Address 8701 W HACKAMORE DR
Project NameSTAPLEY OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
STAPLEY ENGINEERING OFFICES * TO CONSTRUCT A ONE STORY 6432 SQ. FT. OFFICE BUILDING WITH PARTIAL 1799 SQ.FT. BASEMENT. The building is divided into two areas via a tenant demising wall creating an east portion of 2710sf and a west portion on the main floor of 3722sf for the purpose of isolating the occupant load within the building. This building is NOT Fire Sprinkled. Basement area used for storage and mechanical room. DR#5-97-8201 [PC#130-97] PRP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final11/12/199811/12/199811/12/1998 PASS
Details
/ / 338 - SIGNED THE PERM COL OF THE OCC REQ CARD
INSP - Final11/12/199811/12/199811/12/1998 PASS
Details
/ / 338 - SIGNED THE PERM COL OF THE OCC REQ CARD
Permanent Occupancy 8/28/19978/28/1997 DONE
Details
Permanent occupancy  8/28/1997 PASS
Perm. Occ. Cert. #6958 issued 8-28-97 to Stapley Engineering.
INSP - Final8/21/19978/21/19978/21/1997 PART
Details
08/21/97 338 - signed the occ req card in the temp col
INSP - Final8/21/19978/21/19978/21/1997 PASS
Details
/ / 338 - made oksigned the temp col need ele signoff in the final coe
INSP - Final8/21/19978/21/19978/21/1997 PASS
Details
/ / 338 - made oksigned the temp col need ele signoff in the final coe
INSP - Final8/21/19978/21/19978/21/1997 PART
Details
08/21/97 338 - signed the occ req card in the temp col
INSP-Final Inspection8/20/19978/21/19978/21/1997APASS
DetailsJoe Tawney
08/20/97 406 - FINAL OK FOR PERM OCC
Temporary occupancy  8/21/1997 PASS
Temp. Occ. Cert. #3454 issued 8-21-97 to Stapley Engineering.
INSP - Final8/20/19978/20/19978/20/1997 NR
Details
/ / 338 - page shane at ###-#### not ready OTH-OTHER AGENCIES NOT APPROVED
INSP - Final8/20/19978/20/19978/20/1997 CANC
Details
08/20/97 338 - PAGE SHANE DIG. PAGER ###-#### SO HE CAN MEET YOU
INSP - Final8/20/19978/20/19978/20/1997 CANC
Details
/ / 338 - PAGE SHANE DIG. PAGER ###-#### SO HE CAN MEET YOU
Routing for occupancy8/19/19978/19/19978/19/1997 PASS
Scott Brown inspected - complies w/DR-05-97
INSP - Ceiling grid8/8/19978/8/19978/8/1997PPASS
Details
08/08/97 338 - ceiling tile
INSP-Conference8/6/19978/7/19978/7/1997APASS
DetailsJoe Tawney
08/06/97 406 - PRE FINAL CONF WENT OVER PLAN REVIEW LIST
INSP - Conference7/24/19977/24/19977/24/1997 PART
Details
/ / 338 - with the super for the lower elevation soffit details he wil the jobsite shortly and the ner-200 is now on site
INSP - Framing/Rough-in7/23/19977/23/19977/22/1997PNR
Details
07/23/97 338 - CANCELLED BY SUPER TILL 07/24/97
INSP - Conference7/22/19977/22/19977/22/1997 PASS
Details
/ / 338 - CONTRACTOR/SHANE CALLED WANTS TO MEET FIRST THIN IN THE A.M. DETAILS FOR RESUB AT THAT TIME
INSP - Framing/Rough-in7/22/19977/22/19977/22/1997 PART
Details
/ / 338 - made ok accepted eng and floor ceiling assy from builder and
INSP - Framing/Rough-in7/15/19977/16/19977/16/1997APART
Details
07/16/97 338 - CEL PHONE ###-####
INSP - Framing/Rough-in7/11/19977/11/19977/11/1997PPART
DetailsWes Worcester
walls ok to cover
INSP - Framing/Rough-in7/10/19977/11/19977/11/1997PCANC
DetailsJim Sly
07/11/97 316 - Gave to Wes W.
INSP - Framing/Rough-in6/30/19976/30/19977/1/1997PPASS
Details
06/30/97 338 - trusses ok ok to cover ceiling/trusses behind ele insp ok
INSP - Framing/Rough-in6/27/19976/30/19976/30/1997ACANC
DetailsJim Sly
06/27/97 316 - Cancel...Gave to Perry
90 day tracking............. 3/17/19976/15/1997
INSP - Miscellaneous6/9/19976/9/19976/9/1997 PASS
Details
/ / 338 - reviewed resubmittals 50 min
INSP - Footings5/22/19975/22/19975/22/1997PPASS
DetailsJim Sly
05/22/97 316 - OK to pour stem walls (South) and small section Mid North
INSP - Footings5/20/19975/21/19975/21/1997APASS
DetailsJim Sly
05/20/97 316 - Footings for South and short part of East and West walls.
