Permit Information
Permit NumberBLD97-00598
StatusExpired
Name TERRY SCOFIELD
Site Address 2505 S FEDERAL WAY
Project NameEA L.L.C. BUSINESS
Customer Number 
ePlanReviewNo
Description
EA L.L.C. BUSINESS PARK * TO CONSTRUCT A NEW SINGLE STORY, CMU EXTERIOR WALL, TYPE V NONRATED, 9,120 SQ. FT. MULTI-TENANT COMMERICAL/ OFFICE AND FABRICATION BUILDING. THE FIRST TWO UNITS WILL BE OCCUPIED BY A COMPUTER ASSEMBLY BUSINESS. THE REMAINING UNITS ARE UNOCCUPIED AT THE PRESENT TIME. THE ENTIRE BUILDING HAS A CLASS "B" ROOF AND A ONE-HOUR FIRE RESISTIVE ROOF/CEILING ASSEMBLY PER 709.4, EXCPT. 5. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI STANDARDS AND THE 1994 EDITION OF THE UBC. THIS PERMIT INCLUDES THE PARKING LOT AND RELATED SITE WORK. SEPARATE PERMITS AND CERTIFICATE OF OCCUPANCIES ARE REQUIRED FOR EACH FUTURE TENANT SPACE TO BE OCCUPIED. MJP (PC# 131-97) DR#145-96 #120- 95
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance10/16/199710/16/199710/16/1997 PASS
Letter of Compliance #12964 issued to the EA L.L.C. Business ofc./warehouse bldg.
INSP - Final10/15/199710/16/199710/16/1997APASS
DetailsJim Storey
10/16/97 301 - FNL -OK FINAL routed for perm sign off with contractor to city hall.
INSP - Final10/6/199710/7/199710/7/1997APART
DetailsJim Storey
10/07/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED TEMP OCC OK GRAB BARS 24'' BACK OF STOOL, ADDRESS NUMBERS CHANGE REQUIST OR NEED POS PERMITED.
INSP-Final Inspection10/6/199710/6/199710/6/1997PPASS
DetailsRick Jackson
main exit door edge mount bolts removed. c/o approved.
INSP-Final Inspection9/26/19979/29/19979/29/1997AFAIL
DetailsRick Jackson
C/N ISSUED.
Routing for occupancy9/25/19979/25/19979/25/1997 PASS
Inspected by Art M. - meets compliance DR-145-96
INSP - Framing/Rough-in9/24/19979/25/19979/25/1997AFAIL
DetailsJim Storey
09/25/97 301 - PEE GRID PRISTOL CEILING CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in9/5/19979/8/19979/8/1997PPASS
DetailsJim Storey
09/08/97 301 - FRAM-OK FRAMING GWB -OK SHEETROCK NAILING
INSP - Framing/Rough-in9/5/19979/5/19979/5/1997PPART
DetailsJim Storey
09/05/97 301 - OTH-OTHER AGENCIES NOT APPROVED CORR-CORREC-CA
INSP - Framing/Rough-in8/26/19978/27/19978/27/1997PFAIL
DetailsJim Storey
08/27/97 301 - FRAMING AND FIRE RATED SHEET ROCK CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Conference8/26/19978/26/19978/26/1997 PASS
DetailsJim Storey
/ / 301 - NWP -GENERAL INSPECTION - NO WORK IN PROGRESS recieved engineers reports stamped approval.
INSP - Carpentry8/14/19978/14/19978/14/1997PPASS
DetailsJim Storey
part framing ok to do first layer of ceilling.
INSP - Framing/Rough-in8/13/19978/13/19978/13/1997PPASS
DetailsJim Storey
08/13/97 301 - RF -OK ROOF NAILING f occ.
INSP - Masonry7/30/19977/31/19977/31/1997A
Details
They do have a special inspector and they will be ready to pour at 2:30
INSP - Masonry7/29/19977/30/19977/30/1997APASS
Details
07/30/97 333 - POURING AT 10:30 ok pending special insp reports
INSP - Masonry7/28/19977/29/19977/29/1997APART
Details
07/29/97 333 - POURING AT 10 A.M. SPEC. INSPECTOR ON SITE ok pending special insp reports
INSP - Masonry7/25/19977/28/19977/28/1997APASS
DetailsJim Storey
07/28/97 301 - READY AT 10:30 MASN-REBAR OK special insp report pending.
