Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD97-00642
StatusFinaled
Name BAKER MICHAEL W & PATRICIA A
Site Address 1010 S ORCHARD ST
Project NameBON VOYAGE LTD.
Customer Number 
ePlanReviewNo
Description
BON VOYAGE LDT. * TO CONSTRUCT A NEW SINGLE STORY, WOOD FRAMED, TYPE V NONRATED, 2,916 SQ.FT. OFFICE BUILDING AND RELATED SITE WORK. TO REMOVE TWO EXISTING STRUCTURES ONE TWO CAR GARAGE AND THE EXISTING HOUSE AS NOTED ON PLANS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI STANDARDS AND THE 1994 EDITION OF THE UBC. PHASING OF DEMO AND CONSTRUCTION WILL BE APPROVED PER THE BUILDING INSPECTOR. MJP (PC# 145-97) DR#4-97
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/14/1998 7/14/1998
(F) Reprint permit  2/4/1998
(F) Reprint permit  2/4/1998
FEE REVIEW-NOTES  2/4/1998 REFU
REFUND PER TIM HOGLAND
INSP - Final12/15/199712/16/199712/16/1997APASS
Details
12/16/97 338 - Final for Bon Voyage made ok ok for office to sign for me
Permanent occupancy  12/16/1997 PASS
Perm. Occ. Cert. #7080 issued 12-16-97 to Bon Voyage, Ltd.
INSP-Final Inspection12/2/199712/2/199712/2/1997 PASS
REINSP FOR FINAL ALARM TEST OK FOR PERM OCC
Routing for occupancy8/26/19978/26/199710/30/1997 PASS
Inspected by Scott Brown - Bonded for Parking/Landscaping Bond for $24,315.00- Temporary signed Final Occupancy signed by: Scott M. Brown
INSP-Final Inspection10/28/199710/29/199710/29/1997ACANC
DetailsJoe Tawney
10/29/97 406 - REINSP FOR PERM OCC CANCEL RESCH FOR 10/30/97
Routing Off Site - STRUCTURAL8/26/1997 10/3/1997
PACKAGE #3 SENT TO CH2MHILL.
INSP - Temporary occupancy8/26/19978/27/19978/28/1997PPASS
Details
08/27/97 338 - temp ok pre pre con agreements
Temporary occupancy  8/27/1997 PASS
Temp. Occ. Cert. #3459 issued 8-27-97 to Bon Voyage Ltd.
INSP - Final8/20/19978/21/19978/21/1997ANR
Details
08/20/97 338 - not ready OTH-OTHER AGENCIES NOT APPROVED need fire etc said he called for fire an me
INSP-Final Inspection8/21/19978/21/19978/21/1997 PART
DetailsJoe Tawney
08/21/97 406 - FINAL OK FOR TEMP OCC ON NEW BLDG DEMO STILL TO BE DONE
INSP - Ceiling grid8/18/19978/18/19978/18/1997 PART
Details
08/18/97 338 - ok to drop the borders in
INSP - Ceiling grid8/18/19978/18/19978/18/1997 PART
Details
08/18/97 338 - ok to drop the borders in
INSP - Ceiling grid8/18/19978/18/19978/18/1997 PASS
Details
/ / 338 - made4 ok no seizemic required
Print Occupancy Form  8/14/1997
INSP - Framing/Rough-in7/14/19977/14/19977/14/1997PPASS
Details
07/14/97 338 - FRAM-OK FRAMING
INSP - Carpentry6/25/19976/26/19976/26/1997PPASS
Details
06/26/97 338 - ROOF NAILING made ok
90 day tracking............. 3/21/19976/19/1997 PEND
INSP - Conference6/11/19976/12/19976/12/1997PPASS
Details
06/12/97 338 - made ok pre job conf
INSP - Foundation6/10/19976/11/19976/10/1997APASS
Details
06/11/97 338 - r-bar placed ok to pour
(F) Reprint permit  6/10/1997
INSP - Footings6/9/19976/9/19976/9/1997 NR
Details
/ / 338 - will not be reaady till after lunch
INSP - Footings6/6/19976/9/19976/9/1997APASS
Details
06/09/97 338 - mae ok r-bar placed
INSP - Footings6/5/19976/6/19976/6/1997PCANC
Details
06/06/97 338 - cancelled by the concrete ctr.