INSP - Footings5/16/19975/19/19975/19/1997APASS
DetailsJim Sly
05/19/97 316 - N. wall east end and E. wall north end...Found walls OK..
INSP - Footings5/13/19975/14/19975/14/1997PPART
DetailsJim Sly
05/13/97 316 - Inspection of foundation walls...Basement...OK
INSP - Footings5/9/19975/9/19975/9/1997PPART
DetailsJim Sly
05/09/97 316 - Basement footings and pads only....OK
INSP - Footings5/6/19975/6/19975/6/1997PPASS
Details
05/06/97 338 - ok with sp insp ok
(F) Reprint permit  4/28/1997
Inspection Record Card- Bld  4/25/1997
Issue PAID IN FULL permit  4/25/1997
Telephone call  4/25/1997 CALL
RENAE WILL LET BILL KNOW
Print Occupancy Form  4/25/1997
Routing - PLAN CHECK4/10/1997 4/24/1997 PASS
PACKAGE #4 issued
Routing - PLAN CHECK4/7/1997 4/24/1997 PASS
PACKAGE #3 issued
PLANS/APPL TAKEN TO FRONT DESK  4/24/1997 PASS
issue
Print Pending Permit.LaserJet4  4/24/1997 PASS
files
Plan Reviewer's activity  4/24/1997 PASS
received "signed" resubs, insert all sheets to plans and issue.
Routing - PLAN CHECK4/22/1997 4/24/1997 PASS
PACKAGE #2 Issued
Routing - PLAN CHECK4/23/1997 4/24/1997 PASS
PACKAGE #1 issued
Routing - PLAN CHECK4/11/1997 4/23/1997 PEND
PACKAGE #1 to fire for final review. issued- 4/24/97
Routing - FIRE4/22/1997 4/23/1997 PASS
PACKAGE #1 RESUBS TO FLOYD VARLEY.
Routing - PLANNING4/15/1997 4/21/1997 PASS
PACKAGE #2 X-ref: DR-5-97. Approved by MGS.
Routing Off Site - STRUCTURAL3/18/1997 4/17/1997 PASS
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL STRUCTURAL REVIEW FOR STAPLEY GIVEN TO DICK PIERCE. KMM 4/17/97--RECEIVED RESUBS ADDRESSING THE CORRECTIONS REQUIRED BY CH2MHILL.
Plan resubmittals received  4/17/1997 PEND
Recieved corrections on structural, plan check and Fire requirements for review. All pages of BRS not signed by Arch.
Routing - PUBLIC WORKS4/9/1997 4/15/1997 PASS
PACKAGE #2
Routing - FIRE4/8/1997 4/11/1997 FAIL
PACKAGE #1
Routing Off Site - A.C.H.D3/18/1997 4/10/1997 PASS
PACKAGE #4 CONTACTED BRYCE STAPLEY AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES PAID.
Routing - PLANNING4/1/1997 4/9/1997 FAIL
PACKAGE #2 X-ref: DR-5-97. Plans do not comply with conditions of approval 1a thru 1c. Reviewed by MGS.
Plan Reviewer's activity  4/8/1997 PEND
Reviewed plans and attachments, prepare and complete two Plan Analysist inputs to reflect one review for each side of the proposed location of the tenant demising wall. The review still required exiting and corridor protection on one side and may result in the relocation of the wall to equally divide the occupant load, thus eliminating the fire protection, corridor, and exiting requirements per correction notice. Fax correction list and Engineers comments to Arch. Forward to Fire.
Plan resubmittals requested4/8/1997 4/8/1997
Routing - PLAN CHECK3/27/1997 4/8/1997 PEND
PACKAGE #1 To fire for review
Plan assigned to (RGG)3/18/1997 4/4/1997
Routing - PUBLIC WORKS3/18/1997 3/30/1997 FAIL
PACKAGE #2 REQUIRES STREET LIGHT PLAN PER BILL COLSON. REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY.
Routing - PLUMBING3/26/1997 3/27/1997 PASS
PACKAGE #1
Routing - ELECTRICAL3/18/1997 3/26/1997 PASS
PACKAGE #1
Plan routing begun/NEW & ADDTN  3/18/1997 PASS
Plan assigned to (MYS)3/17/1997 3/18/1997
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  3/18/1997 PASS
Received Certificate of Value  3/17/1997 PASS
Application received  3/17/1997
Recd Pcfee & Taken To Pln CK  3/17/1997
Routing - MECHANICAL   
PACKAGE #1