THE BOISE SPECTRUM BUILDING "C" (SHELL BUILDING) - TO BUILD A NEW 23,190 SQUARE FOOT, ONE STORY, SHELL BUILDING CONSTRUCTED OF A CONCRETE SLAB FLOOR, STEEL STRUCTURAL COLUMNS AND BEAMS, STEEL JOISTS AND METAL ROOF DECK WITH BUILT-UP ROOFING AND METAL ROOFING AT THE PITCHED ROOF AREAS, AND STEEL STUD EXTERIOR WALLS. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THE SPRINLERS ARE BEING USED FOR ONE-HOUR FIRE-RESISTIVE SUBSTITUTION. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THIS PERMIT IS FOR A SHELL BUILDING ONLY; AND THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT WILL BE REQUIRED TO FINISH EACH TENANT SPACE. THE APPLICANT HAS INDICATED THAT THIS SHELL BUILDING IS FOR A3 ASSEMBLY AND M RETAIL OCCUPANCIES. THIS BUILDING IS AT ITS MAXIMUM ALLOWABLE AREA AND MUST MAINTAIN 60 FOOT YARDS ON THREE SIDES, NO ADDITIONAL SQUARE FOOTAGE MAY BE ADDED TO THIS BUILDING AND THE AMOUNT OF ASSEMBLY OCCUPANCIES ARE LIMITED TO THE PROPOSED AREA. ANY OTHER PROPOSED OCCUPANCY GROUP MUST MEET ALL APPLICABLE CODE REQUIREMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DR#25-97/PC#-135-97/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/2/2014 DONE
Case Summary (BLD)  1/2/2014 DONE
FIRE-Final Inspection12/14/199912/16/199912/16/1999APART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 12/14/1999 at 10:26:49. Contact: ###-####. Conf. On spklr. Coverage for concealed spaces and exception to code.
FIRE-Final Inspection12/14/199912/14/199912/14/1999PPASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 12/14/1999 at 10:32:42. Contact: ###-####. Reinsp. Ok for certificate of completion.
BLD-Final12/14/199912/14/199912/14/1999PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/14/1999 at 10:33:23. Contact: ###-####. Bldg. "C", shell ok for L/C.
INSP - Final8/17/19998/17/19998/17/1999 FAIL
other agencies not approved fire c/n frpom 04 of 1998
INSP-Conference8/17/1999 8/17/1999 PEND
with g kulchek on the l/c there is an active c/n for the shell by fire insp 406. He is to call 406 and arrange getting this taken care of
INSP - Final4/15/19994/15/19994/15/1999 FAIL
DetailsJoe Tawney
/ / 406 - REINSP FAIL LETTER OF COMPL NOT YET ISSUED, SPKLR RISER ROOM
INSP-Final Inspection3/19/19983/20/19983/20/1998PFAIL
DetailsJoe Tawney
03/20/98 406 - BLDG C--BILL ###-#### FINAL ON SHELL FAIL ALARM SYSYEM NOT TESTED WITH APPR PLANS
INSP - Final3/19/19983/20/19983/20/1998PPART
Details
03/20/98 338 - TEMP MADE PK WHEN COMPLETED AND OOOR HARDWARE IS INSTALLE
INSP-Sprinkler Rough-in/Hydro2/23/19982/24/19982/24/1998APART
DetailsJoe Tawney
02/24/98 406 - shelly ###-#### OK ON HYDRO TEST EXCEPT FDC PIPING PARTIAL OK ON SPKLR ROUGH IN
INSP - Framing/Rough-in1/22/19981/22/19981/22/1998 PASS
Details
/ / 338 - for the ext wall cover on the inside of yen ching only
INSP - Framing/Rough-in12/1/199712/1/199712/1/1997PPART
Details
12/01/97 338 -
INSP - Framing/Rough-in10/22/199710/22/199710/22/1997PPART
Details
STEEL FRAMING corridor wall tunnel conference with Bob Leonard and the super
INSP-Supply line flush9/15/19979/15/19979/15/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP-Sprinkler Rough-in/Hydro9/11/19979/12/19979/12/1997ANR
DetailsJoe Tawney
09/12/97 406 - THESE ARE ALL UNDER GROUND UNDERGROUND FLUSH NOT READY RESCH
(F) Reprint permit  8/25/1997
INSP - Foundation8/19/19978/20/19978/19/1997ACANC
Details
foundation wall inspection only mis early start permit allowed for concrete on this project per 338
INSP - Footings8/19/19978/19/19978/19/1997PNR
Details
08/19/97 338 - this is to be a MIS PERMIT FOR ALL STR CONCRETE
Plan assigned to (JCM)4/9/1997 8/18/1997 PASS
DetailsJohn Menard
Routing - MECHANICAL8/18/1997 8/18/1997 PASS
PACKAGE #1 - SHELL PERMIT ONLY - FIELD VERIFY MECHANICAL INSTALLATION.
Routing - PLAN CHECK8/13/1997 8/18/1997 PASS
Routing - PLAN CHECK8/12/1997 8/18/1997 PASS
Inspection Record Card- Bld  8/18/1997
PLANS/APPL TAKEN TO FRONT DESK  8/18/1997 PASS
Print Occupancy Form  8/18/1997
Issue PAID IN FULL permit  8/18/1997
Telephone call  8/18/1997
PERMIT READY, FEE DUE
Routing - PLANNING8/12/1997 8/13/1997 PASS
X-REF: DR-93-96. APPROVED BY MGS.