INSP - Masonry7/23/19977/24/19977/24/1997APASS
DetailsJim Storey
07/24/97 301 - recieved stampedreduction in f'c from engineer of record foundation
INSP - Masonry7/22/19977/23/19977/23/1997APART
DetailsJim Storey
07/23/97 301 - pouring about 11:30 a.m. special inspector on site. special insp.report pending
INSP - Foundation6/24/19976/24/19976/24/1997PPASS
DetailsJim Storey
06/24/97 301 - FDN -OK FOUNDATION
INSP - Footings6/19/19976/20/19976/20/1997APASS
DetailsJim Storey
06/20/97 301 - FOOTING REBAR FRMS-OK FORMS-REBAR engineer design for 2500 psi. ok
INSP - Footings6/19/19976/19/19976/19/1997PCANC
DetailsJim Storey
06/19/97 301 - cancled by contractor
INSP - Footings6/18/19976/18/19976/19/1997PPART
DetailsJim Storey
06/18/97 301 -
(F) Reprint permit  6/17/1997
90 day tracking............. 3/18/19976/16/1997 PEND
(F) Reprint permit  6/10/1997
Issue PAID IN FULL permit  6/9/1997
Plan assigned to (M_P)4/8/1997 6/6/1997 PASS
DetailsMike Phillips
06/06/97 12:25:54 DAR - this action updated by action script from <<>> in Case No. BLD97-0598
PLANS/APPL TAKEN TO FRONT DESK  6/6/1997 PASS
Received Certificate of Value  6/6/1997 PASS
Inspection Record Card- Bld  6/6/1997
Plan resubmittals received  6/6/1997 PASS
RECEIVED CER
Plan Reviewer's activity  6/6/1997 PASS
Telephone call  6/6/1997
PERMIT READY, FEE DUE
Print Occupancy Form  6/6/1997
Print Pending Permit.LaserJet4  6/6/1997 PASS
Plan Reviewer's activity  6/6/1997 PEND
WAITING FOR CURRENT CERTIFICATE OF VALUE FROM CONTRACTOR
Routing Off Site - A.C.H.D3/18/1997 6/6/1997 PASS
PACKAGE #4 CONTACTED T.J. SCOFIELD AT ###-#### TO TAKE PLANS OUT TO ACHD 5/2/97 RESUBS SENT TO ACHD. DAR ACHD FEES PAID
Routing - FIRE5/23/1997 5/28/1997 PASS
PACKAGE #1
Routing - PLAN CHECK4/15/1997 5/23/1997
PACKAGE #1
Routing - PLANNING5/15/1997 5/22/1997 PASS
X-ref: DR-145-96. Approved by MGS.
Routing - PUBLIC WORKS5/1/1997 5/14/1997 PASS
PACKAGE #2
Plan Reviewer's activity  5/6/1997 FAIL
SECOND CORRECTION NOTICE SENT
Routing - MECHANICAL  5/5/1997 PASS
PACKAGE #1 FIELD VERIFY
Plan resubmittals received  5/2/1997 PASS
Routing - FIRE4/11/1997 4/15/1997 FAIL
PACKAGE #1
Routing - PLAN CHECK3/24/1997 4/11/1997
PACKAGE #1
Print Pending Permit.LaserJet4  4/11/1997 FAIL
Plan Reviewer's activity  4/11/1997 FAIL
Routing - PUBLIC WORKS4/1/1997 4/10/1997 FAIL
NEEDS DRAINAGE PLAN REVISION.
Plan assigned to (RGG)3/18/1997 4/8/1997
Routing Off Site - STRUCTURAL3/18/1997 4/8/1997 FAIL
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO STAPLEY ENG. SECOND REVIEW WILL BE CONDUCTED BY CITY PLAN REVIEWER.
Routing - PLANNING3/26/1997 3/31/1997 FAIL
PACKAGE #2 ROUTE BACK TO PW WHEN DONE IN P&Z X-ref: 145-96. Need revised landscape/site plan per DR conditions. Phoned TJ Scofield 3/31/97. Reviewed by MS.
Plan resubmittals received  3/27/1997 PASS
REVISED S.1 SITE PLAN RECEIVED AND PUT INTO PACKAGE #2
Routing - PLUMBING3/23/1997 3/24/1997 PASS
PACKAGE #1
Routing - ELECTRICAL3/18/1997 3/23/1997 PASS
PACKAGE #1
Routing - PUBLIC WORKS3/18/1997 3/21/1997 FAIL
PACKAGE #2 REQUIRES PROOF OF LEGAL LAND DIVISION AND REQUIRES DRAINAGE PLAN REVISION.
Plans ACCEPTED BY PLAN CHECK  3/18/1997 PASS
Received Certificate of Value  3/18/1997 PEND
NEEDS TO CALL OUT ELEC. PLUMB. AND MECH.
Recd Pcfee & Taken To Pln CK  3/18/1997
Plan assigned to (MYS)3/18/1997 3/18/1997 PEND
DetailsMarlene Southard
Plan routing begun/NEW & ADDTN  3/18/1997 PASS
Application received  3/18/1997
Routing Off Site - STRUCTURAL5/5/1997   PASS
SECOND REVIEW WILL BE CONDUCTED CITY'S PLAN REVIEWER