Issue PAID IN FULL permit  6/5/1997
Inspection Record Card- Bld  6/4/1997
Routing Off Site - A.C.H.D6/4/1997 6/4/1997 PASS
WAITING FOR ACHD FEE RECEIPT RECEIVED ACHD FEE RECEIPT
Plan Reviewer's activity  6/4/1997 PASS
Print Pending Permit.LaserJet4  6/4/1997 PASS
RECEIVED ACHD FEE RECEIPT.
Telephone call  6/4/1997
TOLD THEM PERMIT READY
Plan Reviewer's activity  6/4/1997 PEND
Print Occupancy Form  6/4/1997
Plan resubmittals received  6/4/1997 PASS
RECEIVED ADDITIONAL STRUCTURAL CALCULATION AND DESIGNS FOR FOLLOW-UP REVIEW.
PLANS/APPL TAKEN TO FRONT DESK  6/4/1997 PASS
Plan assigned to (M_P)4/18/1997 6/4/1997 PASS
DetailsMike Phillips
06/04/97 12:18:42 DAR - this action updated by action script from <<>> in Case No. BLD97-0642
Routing Off Site - STRUCTURAL5/20/1997 6/3/1997 PASS
RESUBS SENT TO STAPLEY ENGINEERING PER PDQ. REVIEW COMPLETED FROM STAPLEY ENGINEERING ON 5/30/97 WITH A FEW ADDITIONAL CONCERNS WAITING TO ARIVE. FINAL PLAN REVIEW COMPLETED BY IN HOUSE PLAN REVIEWER. FINAL COMMENTS RECEIVED FROM PINNACLE ENGINEERS ON 6/4/97 STRUCTURAL PLAN REVIEW COMPLETE.
Plan Reviewer's activity  5/23/1997 PEND
WAITING FOR STRUCTURAL APPROVAL FROM OUTSIDE ENGINEER AND CLARIFICATION OF SHEET A-3 TO DO WITH DETAIL 1&2 ON SHETET A-4
Routing Off Site - STRUCTURAL4/30/1997 5/6/1997
COMMENTS ONLY RETURNED, NO PLANS RETURNED AT THIS TIME.
Routing - MECHANICAL  5/2/1997 PASS
PACKAGE #1 FIELD VERIFIED
Routing - FIRE4/18/1997 5/1/1997 PASS
PACKAGE #1
Routing - PUBLIC WORKS4/16/1997 4/21/1997 PASS
PACKAGE #2
Routing - PLAN CHECK3/31/1997 4/18/1997
PACKAGE #1
Plan assigned to (RGG)3/24/1997 4/18/1997
Print Pending Permit.LaserJet4  4/18/1997 FAIL
Plan Reviewer's activity  4/18/1997 FAIL
SENDING COMPLETE FIRST CORRECTION NOTICE
Routing Off Site - STRUCTURAL3/26/1997 4/16/1997
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO STAPLEY ENG. PLANS RETAINED BY STAPLEY ENGINEERING. 4/16/97 DAR
Routing - PLAN CHECK4/1/1997 4/16/1997
PACKAGE #2
Routing Off Site - A.C.H.D3/26/1997 4/16/1997 PEND
PACKAGE #4 CONTACTED MIKE BAKER AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES DUE 4/16/97 DAR
Routing - ELECTRICAL3/27/1997 3/31/1997 PASS
PACKAGE #1
Routing - PLANNING3/28/1997 3/31/1997 PASS
PACKAGE #2 X-ref: DR-4-97. Approved by MS.
Routing - PUBLIC WORKS3/26/1997 3/28/1997 FAIL
PACKAGE #2 REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY.
Routing - PLUMBING3/26/1997 3/27/1997 PASS
PACKAGE #1
Plan routing begun/NEW & ADDTN  3/26/1997 PASS
Plan assigned to (MYS)3/21/1997 3/24/1997
DetailsMarlene Southard
Application received  3/21/1997
Recd Pcfee & Taken To Pln CK  3/21/1997
Received Certificate of Value  3/21/1997 PSDD
Plans ACCEPTED BY PLAN CHECK  3/21/1997 PASS