Routing - PLANNING8/4/1997 8/11/1997 FAIL
X-REF: CU-44-96 & DR-93-96. CU APPROVED BY RC. DR FAILED BY MGS. PLANS HAVE NOT BEEN REVISED PER DR CONDITIONS. PHONED BRIAN WITH HAWKINS-SMITH 8/11/97.
Plan resubmittals received  8/6/1997 PASS
Routing - PUBLIC WORKS7/25/1997 8/4/1997 PASS
Routing Off Site - STRUCTURAL7/22/1997 7/28/1997 PASS
TO CH2MHILL RESUBS PACKAGE #3
INSP - Footings7/25/19977/25/19977/25/1997PPART
Details
07/25/97 338 - for early start permit only
INSP - Conference7/25/19977/25/19977/25/1997 PART
Details
/ / 338 - with hawkins smith they will be down directly to office with apppand check for the same
INSP - Conference7/25/19977/25/19977/25/1997 PASS
Details
/ / 338 - caled gslane and bgarrisson to find out why full permit body
INSP - Miscellaneous7/25/19977/25/19977/25/1997 PASS
Details
/ / 338 - RETURN TO THE JOBSITE TO RETRIEVE INVALID ISSUED PERMIT
Routing - PLAN CHECK4/21/1997 7/25/1997
PACKAGE #2
Plan resubmittals requested  7/24/1997 PEND
THIRD CORRECTIO LIST WAS FAXED AND MAILED TO RONALD BERKHARDT AT PERKOWITZ + RUTH.
Routing - PLAN CHECK6/23/1997 7/22/1997 PEND
PACKAGE #3
Plan resubmittals received  7/11/1997 PEND
THIS RESUBMITTAL INCLUDES CHANGES TO BUILDING CONSTRUCTION TYPE AND OCCUPANCY GROUP, AS WELL AS, NUMEROUS CHANGES ORIGINATED BY THE APPLICANT.
Routing Off Site - STRUCTURAL6/10/1997 6/23/1997 PEND
RESUBMITTALS FAXED A COPY OF THE STRUCTURAL CORRECTION LIST TO RILEY MAHAFFEY AT ATWOOD-HINZMAN-JONES 6-23-97 3:00
90 day tracking............. 3/20/19976/18/1997
Plan resubmittals requested  6/16/1997 PEND
Plan resubmittals received  6/5/1997 PEND
Routing Off Site - STRUCTURAL4/1/1997 5/6/1997
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL ATTEN: CRAIG BARRETT
Routing - ELECTRICAL4/30/1997 5/6/1997 PASS
Routing - PLAN CHECK4/4/1997 4/28/1997
PACKAGE #1
Routing - FIRE4/14/1997 4/28/1997 PASS
PACKAGE #1
Routing - PUBLIC WORKS4/17/1997 4/21/1997 PASS
PACKAGE #2
Plan resubmittals requested  4/14/1997 PEND
CORRECTION LIST FAXED AND MAILED TO RICK OVERLY AT PERKOWITZ+RUTH.
Plan assigned to (RGG)3/20/1997 4/9/1997
Routing Off Site - A.C.H.D3/21/1997 4/3/1997 PEND
PACKAGE #4 CONTACTED DOUG MATTHEWS AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES NOT PAID 04/03/97. DAR
Routing - PLANNING3/28/1997 4/3/1997 PASS
PACKAGE #2 X-ref: CU-44-96, DR-93-96. Approved by RC & MS.
Routing - ELECTRICAL3/27/1997 4/1/1997 PEND
PACKAGE #1
Routing - PLUMBING3/21/1997 3/24/1997 PASS
PACKAGE #1
Plans ACCEPTED BY PLAN CHECK  3/21/1997 PASS
RECEIVED - PACKAGE #1 SIGNED STRUC. SHEETS PACKAGE #2 LANDSCAPE AND DRAINAGE PLANS PACKAGE #3 SIGNED STRUC. SHEETS PACKAGE #4 DRAINAGE PLANS. STILL WAITING FOR SOILS REPORT. CONTACTE RON BERNHARDT OF THIS NEED RECEIVED SOILS REPORT 3-30-97 NOW READY TO ROUTE TO CH2MHILL. 4-1-97
Routing - PUBLIC WORKS3/21/1997 3/21/1997 FAIL
PACKAGE #2 INCOMPLETE SITE PLAN NO PARCEL BOUNDARIES SHOWN PER BRAD BISHOP.
Plan routing begun/NEW & ADDTN  3/21/1997 PASS
SEE ACTION 007 PASS
Plan routing begun/NEW & ADDTN  3/20/1997 HOLD
SEE ACTION 007
Received Certificate of Value  3/20/1997 PASS
Plans ACCEPTED BY PLAN CHECK  3/20/1997 HOLD
PACKAGE #1 REQUIRES STRUC. SHEETS TO BE SIGNED PACKAGE #2 REQUIRES LANDSCAPE AND DRAINAGE PLAN AND CALCS. PACKAGE #3 REQUIRES SOILS REPORT AND SIGNED STRUC. SHEETS PACKAGE #4 REQUIRES DRAINAGE PLANS. INFORMED RON BERNHARDT OF THESE NEEDS.
Application received  3/18/1997